Fee Review-notes | 9/17/2001 | 9/17/2001 | 7/22/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/3/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9153 issued to Home Federal Savings and Loan Association
|
Permanent Occupancy | | 5/31/2002 | 5/31/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 14:05:46. Contact: ###-####.
|
BLD-Final | 5/30/2002 | 5/31/2002 | 5/31/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 14:07:30. Contact: ###-####. final ok 5/31/2002 4:52:43 PM
|
FIRE-Final Inspection | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 11:14:48. Contact: ###-####. exit sign above door 111 and remote LED lights for smoke detector alarm are on when not in alarm; detectors properly shut down AHU's 5/24/2002 8:42:26 AM
|
BLD-Final | 5/23/2002 | 5/24/2002 | 5/24/2002 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 11:16:37. Contact: ###-####. DALE CALLED IN TO CANC... NOT READY YET 5-24-02 ///DLD
|
Code Occupancy Approval | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
PubWorks Occupancy Approval | 5/17/2002 | 5/17/2002 | 5/17/2002 | | DONE |
|
|
|
Final Occupancy signed 05/15/2002 R.Rokovitz
|
BLD-Framing/Rough-in | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | PASS |
Steven Webb
|
|
|
CEILING GRID-DALE ###-#### Ok to cover remaining areas. 5/9/2002 11:52:59 AM
|
BLD-Other | 5/2/2002 | 5/3/2002 | 5/3/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 14:39:18. Contact: ###-####. Suspended ceiling--c/n posted--ok to cover main area and perimeter of others. 5/3/2002 11:49:10 AM
|
BLD-Other | 4/11/2002 | 4/11/2002 | 4/11/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 11:11:45. Contact: ###-####. ceilling at drive thru ok for cover. 4/11/2002 2:32:44 PM
|
BLD-Framing/Rough-in | 4/3/2002 | 4/4/2002 | 4/4/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 16:47:35. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/28/2002 at 09:18:00. Contact: ###-####. C/n posted in job shack. 3/28/2002 3:17:39 PM
|
BLD-Framing/Rough-in | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 08:03:19. Contact: ###-####. Shear only ok. 3/6/2002 1:45:46 PM
|
BLD-Framing/Rough-in | 3/4/2002 | 3/5/2002 | 3/5/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 17:31:34. Contact: ###-####. SHEAR--prior c/n items not completed--completed and recall. 3/5/2002 1:33:52 PM
|
BLD-Framing/Rough-in | 3/1/2002 | 3/4/2002 | 3/4/2002 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 15:08:03. Contact: . Builder not on site--no plans 3/4/2002 10:44:31 AM
|
BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 11:23:12. Contact: ###-####.C/n nail areas at locations of shear ,marked on walls with black ink,also need ok for sthd 14's to be replaved by hphd 5's, also a short 40 in shear panel on grid line 2 need ok as separation is not the required distance due to location not in corner at the end. 3/4/2002 1:51:54 PM
|
BLD-Footing | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/16/2002 at 16:18:18. Contact: ###-####. Footings on Grid line #3 and three dditional footings inside floor. Special inspection required. 1/17/2002 10:56:51 AM
|
BLD-Foundation | 1/12/2002 | 1/14/2002 | 1/14/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/12/2002 at 11:08:49. Contact: ###-####.
|
BLD-Foundation | 1/10/2002 | 1/11/2002 | 1/11/2002 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 12:24:36. Contact: . No approved plans on site--call for re-inspection. 1/11/2002 2:23:25 PM
|
BLD-Footing | 1/7/2002 | 1/8/2002 | 1/8/2002 | A | PART |
Steven Webb
|
|
|
###-#### Grid line#2-4 ok. 1/8/2002 8:40:12 AM
|
(F) Reprint permit | | | 12/18/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/17/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/29/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/29/2001 | | DONE |
|
|
|
gave fees due and needs achd//aim
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2001 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 9/18/2001 | | 11/28/2001 | | PASS |
Mike Otto
|
|
|
11/28/2001 08:40:11 MLO - activity updated through activity BLDA022 from case BLD01-02536.
|
Routing - PLANNING Land Div | 11/27/2001 | | 11/27/2001 | | PASS |
|
|
|
Ok for land division. Routed to Plan Review. (blc)
|
Routing - PLANNING Land Div | 11/16/2001 | | 11/21/2001 | | FAIL |
|
|
|
Still waiting for recorded copy of deed combining two parcels back into one. Russ Phillips was in and will try to get a copy faxed to us. Routed back to Plan Review. (blc)
|
Routing - PUBLIC WORKS | 11/15/2001 | | 11/15/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 11/1/2001 | | 11/15/2001 | | PASS |
|
|
|
Approved per DRH01-48.
|
Routing - PUBLIC WORKS | 10/29/2001 | | 11/1/2001 | | FAIL |
|
|
|
Needs Drainage Plan revision per Terry Records.
Needs proof of legal land division per April Miller.
|
Routing - FIRE | 10/26/2001 | 10/26/2001 | 10/26/2001 | | PASS |
Bill Alexander
|
|
|
|
Routing - FIRE | 10/23/2001 | 10/26/2001 | 10/26/2001 | | FAIL |
Bill Alexander
|
|
|
Lack verifiable hydrant location on plans meeting UFC 903.4
|
Plan Review Completed(1st rev) | | | 10/26/2001 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 10/26/2001 | | 10/26/2001 | | FAIL |
|
|
|
correction on exit faxed to architect.
|
Plan resubmittals requested | | | 10/26/2001 | | FAIL |
|
|
|
exit correction
|
Routing - PLAN CHECK | 10/26/2001 | | 10/26/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/26/2001 | | DONE |
|
|
|
received fax from architect that no locks will be on door 111 with copy sent to tenant.
|
Plan resubmittals received | | | 10/25/2001 | | DONE |
|
|
|
Received revised sheets A5.1, A8.1, A9.1 two copies of schedules and one copy of cover letter. Routed to Mike O KMM
|
Plan resubmittals requested | | | 10/23/2001 | | FAIL |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 10/17/2001 | | 10/23/2001 | | FAIL |
|
|
|
corrections mailed and faxed to architect
|
Routing - PLUMBING | 10/9/2001 | | 10/17/2001 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PLANNING | 10/4/2001 | | 10/9/2001 | | FAIL |
|
|
|
Approved as per CUP01-00022 (Dave Abo). Plans do not comply with Design Review conditions of approval. Please note that applicant needs to obtain the Design Review Committee's approval at a worksession for the streetscape design.
|
Routing - PUBLIC WORKS | 9/26/2001 | | 10/4/2001 | | FAIL |
|
|
|
Requires 1.street light plan. per Bill Colson
2. Proof of legeal land division. per April Miller
3. Drainage plan revision per Terry Records.
kmm
|
Plans ACCEPTED BY PLAN TECH | | | 9/26/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 9/26/2001 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/18/2001 | | HOLD |
|
|
|
Requires 1. United Water letter
2. Correct code data on cover sheet or new cover sheet
3. Three extra civil sheets, O&M plan and drainage calcs
4. Updated cert. of value.
faxed and talked to Russ Phillips about above requests.
Plans in my hold box. KMM
9/25/01 Requires 1.two copies of revised cover sheet with correct Code Analysis. Faxed Russ Phillips
|
Plan routing begun/NEW & ADDTN | | | 9/18/2001 | | DONE |
|
|
|
|
Application received | | | 9/17/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/17/2001 | | DONE |
|
|
|
|