Case Summary (BLD) | | | 6/15/2016 | | DONE |
|
|
|
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/11/2004 | 4/26/2005 | | DONE |
|
|
|
|
Fee Review-notes | 2/22/2002 | 2/22/2002 | 8/10/2004 | | DONE |
|
|
|
|
Permanent Occupancy | | 5/11/2004 | 5/11/2004 | | DONE |
|
|
|
|
BLD-Final | 5/11/2004 | 5/11/2004 | 5/11/2004 | A | PASS |
Dave Hannah
|
|
|
|
Permanent occupancy | | | 5/11/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10130 issued 5-11-04 to the Civic Plaza Apts., Bldg. A, sec. 1 of 6.
|
BLD-Final | 4/6/2004 | 4/7/2004 | 4/7/2004 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/6/2004 at 10:44:56 AM. Contact: ###-####.
|
FIRE-Final Inspection | 2/24/2004 | 2/25/2004 | 2/25/2004 | A | PASS |
Rick Jackson
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Final | 2/24/2004 | 2/25/2004 | 2/25/2004 | A | PART |
Dave Hannah
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for temp occ 2/25/2004 12:36:25 PM
|
Temporary occupancy | | | 2/25/2004 | | DONE |
|
|
|
Temp. Occ. Cert. #5078 issued 2-25-04 to the Civic Plaza Apts., Sec. 1 of 6.
|
BLD-Final | 2/23/2004 | 2/24/2004 | 2/24/2004 | P | NR |
Dave Hannah
|
|
|
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Final | 2/20/2004 | 2/23/2004 | 2/23/2004 | A | FAIL |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Code Occupancy Approval | | | 2/23/2004 | | PASS |
|
|
|
|
BLD-Final | 2/19/2004 | 2/20/2004 | 2/20/2004 | A | FAIL |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 2/17/2004 | 2/18/2004 | 2/18/2004 | A | NR |
Dave Hannah
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIRE-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 | A | FAIL |
Rick Jackson
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore need signs on FACP and sprinkler room doors; signs in stairwells; extinguishers in lobby and fire pump room; lobby doors can't locked to trap people in lobby area; need extinguishers in penthouse rooms and on all floors; need smoke seals on all rated doors and they must latch; need to verify emergency lighting in corridors; stairwells and exit systems must be free of construction materials; update keys in knox box; complete elevator recall/shunt and sign-off 2/18/2004 3:42:45 PM 2/18/2004 3:45:21 PM
|
BLD-Final | 2/9/2004 | 2/9/2004 | 2/9/2004 | P | NR |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 2/4/2004 | 2/4/2004 | 2/4/2004 | P | PART |
Dave Hannah
|
|
|
dennis ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 1/30/2004 | 1/30/2004 | 1/30/2004 | P | DONE |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Conference | 1/28/2004 | 1/29/2004 | 1/29/2004 | A | DONE |
Dave Hannah
|
|
|
PETE ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Conference | 1/28/2004 | 1/29/2004 | 1/29/2004 | A | DONE |
Dave Hannah
|
|
|
PETE ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 1/27/2004 | 1/27/2004 | 1/27/2004 | P | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 1/26/2004 | 1/26/2004 | 1/26/2004 | P | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 1/22/2004 | 1/23/2004 | 1/23/2004 | A | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 1/23/2004 | 1/23/2004 | 1/23/2004 | P | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 1/16/2004 | 1/20/2004 | 1/20/2004 | A | PART |
Dave Hannah
|
|
|
PETE ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 1/7/2004 | 1/7/2004 | 1/7/2004 | P | PART |
Dave Hannah
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 12/31/2003 | 1/5/2004 | 1/5/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/31/2003 at 3:53:45 PM.
|
BLD-Framing/Rough-in | 12/29/2003 | 12/31/2003 | 12/31/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/29/2003 at 3:08:18 PM.
|
BLD-Framing/Rough-in | 12/23/2003 | 12/24/2003 | 12/24/2003 | A | PART |
Dave Hannah
|
|
|
mcalvain construction; Phone #: ###-#### Internet Inspection Request from: Barbara Moore repares on shafts 12/24/2003 9:29:37 AM
|
BLD-Framing/Rough-in | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | DONE |
Dave Hannah
|
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 12/18/2003 | 12/19/2003 | 12/19/2003 | A | CANC |
Dave Hannah
|
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Aimee Hughesout of time rescheduled for pm 12/19/2003 11:55:16 AM
|
BLD-Framing/Rough-in | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | PART |
Dave Hannah
|
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes main level evevator lobby ok to hang lids 12/19/2003 2:33:14 PM
|
BLD-Framing/Rough-in | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | CANC |
Dave Hannah
|
|
|
12/18/2003 11:08:12 AM
|
BLD-Framing/Rough-in | 12/18/2003 | 12/18/2003 | 12/18/2003 | P | NR |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 12/15/2003 | 12/16/2003 | 12/16/2003 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/12/2003 at 9:43:04 AM.
|
BLD-Framing/Rough-in | 12/16/2003 | 12/16/2003 | 12/16/2003 | P | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 12/12/2003 | 12/15/2003 | 12/15/2003 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/12/2003 at 9:43:04 AM.
|
BLD-Framing/Rough-in | 12/12/2003 | 12/12/2003 | 12/12/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/12/2003 at 9:42:23 AM. sec floor ok to cover 12/12/2003 4:52:15 PM
|
BLD-Framing/Rough-in | 12/8/2003 | 12/9/2003 | 12/9/2003 | P | DONE |
Dave Hannah
|
|
|
Frank; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 12/5/2003 | 12/5/2003 | 12/5/2003 | P | PART |
Dave Hannah
|
|
|
Randy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 12/3/2003 | 12/3/2003 | 12/3/2003 | P | DONE |
Dave Hannah
|
|
|
Randy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 12/1/2003 | 12/1/2003 | 12/1/2003 | P | FAIL |
Dave Hannah
|
|
|
Randy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | PART |
Dave Hannah
|
|
|
Randy Internet Inspection Request from: Aimee Hughes 6th floor ok to cover 11/21/2003 11:47:33 AM
|
BLD-Framing/Rough-in | 11/20/2003 | 11/20/2003 | 11/20/2003 | P | NR |
Dave Hannah
|
|
|
Randy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 11/17/2003 | 11/18/2003 | 11/18/2003 | A | CANC |
Dave Hannah
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | PART |
Dave Hannah
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 6th floor ok to cover 11/18/2003 2:46:02 PM
|
BLD-Framing/Rough-in | 11/17/2003 | 11/17/2003 | 11/17/2003 | P | PART |
Dave Hannah
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 11/10/2003 | 11/14/2003 | 11/14/2003 | P | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 11/10/2003 | 11/13/2003 | 11/13/2003 | P | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore out of time 11/13/2003 4:42:09 PM
|
BLD-Framing/Rough-in | 11/10/2003 | 11/12/2003 | 11/12/2003 | P | PART |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore 5th floor sheetrock shear first layer ok 11/12/2003 4:05:30 PM
|
BLD-Framing/Rough-in | 11/3/2003 | 11/7/2003 | 11/7/2003 | P | PART |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie sheetrock shear fail 5th floor also areas inside med cabint fail needs fire proofing 11/7/2003 2:38:33 PM
|
BLD-Framing/Rough-in | 11/3/2003 | 11/6/2003 | 11/6/2003 | P | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 11/3/2003 | 11/5/2003 | 11/5/2003 | P | PART |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 6th floor 11/5/2003 2:16:20 PM
|
BLD-Framing/Rough-in | 11/3/2003 | 11/4/2003 | 11/4/2003 | P | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 11/3/2003 | 11/3/2003 | 11/3/2003 | P | PART |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie sixth floor 11/3/2003 2:35:39 PM
|
BLD-Framing/Rough-in | 10/28/2003 | 10/31/2003 | 10/31/2003 | P | CANC |
Dave Hannah
|
|
|
###-#### Pete
|
BLD-Framing/Rough-in | 10/28/2003 | 10/30/2003 | 10/30/2003 | P | CANC |
Dave Hannah
|
|
|
###-#### Pete
|
BLD-Framing/Rough-in | 10/28/2003 | 10/29/2003 | 10/29/2003 | P | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 10/28/2003 | 10/28/2003 | 10/28/2003 | P | DONE |
Dave Hannah
|
|
|
pete ###-####
|
BLD-Framing/Rough-in | 10/17/2003 | 10/23/2003 | 10/23/2003 | P | PART |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore 5th floor 10/24/2003 8:10:27 AM
|
BLD-Framing/Rough-in | 10/17/2003 | 10/22/2003 | 10/22/2003 | P | CANC |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 10/17/2003 | 10/21/2003 | 10/21/2003 | P | PART |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore see petes notes 10/21/2003 4:26:18 PM
|
BLD-Framing/Rough-in | 10/17/2003 | 10/20/2003 | 10/20/2003 | P | NR |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 10/14/2003 | 10/17/2003 | 10/17/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/14/2003 at 1:37:09 PM. see petes log 10/20/2003 8:32:36 AM
|
BLD-Framing/Rough-in | 10/14/2003 | 10/16/2003 | 10/16/2003 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/14/2003 at 1:36:26 PM.
|
BLD-Framing/Rough-in | 10/14/2003 | 10/15/2003 | 10/15/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/14/2003 at 1:35:46 PM.
|
BLD-Framing/Rough-in | 10/9/2003 | 10/15/2003 | 10/15/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time 10/15/2003 12:38:58 PM
|
BLD-Framing/Rough-in | 10/9/2003 | 10/14/2003 | 10/14/2003 | A | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 10/9/2003 | 10/13/2003 | 10/13/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 10/13/2003 | 10/13/2003 | 10/13/2003 | P | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 10/9/2003 | 10/10/2003 | 10/10/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time 10/10/2003 1:58:37 PM
|
BLD-Framing/Rough-in | 10/2/2003 | 10/9/2003 | 10/9/2003 | A | PART |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore4th floor 10/9/2003 10:24:34 AM
|
BLD-Framing/Rough-in | 10/2/2003 | 10/8/2003 | 10/8/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore out of time 10/8/2003 4:33:22 PM
|
BLD-Framing/Rough-in | 10/7/2003 | 10/7/2003 | 10/7/2003 | P | PART |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/2/2003 | 10/7/2003 | 10/7/2003 | A | CANC |
Dave Hannah
|
|
|
out of time rescheduled for pm 10/7/2003 11:00:18 AM
|
BLD-Framing/Rough-in | 9/29/2003 | 10/1/2003 | 10/1/2003 | P | PART |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 9/25/2003 | 9/30/2003 | 9/30/2003 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/25/2003 at 1:46:38 PM.
|
BLD-Framing/Rough-in | 9/25/2003 | 9/29/2003 | 9/29/2003 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/25/2003 at 1:45:54 PM. out of time 9/30/2003 11:24:17 AM
|
BLD-Framing/Rough-in | 9/25/2003 | 9/26/2003 | 9/26/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/25/2003 at 1:45:13 PM.
|
BLD-Framing/Rough-in | 9/25/2003 | 9/25/2003 | 9/25/2003 | P | DONE |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 9/18/2003 | 9/25/2003 | 9/25/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time 9/25/2003 1:38:59 PM
|
BLD-Framing/Rough-in | 9/18/2003 | 9/24/2003 | 9/24/2003 | A | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/24/2003 | 9/24/2003 | 9/24/2003 | P | PART |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs third floor rooms 9/24/2003 3:36:43 PM
|
BLD-Framing/Rough-in | 9/18/2003 | 9/23/2003 | 9/23/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/22/2003 | 9/22/2003 | 9/22/2003 | P | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/18/2003 | 9/22/2003 | 9/22/2003 | A | PART |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/18/2003 | 9/19/2003 | 9/19/2003 | P | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/15/2003 | 9/19/2003 | 9/19/2003 | A | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/15/2003 | 9/18/2003 | 9/18/2003 | A | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/18/2003 | 9/18/2003 | 9/18/2003 | P | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/17/2003 | 9/17/2003 | 9/17/2003 | P | CANC |
Dave Hannah
|
|
|
out of time 9/17/2003 4:31:42 PM
|
BLD-Framing/Rough-in | 9/15/2003 | 9/17/2003 | 9/17/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time am rescheduled for pm 9/17/2003 11:27:05 AM
|
BLD-Framing/Rough-in | 9/15/2003 | 9/16/2003 | 9/16/2003 | A | PART |
Dave Hannah
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Marc Lileks floors 2,3&4 north face shear ext ok to cover 9/16/2003 2:50:26 PM
|
BLD-Framing/Rough-in | 9/11/2003 | 9/12/2003 | 9/12/2003 | P | DONE |
Dave Hannah
|
|
|
DENNIS; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
BLD-Framing/Rough-in | 9/10/2003 | 9/11/2003 | 9/11/2003 | P | DONE |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 9/9/2003 | 9/10/2003 | 9/10/2003 | P | DONE |
Dave Hannah
|
|
|
DENNIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/8/2003 | 9/9/2003 | 9/9/2003 | A | CANC |
Dave Hannah
|
|
|
DENNIS; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
BLD-Framing/Rough-in | 9/5/2003 | 9/8/2003 | 9/8/2003 | P | PART |
Dave Hannah
|
|
|
dennis ; Phone #: ###-#### Internet Inspection Request from: Annette Moore 5th and 6th floor floor nailing 9/9/2003 8:02:14 AM
|
BLD-Framing/Rough-in | 9/5/2003 | 9/5/2003 | 9/5/2003 | P | DONE |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/29/2003 | 9/5/2003 | 9/5/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 8/29/2003 | 9/4/2003 | 9/4/2003 | A | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 8/29/2003 | 9/3/2003 | 9/3/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 9/2/2003 | 9/2/2003 | 9/2/2003 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 9/2/2003 | 9/2/2003 | 9/2/2003 | P | PART |
Dave Hannah
|
|
|
4th floor shear walls ok to cover 9/2/2003 3:39:20 PM
|
BLD-Framing/Rough-in | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore out of time 9/2/2003 11:33:07 AM
|
BLD-Framing/Rough-in | 8/27/2003 | 8/29/2003 | 8/29/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 8/29/2003 | 8/29/2003 | 8/29/2003 | P | PART |
Dave Hannah
|
|
|
4th floor rooms 8/29/2003 7:12:28 PM
|
BLD-Framing/Rough-in | 8/29/2003 | 8/29/2003 | 8/29/2003 | P | PART |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/27/2003 | 8/28/2003 | 8/28/2003 | A | PART |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok third floor shear ok to cover 8/28/2003 12:29:32 PM
|
BLD-Framing/Rough-in | 8/22/2003 | 8/27/2003 | 8/27/2003 | A | PART |
Dave Hannah
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs level 2 shear walls ok to cover second sides 8/27/2003 11:12:10 AM
|
BLD-Framing/Rough-in | 8/22/2003 | 8/26/2003 | 8/26/2003 | A | DONE |
Dave Hannah
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 8/22/2003 | 8/25/2003 | 8/25/2003 | A | PART |
Dave Hannah
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs walked rooms on second floor ok to cover some shear walls pete has list 8/25/2003 11:53:09 AM
|
BLD-Framing/Rough-in | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | DONE |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/19/2003 | 8/22/2003 | 8/22/2003 | A | CANC |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 8/19/2003 | 8/21/2003 | 8/21/2003 | A | PART |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | NR |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore walk thru w/ Dave Hanna 8/20/2003 12:52:30 PM
|
BLD-Conference | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | DONE |
Dave Hannah
|
|
|
walk project with carl
|
BLD-Framing/Rough-in | 8/19/2003 | 8/19/2003 | 8/19/2003 | P | PART |
Carl Dependahl
|
|
|
2nd fl corridor...lid ok to cover, except at "chases" open to framing above 8/19/2003 5:28:36 PM
|
BLD-Framing/Rough-in | 8/14/2003 | 8/19/2003 | 8/19/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 12:43:30 PM. ...ok to cover 2nd fl corridor...shear wall & gyp. lid 8/19/2003 4:40:41 PM
|
BLD-Framing/Rough-in | 8/14/2003 | 8/18/2003 | 8/18/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 12:42:50 PM.
|
BLD-Framing/Rough-in | 8/14/2003 | 8/15/2003 | 8/15/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 12:42:13 PM. ...awaiting detail for firestops at chases & voids. 8/18/2003 12:02:43 PM
|
BLD-Framing/Rough-in | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | PART |
Carl Dependahl
|
|
|
2nd fl corridor lids ok to begin cover, need all sprinkler r/i's 8/15/2003 7:00:25 AM
|
BLD-Framing/Rough-in | 8/11/2003 | 8/14/2003 | 8/14/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 2:00:09 PM. ...gypcrete, wip 4th fl. 8/14/2003 6:17:47 PM
|
BLD-Framing/Rough-in | 8/11/2003 | 8/13/2003 | 8/14/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 1:59:29 PM. ....gypcrete in progress....WIP. 8/14/2003 4:04:10 PM
|
BLD-Conference | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PASS |
Carl Dependahl
|
|
|
need firestop assys for chases & pipes/wires, etc. 8/13/2003 5:19:15 PM
|
BLD-Framing/Rough-in | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PART |
Carl Dependahl
|
|
|
4th fl ok for gypcrete 8/13/2003 5:19:40 PM
|
BLD-Framing/Rough-in | 8/12/2003 | 8/12/2003 | 8/12/2003 | P | PART |
Carl Dependahl
|
|
|
ok to install vapor barrier & sheathing, east & north walls, 2nd floor. 8/12/2003 9:51:56 PM
|
BLD-Framing/Rough-in | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 1:58:51 PM. ...ok to sheath inside of ext wall at west & south, 2nd fl. 8/12/2003 9:50:48 PM
|
BLD-Framing/Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 | P | PART |
Carl Dependahl
|
|
|
2nd, 8/8/2003 4:51:15 PM
|
BLD-Framing/Rough-in | 8/6/2003 | 8/8/2003 | 8/8/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 2:54:05 PM. ...HD rods ok at all of 2nd floor ( "stud packs" per plan), 3rd floor nailing appears ok, blocked diaphragm installed...eng's ok for plbg blockouts at that area pending; ok for gypcrete at 3rd fl. 8/11/2003 8:04:02 AM
|
BLD-Conference | 8/6/2003 | 8/7/2003 | 8/7/2003 | P | PASS |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 8/7/2003 | 8/7/2003 | 8/7/2003 | P | PART |
Carl Dependahl
|
|
|
verifying hd's...wip 8/7/2003 5:05:53 PM
|
BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 2:53:22 PM.
|
BLD-Framing/Rough-in | 8/6/2003 | 8/6/2003 | 8/6/2003 | P | PART |
Carl Dependahl
|
|
|
ext nailing, east , west side ok, 8/7/2003 11:59:03 AM
|
BLD-Framing/Rough-in | 8/4/2003 | 8/6/2003 | 8/6/2003 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 9:43:49 AM.
|
BLD-Framing/Rough-in | 8/5/2003 | 8/5/2003 | 8/5/2003 | P | PART |
Carl Dependahl
|
|
|
ext wall 2nd fl ok to insulate at south side...draft stop rods, fix shearwalls 8/5/2003 5:10:28 PM
|
BLD-Framing/Rough-in | 8/4/2003 | 8/5/2003 | 8/5/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 9:43:01 AM. ...ok to insul ext wall, west side 2nd fl...complete draft stops of rod penetrations 8/5/2003 5:03:20 PM
|
BLD-Framing/Rough-in | 8/4/2003 | 8/4/2003 | 8/4/2003 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 9:42:16 AM. ...make corrections per c/n & eng's recommendation 8/4/2003 4:43:23 PM
|
BLD-Framing/Rough-in | 7/30/2003 | 8/1/2003 | 8/1/2003 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 9:22:20 AM.
|
BLD-Framing/Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 9:21:28 AM. ...keep cn, wip 8/1/2003 9:21:08 AM
|
BLD-Framing/Rough-in | 7/28/2003 | 7/30/2003 | 7/30/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 8:50:00 AM. ...rec'd detail for resilient channel...ok at 24" oc, wall or lid w/ 5/8" x gypsum...1layer for 1hr. 7/30/2003 5:46:58 PM
|
BLD-Framing/Rough-in | 7/29/2003 | 7/29/2003 | 7/29/2003 | P | PART |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 8:49:12 AM.
|
BLD-Conference | 7/25/2003 | 7/28/2003 | 7/28/2003 | A | PART |
Carl Dependahl
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows carl out of time fri. rolled this over for monday. 301..ok, awaiting eng's call for shear walls, !HR CONST IS REQ'D 7/28/2003 11:34:43 AM
|
BLD-Framing/Rough-in | 7/28/2003 | 7/28/2003 | 7/28/2003 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 8:48:23 AM. ...reviewed proposal for p-traps: fill under tub w/ gyp-crete & firestop ABS pipe penetration at floor line from bottom per listing & T-7-C UBC. 7/29/2003 1:47:08 PM
|
BLD-Framing/Rough-in | 7/28/2003 | 7/28/2003 | 7/28/2003 | P | CANC |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/21/2003 | 7/25/2003 | 7/25/2003 | A | CANC |
Jim Storey
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows out of time 301 rolled over to monday. 7/25/2003 2:45:59 PM
|
BLD-Framing/Rough-in | 7/21/2003 | 7/24/2003 | 7/24/2003 | A | NR |
Carl Dependahl
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows...NEED ENG'S "FIX" for shear walls cut. 7/28/2003 11:35:34 AM
|
BLD-Framing/Rough-in | 7/21/2003 | 7/23/2003 | 7/23/2003 | A | NR |
Carl Dependahl
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellowsneed resolve shear walls, gyp behind tubs. 7/23/2003 10:50:42 PM
|
BLD-Framing/Rough-in | 7/21/2003 | 7/22/2003 | 7/22/2003 | A | PART |
Carl Dependahl
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows...keep c/ns...need fix shear walls cut for plbg; met e/ arch & owner rep, discussed fire assys req'd at p-traps, voids, etc... 7/22/2003 3:20:13 PM
|
BLD-Framing/Rough-in | 7/21/2003 | 7/21/2003 | 7/21/2003 | P | PART |
Carl Dependahl
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows...walls ...wip, ok. 7/22/2003 9:20:22 AM
|
BLD-Framing/Rough-in | 7/16/2003 | 7/18/2003 | 7/18/2003 | P | CANC |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 | P | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip, 4hr wall...ok. 7/18/2003 4:39:47 PM
|
BLD-Framing/Rough-in | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip, complete eng's fixes for shear walls, told plbr to add straps & stud shoes as needed. 7/16/2003 4:55:15 PM
|
BLD-Conference | 7/10/2003 | 7/10/2003 | 7/10/2003 | P | PASS |
Carl Dependahl
|
|
|
w/ bldr...need resolve generator issues 7/10/2003 6:53:14 PM
|
BLD-Framing/Rough-in | 7/3/2003 | 7/10/2003 | 7/10/2003 | A | FAIL |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...c/n re generator at retail level, make prior corrections 7/10/2003 6:36:21 PM
|
BLD-Framing/Rough-in | 7/9/2003 | 7/9/2003 | 7/9/2003 | P | NR |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 7/3/2003 | 7/9/2003 | 7/9/2003 | A | CANC |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 7/3/2003 | 7/8/2003 | 7/8/2003 | A | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...met eng'r & arch onsite...awaiting details for shear wall perforations 7/8/2003 12:16:05 PM
|
BLD-Framing/Rough-in | 7/3/2003 | 7/7/2003 | 7/7/2003 | A | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 6/27/2003 | 7/2/2003 | 7/2/2003 | A | CANC |
Carl Dependahl
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 6/27/2003 | 7/1/2003 | 7/1/2003 | A | FAIL |
Carl Dependahl
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs...need to complete bolting, firestops, 1hr assys at concealed spaces; eng'r to advise re shear wall penetrations. 7/1/2003 5:30:30 PM
|
BLD-Framing/Rough-in | 6/27/2003 | 6/30/2003 | 6/30/2003 | A | PART |
Carl Dependahl
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs....wip, need eng's fixes completed at studs/sills/ plates notched, etc. 6/30/2003 1:05:07 PM
|
BLD-Framing/Rough-in | 6/23/2003 | 6/27/2003 | 6/27/2003 | A | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...4hr wall wip. 6/27/2003 6:36:26 PM
|
BLD-Framing/Rough-in | 6/23/2003 | 6/26/2003 | 6/26/2003 | A | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...walk thru w/ arch...resolve plbg issues (holes notches, etc.) need eng's detail re shearwall penetrations. 6/26/2003 5:32:26 PM
|
BLD-Framing/Rough-in | 6/23/2003 | 6/25/2003 | 6/25/2003 | A | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore conf. only w/ arch 6/25/2003 10:49:20 AM
|
BLD-Framing/Rough-in | 6/23/2003 | 6/24/2003 | 6/24/2003 | A | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...need clarify r.c. furring spacing & elev shaft beam & floor line details... 6/24/2003 12:04:48 PM
|
BLD-Framing/Rough-in | 6/23/2003 | 6/23/2003 | 6/23/2003 | P | CANC |
Jim Storey
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 6/16/2003 | 6/20/2003 | 6/20/2003 | P | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...4hr wall, wip...ok 6/20/2003 4:15:08 PM
|
BLD-Framing/Rough-in | 6/18/2003 | 6/19/2003 | 6/19/2003 | A | PART |
Carl Dependahl
|
|
|
Bob, ISI...wip 4hr wall 6/19/2003 11:14:05 AM
|
BLD-Framing/Rough-in | 6/16/2003 | 6/19/2003 | 6/19/2003 | P | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...walk thru...c/n issued: firestops, straps, etc....make all eng's corrections 6/19/2003 3:50:46 PM
|
BLD-Framing/Rough-in | 6/16/2003 | 6/18/2003 | 6/18/2003 | P | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4hr wall, wip, keep c/n 6/19/2003 11:19:04 AM
|
BLD-Framing/Rough-in | 6/16/2003 | 6/17/2003 | 6/17/2003 | P | PART |
Carl Dependahl
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; 4hr wall wip. continue wall thru 4th level at corridor. 6/17/2003 3:26:44 PM
|
BLD-Framing/Rough-in | 6/16/2003 | 6/16/2003 | 6/16/2003 | P | DONE |
Dave Hannah
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 6/4/2003 | 6/6/2003 | 6/6/2003 | A | DONE |
Dave Hannah
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 6/4/2003 | 6/5/2003 | 6/5/2003 | A | CANC |
Carl Dependahl
|
|
|
Randy
|
BLD-Framing/Rough-in | 6/5/2003 | 6/5/2003 | 6/5/2003 | P | PART |
Carl Dependahl
|
|
|
4hr wall wip ok...add therma fiber batts per detail...GA file wp2964, show photo at 4th fl. 6/5/2003 4:20:54 PM
|
BLD-Framing/Rough-in | 6/4/2003 | 6/5/2003 | 6/5/2003 | A | PART |
Carl Dependahl
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 6/4/2003 | 6/4/2003 | 6/4/2003 | P | PART |
Carl Dependahl
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs...need shaft wall resubmittal clarification, 4hr wall ok to continue per GA WP2649 6/5/2003 5:01:23 PM
|
BLD-Framing/Rough-in | 5/30/2003 | 6/2/2003 | 6/2/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; walk through w/ eng'r & arch....need details for shear membrane penetrations...replace bolts at steel post/beam connection to A490; still need shaft alternate detail. 6/2/2003 1:16:56 PM
|
BLD-Framing/Rough-in | 5/27/2003 | 5/30/2003 | 5/30/2003 | A | NR |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 5/30/2003 | 5/30/2003 | 5/30/2003 | P | PART |
Carl Dependahl
|
|
|
4hr wall wip; keep c/n re shaft resubmittal, etc. 6/2/2003 9:28:04 AM
|
BLD-Framing/Rough-in | 5/27/2003 | 5/29/2003 | 5/29/2003 | A | NR |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...conf only w/ JP Caspers; eng'r to make site visit asap. 5/30/2003 7:26:19 AM
|
BLD-Framing/Rough-in | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip, 4hr wall ok 5/28/2003 12:19:56 PM
|
BLD-Framing/Rough-in | 5/23/2003 | 5/27/2003 | 5/27/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 5/23/2003 at 1:16:30 PM. Contact: ###-####....4hr walls, wip; need shaft alt. detail 5/27/2003 12:12:48 PM
|
BLD-Framing/Rough-in | 5/27/2003 | 5/27/2003 | 5/27/2003 | A | CANC |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 5/27/2003 | 5/27/2003 | 5/27/2003 | P | PART |
Carl Dependahl
|
|
|
4hr wall, wip....ok 5/27/2003 5:12:33 PM
|
BLD-Framing/Rough-in | 5/19/2003 | 5/23/2003 | 5/23/2003 | A | CANC |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, 5/27/2003 5:11:57 PM
|
BLD-Framing/Rough-in | 5/19/2003 | 5/22/2003 | 5/22/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4hr wall, wip ok. 5/22/2003 12:18:47 PM to 3rd level 5/22/2003 12:19:00 PM
|
BLD-Framing/Rough-in | 5/19/2003 | 5/22/2003 | 5/22/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4hr wall, wip ok. 5/22/2003 12:18:47 PM to 3rd level 5/22/2003 12:19:00 PM
|
BLD-Framing/Rough-in | 5/19/2003 | 5/22/2003 | 5/22/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4hr wall, wip ok. 5/22/2003 12:18:47 PM to 3rd level 5/22/2003 12:19:00 PM
|
BLD-Framing/Rough-in | 5/19/2003 | 5/21/2003 | 5/21/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...east portion firewall thru 3rd fl...wip ok 5/21/2003 4:22:56 PM
|
BLD-Framing/Rough-in | 5/20/2003 | 5/20/2003 | 5/20/2003 | P | PART |
Carl Dependahl
|
|
|
Randy, prelim only... wip 5/20/2003 5:01:14 PM
|
BLD-Framing/Rough-in | 5/19/2003 | 5/20/2003 | 5/20/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip prelim only. C/n issued re shear wall openings. 5/20/2003 1:12:40 PM
|
BLD-Framing/Rough-in | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 1:31:56 PM. Contact: ###-####....4hr wall extension thru 2nd level corridor, WIp, ok. 5/20/2003 10:35:17 AM
|
BLD-Framing/Rough-in | 5/14/2003 | 5/16/2003 | 5/16/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...shaft wip, need alt detail for shafts...may be 1hr per T-6-A 5/16/2003 2:12:00 PM
|
BLD-Framing/Rough-in | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | CANC |
Carl Dependahl
|
|
|
Randy
|
BLD-Framing/Rough-in | 5/16/2003 | 5/16/2003 | 5/16/2003 | P | PART |
Carl Dependahl
|
|
|
shafts...need struct sheathing at shear walls 1st...wip 5/16/2003 3:58:57 PM
|
BLD-Framing/Rough-in | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...shaft wall, need shear panel installed 1st at ext walls...thru level 4. 5/16/2003 1:27:37 PM
|
BLD-Framing/Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 5/13/2003 at 1:39:39 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | PART |
Carl Dependahl
|
|
|
need eng's review of SW penetrations...pipes, cols...WIP 5/14/2003 6:07:41 PM
|
BLD-Framing/Rough-in | 5/5/2003 | 5/9/2003 | 5/9/2003 | A | CANC |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 5/9/2003 | 5/9/2003 | 5/9/2003 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 5/5/2003 | 5/8/2003 | 5/8/2003 | A | CANC |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 5/5/2003 | 5/7/2003 | 5/7/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...4hr walls, extend to/thru corridor 5/7/2003 4:07:49 PM
|
BLD-Framing/Rough-in | 5/5/2003 | 5/6/2003 | 5/6/2003 | A | PART |
Carl Dependahl
|
|
|
4hr wall, 2nd layer 5/6/2003 3:49:29 PM
|
BLD-Framing/Rough-in | 5/5/2003 | 5/5/2003 | 5/5/2003 | A | CANC |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 5/2/2003 | 5/2/2003 | 5/2/2003 | P | PART |
Carl Dependahl
|
|
|
prelim only, wip 5/5/2003 1:55:37 PM
|
BLD-Framing/Rough-in | 4/29/2003 | 5/2/2003 | 5/2/2003 | A | PART |
Carl Dependahl
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs prelim only; wip.
5/2/2003 4:19:52 PM
|
BLD-Framing/Rough-in | 4/29/2003 | 5/1/2003 | 5/1/2003 | A | PART |
Carl Dependahl
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs 4hr wall wip...need eng'r of records ok in writing for this framing 5/1/2003 2:55:18 PM
|
BLD-Framing/Rough-in | 4/29/2003 | 4/30/2003 | 4/30/2003 | A | PART |
Carl Dependahl
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs...framing 2nd level 4hr walls, wip ok 4/30/2003 5:44:29 PM
|
BLD-Framing/Rough-in | 4/30/2003 | 4/30/2003 | 4/30/2003 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 4/29/2003 | 4/29/2003 | 4/29/2003 | P | PART |
Carl Dependahl
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs..prelim only advised plbr, elec, framer, etc re 1hr firestop req's...need assy for firestops at chases 4/29/2003 5:29:32 PM
|
BLD-Framing/Rough-in | 4/21/2003 | 4/25/2003 | 4/25/2003 | A | DONE |
Dave Hannah
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 4/21/2003 | 4/24/2003 | 4/24/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore 4hr wall, wip ok 4/24/2003 11:58:20 AM
|
BLD-Framing/Rough-in | 4/21/2003 | 4/23/2003 | 4/23/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore re 4hr wall, ok to use alternate 4hr GA manual system, framing ok if ok per eng'r of record. ok to continue at own risk..mineral wool (stud bay) installed at 3rd level east walls as per detail. 4/23/2003 5:03:57 PM
|
BLD-Framing/Rough-in | 4/21/2003 | 4/22/2003 | 4/22/2003 | A | NR |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | PART |
Carl Dependahl
|
|
|
gyp, wip 4/22/2003 6:17:43 PM
|
BLD-Framing/Rough-in | 4/18/2003 | 4/21/2003 | 4/21/2003 | P | PART |
Carl Dependahl
|
|
|
rec'd revised engg'd framing for 4hr wall from ISI eng'r...req's stamp and arch's ok...WIP as eng'd 4/21/2003 11:04:56 AM
|
BLD-Framing/Rough-in | 4/21/2003 | 4/21/2003 | 4/21/2003 | P | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore...4hr walls, wip; need 4/21/2003 4:26:35 PM
|
BLD-Conference | 4/17/2003 | 4/18/2003 | 4/18/2003 | P | PASS |
Carl Dependahl
|
|
|
awaiting arch's ok for eng'd 4hr wall... 4/18/2003 4:29:11 PM
|
BLD-Framing/Rough-in | 4/15/2003 | 4/15/2003 | 4/15/2003 | A | CANC |
Carl Dependahl
|
|
|
recall, can't access jobsite,pouring concrete. 4/15/2003 1:14:06 PM
|
BLD-Conference | 4/14/2003 | 4/14/2003 | 4/14/2003 | A | PART |
Carl Dependahl
|
|
|
4hr wall... clarify framing detail ...keep c/n. 4/14/2003 11:42:24 AM
|
BLD-Conference | 3/25/2003 | 3/25/2003 | 3/25/2003 | P | PASS |
Carl Dependahl
|
|
|
met arch onsite 3/25/2003 5:42:41 PM
|
Override - Parcel Holds | | | 2/19/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/19/2003 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 2/19/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/19/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/19/2003 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 2/26/2002 | | 2/18/2003 | | PASS |
Mike Phillips
|
|
|
2/18/2003 16:29:12 M_P - activity updated through activity BLDA022 from case BLD02-00370.
|
Routing - PLAN CHECK | 2/13/2003 | | 2/18/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/18/2003 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 2/18/2003 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/18/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/18/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/13/2003 | | DONE |
|
|
|
Received two copies of resubmittal sheets A1.2, A2.1, A2.2, A2.3, A3.25, A4.2, A4.4, A4.5, A4.6, A4.7, A4.14, A6.80, M1.1. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 2/11/2003 | | 2/12/2003 | | DONE |
|
|
|
|
Routing - PLUMBING | 2/12/2003 | | 2/12/2003 | | PASS |
|
|
|
see bld02-00369
|
Plan resubmittals received | | | 2/11/2003 | | DONE |
|
|
|
Received two sets of resubmittal sheets P1.0, P1.1, P1.2, P1.4, P2.1, P4.1, with Letter and Hot Water Calculations and Transmittal. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 2/10/2003 | | 2/10/2003 | | FAIL |
|
|
|
Need PW Dewater Agreement per Brian Murphy.
|
Routing - FIRE | 2/6/2003 | | 2/10/2003 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 2/10/2003 | | 2/10/2003 | | |
|
|
|
|
Routing - PLUMBING | 1/27/2003 | | 1/29/2003 | | FAIL |
|
|
|
see bld02-00369 for comments
|
Routing - PLAN CHECK | 1/21/2003 | | 1/27/2003 | | FAIL |
|
|
|
Plans are being routed while construction design is conformed. Re: wood in exterior walls which is not fire retarded lumber and wood in 4 hour area separation walls.
|
Routing - PLUMBING | 1/15/2003 | | 1/21/2003 | | FAIL |
|
|
|
overflow drains will not be allowed to drain into courtyard, provide a plan showing all piping in the lower parking level, provide a plan showing laundry room piping, provide a plan showing upper floor perking level floor drainage and interceptor detail and location, piping to area drain shown on page C-5.10, trash enclosure?, provide page P4.1, provide a plan showing piping to drains for fire water blowdown shown on page M5.02, provide page M5.02, provide water sizing calculation for pipe sizes 1/2" thru 4", provide courtyard and planter drain detail and piping.
|
Routing - PUBLIC WORKS | 1/3/2003 | | 1/15/2003 | | FAIL |
|
|
|
Need PW de-water agreement
|
Routing Off Site - STRUCTURAL | 12/26/2002 | | 1/3/2003 | | PASS |
|
|
|
Contacted PDQ to take revised plans of 12.24.02 to outside eng. kmm
No further review required by outside engineering firm.
|
Routing - PLANNING | 12/31/2002 | | 1/3/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/4/2002 | | 12/31/2002 | | |
|
|
|
|
Plan resubmittals received | | | 12/24/2002 | | DONE |
|
|
|
Received three copies of revised T-1, GEN-2, GEN-3, A-0.01, AP-1.1, A-1.0, A-1.01, A-1.02, A-1.1, A-1.2, A-1.3, A-1.4, A-1.5, A-1.6, A-1.7, A-1.8, A-1.9, A-1.10, A-1.11, A-2.1, A-2.2, A-2.3, A-3.1, A-3.11, A-3.12A-3.13, A-3.14, A-3.21, A-3.22, A-3.23, A-3.24, A-3.25, A-3.26,, A-3.27, A-3.30, A-4.1, A-4.2, A-4.3, A-4.4, A-4.5, A-4.6, A-4.7, A-4.11, A-4.12, A-4.13, A-4.14, A-4.15, A-4.16, A-4.20, A-4.42, A-5.01, A-5.01a, A-5.02, A-5.03, A-6.10, A-6.11, A-6.12, A-6.13, A-6.14, A-6.15, A-6.16, A-6.40, A-6.50, A-6.60, A-6.70, A-6.71, A-6.72, A-6.73, A-6.;80, A-6.81, A-6.86, A-6.87, S0.01, S0.02, S0.03, S2.01, S2.11, S2.12, S2.21, S2.22, S2.23, S2.24, S2.31, S2.41, S3.01, S3.11, S3.21, S3.31, S3.32, S4.01, S4.02, P0.0, P0.1, P1.1, P1.2, P1.3, P1.4, P2.1, P3.1, M0.0, M0.1, M1.1, M2.1, M2.6, M3.1, M3.2, M4.0. E.0, E1.0A, E1.0FB, E1.0, E2.1F, E2.1L, E2.1P, E2.2F, E2.2L, E2.2P, E2.2S, E2.3F, E2.3L, E2.3P, E2.3S, E2.4F, E2.4L, E2.4P, E2.4S, E2.5F, E2.5L, E2.5P, E2.5S, E2.6F, E2.6L, E2.6P, E2.6S, E2.7F, E2.7P, E2.8T, E2.8PA, E2.8PB, E2.8PC, E2.8PD, E2.8PE, E3.0, E4.0, E4.1, E4.2. One copy of cover letter and three copies of struct. calcs. Routed one copy to outside eng. and two to Mike Phillips
|
Routing - PUBLIC WORKS | 11/1/2002 | | 11/4/2002 | | FAIL |
|
|
|
Need PW Dewater agreement. Requires Drainage Plan.
|
Routing - PLAN CHECK | 3/25/2002 | | 11/1/2002 | | |
|
|
|
|
Routing - FIRE | 3/22/2002 | 3/25/2002 | 3/25/2002 | | FAIL |
Bill Alexander
|
|
|
LACK AREA SEPARATIONS: M1.02, M2.01, M2.02, M2.03, M2.04, M2.05 and M4.01 have ducts/venting penetrating area separation walls without smoke/fire damper protection. The required smoke/fire dampers (recorded and addressed - UBC review) shall be included in the conceptual fire alarm drawings E-4.00, E-4.01, E-4.02, E-4.03, E-4.04, E-4.05 and E-4.06. Also required is location of horizontal exits and the verification of it's areas separation requirements.
LACKHORIZONTAL EXITS: No information provided verifying horizontal exit requirements. This also affects requirements for installation of standpipe system outlets per UFC 1004.3.
LACK MEANS OF EGRESS IDENTIFICATION: No information provided for means of egress identification.
LACK MEANS OF EGRESS ILLUMINATION: No information provided for means of egress illumination.
|
Plan Review Completed(1st rev) | | | 3/25/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/14/2002 | | 3/22/2002 | | FAIL |
|
|
|
PLan review completed sent correction report to architect. Additional information required for further review.
|
Routing Off Site - STRUCTURAL | 2/26/2002 | | 3/18/2002 | | FAIL |
|
|
|
contacted PDQ to take plans to outside eng. kmm
Review completed, second review required by outside engineering firm.
|
Routing - PLUMBING | 3/11/2002 | | 3/14/2002 | | FAIL |
|
|
|
overflow drains will not be allowed to drain to courtyard, provide a plan showing all piping in the lower parking area, provide a plan showing laundry room piping, provide a plan showing upper parking level floor drainage and interceptor detail and location, piping to area drain shown on page C-5.10, provide a plan showing piping to drains for fire water blowdown shown on page M5.02, provide water sizing calculations for pipe sizes 4" thru 1/2", provide courtyard and planter drain detail and piping.
|
Routing - PLANNING | 3/7/2002 | | 3/11/2002 | | FAIL |
|
|
|
Approved by DAA on 3/7/02. Design Review pending per TKW.
|
Routing - PLANNING | 3/6/2002 | | 3/7/2002 | | PEND |
|
|
|
Approved as per CUP01-00120. Pending Design Review approval.
|
Routing - PUBLIC WORKS | 3/6/2002 | | 3/6/2002 | | FAIL |
|
|
|
Requires drainage plan. Need PW dewater agreement.
|
Routing - PLANNING Land Div | 2/26/2002 | | 2/27/2002 | | PASS |
|
|
|
Land division ok - parcel meets >5 acre exception to the Subdivision Ordinance. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 2/26/2002 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/26/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 2/22/2002 | | |
|
|
|
|
Application received | | | 2/22/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 2/22/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/22/2002 | | DONE |
|
|
|
|