Information based on query as of Saturday, September 28, 2024.
Permit Information
Permit NumberBLD02-00348
StatusFinaled
Name IDANHA BUILDING (CANOPIES)
Site Address 928 W MAIN ST
Project NameIDANHA
Customer Number 
ePlanReviewNo
Description
(IDANHA HOTEL - CANOPIES) The Idanha building is fire sprinklered under the provisions of the 1994 UCBC because it is too tall, too big, and has too many stories. To construct two canopies to serve the Idanha building. Each canopy will be 18 feet by 10.5 feet and about 16 feet tall. One canopy will serve the 10th Street entry and one canopy will serve the Main Street entry. Each canopy will be located above the public sidewalk. Approval by ACHD is required. Each canopy will be supported by the building and by 2 columns located in the public way. Each canopy will have a metal frame with a fabric covering. The fabric shall be flame retardant as defined by 1997 UBC Standard 31-1. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. DRH01-00028 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/21/20022/21/20024/30/2004 DONE
BLD-Aging Inspection8/7/20038/7/20038/7/2003 DONE
DetailsCarl Dependahl
work appears ok 8/7/2003 8:33:56 AM
DOC - Permit Expired8/7/20038/7/20038/7/2003APASS
DetailsCarl Dependahl
Expired by inspector at 8/7/2003 8:33:58 AM
BLD-Final5/29/20035/30/20035/30/2003ACANC
DetailsCarl Dependahl
brett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference5/22/20035/27/20035/27/2003ANR
DetailsCarl Dependahl
Brett ...awaiting verification & zoning oks 5/27/2003 3:13:17 PM
BLD-Conference5/22/20035/27/20035/27/2003ANR
DetailsCarl Dependahl
Brett ...awaiting verification & zoning oks 5/27/2003 3:13:17 PM
BLD-Conference5/22/20035/27/20035/27/2003ANR
DetailsCarl Dependahl
Brett ...awaiting verification & zoning oks 5/27/2003 3:13:17 PM
BLD-Conference5/22/20035/27/20035/27/2003ANR
DetailsCarl Dependahl
Brett ...awaiting verification & zoning oks 5/27/2003 3:13:17 PM
BLD-Final5/22/20035/23/20035/23/2003ACANC
DetailsDave Hannah
BLD-Final5/23/20035/23/20035/23/2003PCANC
DetailsDave Hannah
BLD-Conference5/21/20035/22/20035/22/2003APASS
DetailsCarl Dependahl
w/ Rick J. & Brett...need ACHD signature. 5/22/2003 10:39:39 AM
BLD-Final5/22/20035/22/20035/22/2003PCANC
DetailsTom Arcoraci
brett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection5/21/20035/22/20035/22/2003APASS
DetailsRick Jackson
brett; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Conference5/21/20035/21/20035/21/2003ANR
DetailsCarl Dependahl
left msg for Brett... 5/21/2003 4:22:02 PM
BLD-Final5/12/20035/13/20035/13/2003ANR
DetailsCarl Dependahl
brett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...need fire, ACHD, ok's for final...plans? 5/13/2003 1:50:42 PM
BLD-Footing10/23/200210/24/200210/24/2002APART
DetailsCarl Dependahl
###-#### brett ...ftgs originally poured w/ prior Idanha upgrade....matched t 10/24/02 11:01:27 AM ose details, foundation ext to grade ok pending ACHD permit...This is being called a pedestrian walkway??? Its a patio cover type structure. 10/24/02 11:02:46 AM
Issue PAID IN FULL permit  8/28/2002 DONE
Telephone call  7/24/2002 DONE
left mess for karen that permit is ready
Plan assigned to (CJW)2/26/2002 5/15/2002 PASS
DetailsCarl Westfall
5/15/2002 11:58:27 CJW - activity updated through activity BLDA022 from case BLD02-00348.
Routing - PLAN CHECK5/9/2002 5/15/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/15/2002 PASS
Inspection Record Card- Bld  5/15/2002  
Telephone call  5/15/2002 DONE
left mess for karen that permit is ready
Routing - FIRE5/9/20025/9/20025/9/2002 PASS
DetailsBill Alexander
Routing - PLAN CHECK3/22/2002 5/9/2002 PASS
Plan resubmittals received  5/8/2002 DONE
Received three copies of revised sheets. Routed to Carl W. kmm
Plan resubmittals received  4/5/2002 DONE
Received information from the Engineer about the canopy design.
Plan resubmittals received  4/1/2002 DONE
Received information from the architect about the canopy fabric.
Routing - FIRE3/19/20023/22/20023/22/2002  
DetailsBill Alexander
Need verification of membrane which will determine fire requirements.
Plan Review Completed(1st rev)  3/22/2002 DONE
Failed first UBC and UFC reviews.
Routing - PLAN CHECK3/4/2002 3/19/2002  
Failed first UBC review. UBC plan review started March 15, 2002 and finished March 19, 2002. A response from the architect and engineer was required. See the conditions list. A copy of the plan review report was sent to the architect.
Routing - PLANNING2/26/2002 3/4/2002 PASS
Approved as instructed by City Council action.
Plans ACCEPTED BY PLAN TECH  2/22/2002 DONE
Application received  2/21/2002  
Recd Pcfee & Taken To Pln CK  2/21/2002 DONE