Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberBLD01-00831
StatusFinaled
Name OPAL J DOUGLAS
Site Address 2426 S SEA PINES PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To conctruct a new 1040s.f. 1-story townhouse with a 400s.f. attached 2-car garage per the approved plans, colored markings and attached requirement lists. This unit to be constructed with a full 1-hour wall at the zero lot line wall of the garage. Zoned R-2 per CU-10-91 by rhj. This lot is within the airport influence area and is to be constructed per attached requirement list. PC# 0230 pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/7/200112/7/200112/7/2001PPASS
DetailsTom Arcoraci
###-####
DOC - Permit Finaled12/7/200112/7/200112/7/2001PPASS
DetailsTom Arcoraci
Finaled by inspector at 12/7/2001 2:56:50 PM
BLD-Aging Inspection10/15/200110/15/200110/15/2001 PASS
DetailsTom Arcoraci
wip 10/15/2001 8:46:14 AM
BLD-Energy code compliance8/14/20018/15/20018/15/2001APASS
DetailsTom Arcoraci
###-####
BLD-Framing/Rough-in8/8/20018/8/20018/8/2001PFAIL
DetailsDave Hannah
###-#### c/n on site needs mec rough in ok to insulate after mec rough in 8/8/2001 2:39:33 PM
BLD-Framing/Rough-in6/11/20016/11/20016/11/2001PPART
DetailsTom Arcoraci
fire wall and shear nail insp ###-#### one hour wall ok 6/11/2001 4:00:49 AM
BLD-Framing/Rough-in5/30/20015/31/20015/31/2001PPART
DetailsTom Arcoraci
###-#### 1 HOUR WALL OK 5/31/2001 2:19:02 PM
BLD-Foundation5/7/20015/8/20015/8/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/07/2001 at 09:19:05. Contact: ###-####.
BLD-Footing5/3/20015/4/20015/4/2001APART
DetailsTom Arcoraci
ft- ###-#### -douglas wip 5/4/2001 11:01:59 AM
BLD-Footing4/17/20014/18/20014/18/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/17/2001 at 16:44:12. Contact: ###-####. wip needs vert joint at footing and wall with reabar at joints 4/18/2001 1:51:28 PM
Issue PAID IN FULL permit  4/16/2001  
Plan assigned to (PEP)4/12/2001 4/13/2001 PASS
DetailsPerry Paine
4/13/2001 08:44:29 PEP - activity updated through activity BLDA022 from case BLD01-00831.
Inspector's copy Bld permit  4/13/2001 DONE
Plan Review Report  4/13/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/13/2001 DONE
Inspection Record Card- Bld  4/13/2001 DONE
Telephone call  4/13/2001 DONE
left mess that permit is ready
Pending Assignment by DJO4/3/2001 4/12/2001 DONE
DetailsDan Overy
4/12/2001 10:09:47 PEP - activity updated through activity BLDA176 from case BLD01-00831.
Routing - PLANNING4/3/20014/3/20014/4/2001 PASS
Routing - PUBLIC WORKS4/3/20014/3/20014/4/2001 DONE
fees to be paid to bench sewer dist./lw
Application received  4/3/2001  
Routing - PLAN CHECK4/4/20014/4/2001  PEND