Fee Review-notes | 7/7/2003 | 7/7/2003 | 7/7/2003 | | DONE |
|
|
|
|
BLD-Final | 9/18/2002 | 9/19/2002 | 9/19/2002 | A | PASS |
Tom Arcoraci
|
|
|
ok for perm 9/18/2002 4:18:19 PM
|
Permanent occupancy | | | 9/19/2002 | | DONE |
|
|
|
Perm. occ. Cert. #9365 issued 9-19-02 to the Bethel Street Apts.
|
Permanent Occupancy | | 9/18/2002 | 9/18/2002 | | DONE |
|
|
|
|
Code Occupancy Approval Temp | 4/18/2002 | 4/17/2002 | 4/24/2002 | A | DONE |
Scott M.Brown
|
|
|
BOND IN PLACE FOR LANDSCAPE AND OTHER REQUIRED IMPROVEMENTS, TEMP SIGNED OFF. 4/18/2002 8:52:08 AM
|
Temporary occupancy | | | 4/19/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4795 issued 4-19-02 to the Bethel Street Apts., Bldg. #10.
|
BLD-Final | 4/17/2002 | 4/18/2002 | 4/18/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### nick ok for temp 4/18/2002 4:17:51 PM
|
FIRE-Final Inspection | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Energy code compliance | 2/14/2002 | 2/15/2002 | 2/15/2002 | A | PASS |
Tom Arcoraci
|
|
|
nick-- ###-#### energy code
|
BLD-Framing/Rough-in | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | PART |
Russ Owen
|
|
|
###-####. Needs truss ge1 at upper floor deck approved for bearing c/n posted. 2/12/2002 12:09:25 PM
|
BLD-Other | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 07:03:07. Contact: ###-####. hds installed 2/6/2002 1:57:49 PM
|
BLD-Framing/Rough-in | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | PART |
Tom Arcoraci
|
|
|
shear wall\\###-#### ok to rock entry walls not ok for missed hds at windows 1/25/2002 11:38:04 AM
|
BLD-Foundation | 1/4/2002 | 1/7/2002 | 1/7/2002 | A | PART |
Tom Arcoraci
|
|
|
###-####
|
BLD-Footing | 1/4/2002 | 1/7/2002 | 1/7/2002 | A | PART |
Tom Arcoraci
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 1/4/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/6/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/6/2001 | | DONE |
|
|
|
permit ready
|
Routing - PUBLIC WORKS | 11/2/2001 | | 11/2/2001 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/30/2001 | | 11/2/2001 | | PASS |
|
|
|
New parcel #'s will need to be entered from subdivision. Routed to Public Works.
|
Plan Reviewer's activity | | | 11/2/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/2/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/2/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 4/6/2001 | | 11/2/2001 | | PASS |
Mike Phillips
|
|
|
11/2/2001 15:48:56 M_P - activity updated through activity BLDA022 from case BLD01-00872.
|
Routing - PLAN CHECK | 10/5/2001 | | 10/30/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 10/30/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 10/30/2001 | | |
|
|
|
|
Routing - PLUMBING | 10/5/2001 | | 10/5/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/2/2001 | | 10/5/2001 | | |
|
|
|
|
Plan resubmittals received | | | 10/5/2001 | | DONE |
|
|
|
Received two copies of revised sheetsA8.0, A7.1 and one cover letter. Routed to Mike P. kmm
|
Routing - PLUMBING | 10/1/2001 | | 10/2/2001 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 9/28/2001 | | 10/1/2001 | | PEND |
|
|
|
Waiting for other to approve prior to issuing permit.
|
Routing - FIRE | 9/25/2001 | | 9/26/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/25/2001 | | DONE |
|
|
|
Received one copy or revised sheets T-1, SITE, GRD, ST-P, S-1, S-2, DT-1, and one copy of water plan, by United Water Idaho. routed to mike p. kmm
|
Routing - PLUMBING | 9/25/2001 | | 9/25/2001 | | FAIL |
|
|
|
submit a civil plan showing water service size and location and 1% min. grade on sewer mains.
|
Routing - PUBLIC WORKS | 9/24/2001 | | 9/24/2001 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 9/13/2001 | | 9/24/2001 | | |
|
|
|
|
Plan resubmittals received | | | 9/19/2001 | | DONE |
|
|
|
Received two copies of sheets A.1.0, A1.1, A2.0, A2.1, A3.0, A7.1, M1.0, two copies of struct. calcs and one copy of cover letter. Routed to Mike P. KMM
|
Routing - PLANNING | 9/12/2001 | | 9/13/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/7/2001 | | 9/12/2001 | | HOLD |
|
|
|
FAILED IN ALL DIVISIONS. Subdivision in process. Hold waiting for resubmittals.
|
Routing - PLUMBING | 9/6/2001 | | 9/7/2001 | | FAIL |
|
|
|
|
Routing - PLANNING | 9/4/2001 | | 9/6/2001 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 9/6/2001 | | DONE |
|
|
|
received 4 sheets of revised site plan and routed to Sev Jones
|
Plan resubmittals received | | | 9/6/2001 | | DONE |
|
|
|
Received two copies of revised sheets P1.0, P1.1, P2.0. Put with plans and routed to Plumbing. kmm
|
Routing - PLAN CHECK | 7/25/2001 | | 8/31/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS | 8/31/2001 | | 8/31/2001 | | FAIL |
|
|
|
Subdivision has not been recorded per Addressing.
|
Routing - FIRE | 7/23/2001 | | 7/25/2001 | | FAIL |
|
|
|
hydrant locations for enire complex
|
Routing - PLAN CHECK | 6/1/2001 | | 7/23/2001 | | FAIL |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 7/23/2001 | | FAIL |
|
|
|
Additional information required for a further review prior to issuing permit.
|
Plan Reviewer's activity | | | 6/14/2001 | | FAIL |
|
|
|
Waiting for structural calculations.
|
Routing - PLUMBING | 5/23/2001 | | 5/31/2001 | | FAIL |
|
|
|
see plumb. activity on bld01-00863 for details
|
Routing - PLANNING | 4/24/2001 | | 5/22/2001 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 4/12/2001 | | 4/24/2001 | | FAIL |
|
|
|
requires drainage plan revisions.
|
Plan routing begun/NEW & ADDTN | | | 4/12/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/12/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 4/11/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/6/2001 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/6/2001 | | |
|
|
|
|
Application received | | | 4/6/2001 | | |
|
|
|
|