BLD-Final | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | PASS |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--call 1st before insp .................. c.c # 1/21/2003 2:59:49 PM
|
DOC - Permit Finaled | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 1/21/2003 3:00:08 PM
|
BLD-Final | 12/23/2002 | 12/24/2002 | 12/24/2002 | A | FAIL |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n on site 12/24/2002 9:56:05 AM
|
BLD-Energy code compliance | 8/16/2002 | 8/19/2002 | 8/19/2002 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | PART |
Dave Hannah
|
|
|
###-#### CALL FIRST int shear walls ok to cover also insulation ok to cover top floor 8/16/2002 11:17:11 AM
|
BLD-Conference | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | DONE |
Dave Hannah
|
|
|
CALL FIRST
|
BLD-Framing/Rough-in | 8/12/2002 | 8/12/2002 | 8/12/2002 | P | PART |
Dave Hannah
|
|
|
###-#### steve call 1st for access c/n items on tonys c/n are complete checked fire stopping looks ok the rest should be picked up by insulation ok to insulate 8/12/2002 2:07:59 PM
|
BLD-Framing/Rough-in | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | NR |
Steven Webb
|
|
|
STEVE PLEASE CALL BEFORE SO STEVE CAN LET YOU IN; Phone #: ###-#### Need trade sign off prior to framing. 8/9/2002 3:07:13 PM
|
BLD-Framing/Rough-in | 8/2/2002 | 8/2/2002 | 8/2/2002 | P | FAIL |
Tony Young
|
|
|
STEVE; Phone #: ###-####
need trades signed off first 8/2/2002 2:39:12 PM
|
BLD-Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PART |
Tony Young
|
|
|
###-#### Steve Trout call to meet there
fireblock issues, ok to use mineral wool fire rated insulation in hard to seal areas 6/10/2002 5:15:48 PM
|
BLD-Framing/Rough-in | 4/25/2002 | 4/26/2002 | 4/26/2002 | P | FAIL |
Tony Young
|
|
|
###-#### late pm
C/N POSTED 4/26/2002 3:04:54 PM
|
BLD-Framing/Rough-in | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PART |
Tony Young
|
|
|
SHEER WALL ###-#### PLEASE CALL FOR ACCESS
all ext. walls ok to cover exterior 4/2/2002 12:00:52 PM
|
BLD-Framing/Rough-in | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | PART |
Steven Webb
|
|
|
STEVE ###-#### SHEER WALL -- STUDIO shear--ok to side except SW2 wall on second floor not nailed per plans. 3/28/2002 10:28:56 AM
|
BLD-Framing/Rough-in | 3/5/2002 | 3/6/2002 | 3/6/2002 | A | FAIL |
Tony Young
|
|
|
###-####
not nailed per plan,, need new engineering on all changes 3/6/2002 12:47:48 PM
|
BLD-Framing/Rough-in | 2/15/2002 | 2/15/2002 | 2/15/2002 | P | PART |
Jim Storey
|
|
|
###-#### STEVE exterior 1 pannels ok all 2 thur 5 pannels requir double 2x blk/ and a conversion for staples from 8pp naills/ ok to cover all #1 pannels. 2/15/2002 2:44:11 PM
|
BLD-Aging Inspection | 1/28/2002 | 1/28/2002 | 1/28/2002 | | PART |
Tony Young
|
|
|
|
BLD-Foundation | 11/26/2001 | 11/27/2001 | 11/27/2001 | P | FAIL |
Tony Young
|
|
|
###-#### STEVE
need letter of compliance from structural engineer for as built, changes made w/out notifying and no approved plans on site, some ftgs poured w/out inspection from us.
called steve to let him know and he agreed to do so. 11/27/2001 2:00:32 PM
|
BLD-Grading Inspection | 11/13/2001 | 11/13/2001 | 11/13/2001 | | PASS |
Rita DeYoung
|
|
|
Engineer has approved footing subgrade for lower level foundation.
|
BLD-Footing | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PART |
Tony Young
|
|
|
###-#### STEVE
wip,pending soil rpt 11/9/2001 2:39:39 PM
|
BLD-Foundation | 10/22/2001 | 10/23/2001 | 10/23/2001 | A | PART |
Steven Webb
|
|
|
###-#### STEVE wip--appears ok-- 10/23/2001 10:11:30 AM
|
BLD-Footing | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### wip ok rear of house 10/4/2001 11:36:17 AM
|
BLD-Grading Inspection | 9/24/2001 | 9/24/2001 | 9/24/2001 | | PASS |
Rita DeYoung
|
|
|
The subgrade for the upper level footing has been approved by the geotechnical engineer.
|
Issue PAID IN FULL permit | | | 8/7/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 6/5/2001 | 6/5/2001 | 6/12/2001 | | PASS |
Dan Overy
|
|
|
6/12/2001 06:19:36 DJO - activity updated through activity BLDA022 from case BLD01-01219.
|
Plan Reviewer's activity | | | 6/12/2001 | | DONE |
|
|
|
received fax with additional information needed. have red-lined plans to indicate changes.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/12/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 6/12/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/12/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan Reviewer's activity | | | 6/5/2001 | | PEND |
|
|
|
spoke with steve trout today about issues that need resolved before issuance.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/5/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS | 5/8/2001 | 5/8/2001 | 5/15/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 5/8/2001 | 5/8/2001 | 5/15/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 5/8/2001 | 5/8/2001 | 5/14/2001 | | DONE |
Rita DeYoung
|
|
|
Approved as Category 1
|
Application received | | | 5/8/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 5/15/2001 | 5/15/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 5/8/2001 | | | | PASS |
Dan Overy
|
|
|
per cfh01-00010
|