Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberBLD01-03117
StatusFinaled
Name TURNER-MCALVAIN CONSTRUCTION OFFICE
Site Address 190 E FRONT ST Unit: 111
Project NameCOURTHOUSE-CONST. OFFICE
Customer Number 
ePlanReviewNo
Description
(TURNER / MCALVAIN CONSTRUCTION) (COURTHOUSE GARAGE-1ST FLR) Fire sprinklers are used within this building to allow sloped ramps without shaft enclosures. To construct a 6,144 square foot office tenant space on the first floor of a parking garage building. Work is to include interior nonbearing walls, a 1-hr tenant demising wall, 2 restrooms accessible to the disabled, interior doors, interior finishes, and suspended ceilings all per approved drawings and plan review conditions on file. All work shall be compatible with the proposed future increase in height and area of this building. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. PC01-0898 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/14/20037/14/20037/14/2003 DONE
Permanent Occupancy 3/15/20023/15/2002 DONE
Details
BLD-Final3/14/20023/15/20023/15/2002APASS
DetailsCarl Dependahl
fn occ- jack- ###-#### card to contractor 3/15/2002 9:01:47 AM
Permanent occupancy  3/15/2002 DONE
Perm. Occ. Cert. #9069 issued 3-15-02 to Turner-McAlvain Construction Office.
BLD-Conference1/30/20021/30/20021/30/2002PPASS
DetailsCarl Dependahl
###-####, w/ bldr re final...need shell c/o for perm. 1/30/2002 5:47:24 PM
FIRE-Final Inspection1/29/20021/29/20021/29/2002PPASS
DetailsRick Jackson
fn fire jack --###-#### door hardware okay; exit signs okay; landing installed at sw exit; occ approved 1/29/2002 3:18:06 PM
FIRE-Final Inspection1/24/20021/25/20021/25/2002AFAIL
DetailsRick Jackson
###-#### landing; door hardware; exit signs 1/25/2002 11:12:12 AM
BLD-Final1/24/20021/25/20021/25/2002PPART
DetailsCarl Dependahl
###-####...c/n, bathrooms, exit doors, other perm finals. 1/25/2002 4:06:19 PM
FIRE-Final Inspection1/25/20021/25/20021/25/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 1/25/2002 11:11:46 AM
BLD-Other1/24/20021/24/20021/24/2002PPART
DetailsCarl Dependahl
jack ###-#### grid ok to tile 1/24/2002 3:20:27 PM
Override - Parcel Holds  1/24/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide: inspection only
BLD-Framing/Rough-in1/15/20021/16/20021/16/2002APART
DetailsCarl Dependahl
###-#### rest rm ok 1/16/2002 12:22:23 PM
Override - Parcel Holds  1/15/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
BLD-Framing/Rough-in1/14/20021/14/20021/14/2002PFAIL
DetailsCarl Dependahl
###-####, walls ok, still need hvac ok'd at restrooms...elec at grid. firestop floor drains 1/14/2002 2:13:21 PM
Override - Parcel Holds  1/14/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
Override - Parcel Holds  1/14/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
BLD-Framing/Rough-in1/2/20021/3/20021/3/2002AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/02/2002 at 15:58:41. Contact: . c/n, firestop plbg, glazing attachments, etc. ok to rock walls exc rest rms. 1/3/2002 6:10:49 PM
BLD-Framing/Rough-in1/3/20021/3/20021/3/2002PFAIL
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/3/2002 12:23:01 PM keep c/n, met w/ glazer 1/3/2002 6:17:15 PM
Issue PAID IN FULL permit  12/27/2001 DONE
Print Occupancy Form  12/21/2001 DONE
Inspection Record Card- Bld  12/21/2001 DONE
Telephone call  12/21/2001 DONE
permit ready
Routing - PLAN CHECK12/19/2001 12/20/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/20/2001 PASS
Plan assigned to (CJW)12/7/2001 12/20/2001 PASS
DetailsCarl Westfall
12/20/2001 13:15:21 CJW - activity updated through activity BLDA022 from case BLD01-03117.
Routing - FIRE12/18/2001 12/19/2001 PASS
Plan Review Completed(1st rev)  12/19/2001 PASS
Routing - PLAN CHECK12/13/2001 12/18/2001 PASS
UBC plan review started December 14, 2001 and finished December 18, 2001. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS12/7/2001 12/13/2001 PASS
First Notice12/3/200112/3/200112/3/2001 DONE
Plans ACCEPTED BY PLAN TECH  12/3/2001 DONE
1. Plans accepted by Carl Westfall.
Application received  12/3/2001  
Recd Pcfee & Taken To Pln CK  12/3/2001