PostCard Mailed | | | 10/1/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Final | 12/9/2002 | 12/10/2002 | 12/10/2002 | A | NR |
Tom Arcoraci
|
|
|
call first; Phone #: ###-#### Internet Inspection Request from: Amy Lawson
|
BLD-Final | 10/23/2002 | 10/24/2002 | 10/24/2002 | A | FAIL |
Jim Storey
|
|
|
no access/ need plan for garage/foudation vents missing/ grading of lot drainage to property to the south not controled to the street. 10/24/2002 9:42:39 AM
|
BLD-Final | 10/22/2002 | 10/23/2002 | 10/23/2002 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung out of time 10/23/2002 5:02:19 PM
|
BLD-Framing/Rough-in | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | DONE |
Dave Hannah
|
|
|
###-####
|
BLD-Energy code compliance | 5/9/2002 | 5/9/2002 | 5/9/2002 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 5/9/2002 10:21:42 AM
|
BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 | P | PASS |
Tom Arcoraci
|
|
|
TRAVIS ###-####
|
BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 | P | PASS |
Jim Storey
|
|
|
###-#### TRAVIS SHEER NAIL c/n made ok ok to side 4/29/2002 8:30:20 AM
|
BLD-Framing/Rough-in | 4/25/2002 | 4/26/2002 | 4/26/2002 | A | FAIL |
Russ Owen
|
|
|
SHEER WALL TRAVIS ###-#### garage needs hds nailed up and stapled, house needs exterior straps at tall wall as per engineering. house has ok to side sticker. contractor notified of the above. 4/26/2002 12:09:23 PM
|
BLD-Framing/Rough-in | 4/24/2002 | 4/24/2002 | 4/24/2002 | P | PART |
Jim Storey
|
|
|
shear wall travis ###-#### tall wall hardware per engineering 4/24/2002 3:52:56 PM
|
BLD-Foundation | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PART |
Dave Hannah
|
|
|
wes- ###-#### found work in progress 3/28/2002 4:22:08 PM
|
BLD-Footing | 3/26/2002 | 3/27/2002 | 3/27/2002 | A | PASS |
Jim Storey
|
|
|
###-#### WES
|
BLD-Footing | 3/20/2002 | 3/20/2002 | 3/20/2002 | P | NR |
Carl Dependahl
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 3/20/2002 | | |
|
|
|
|
Plan assigned to (DJO) | 3/19/2002 | 3/19/2002 | 3/19/2002 | | PASS |
Dan Overy
|
|
|
3/19/2002 13:59:02 DJO - activity updated through activity BLDA022 from case BLD02-00561.
|
Case Summary (BLD) | | | 3/19/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/19/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/19/2002 | | DONE |
|
|
|
###-####
|
Plans ACCEPTED BY PLAN CHECK | | | 3/19/2002 | | |
|
|
|
|
Routing - PLANNING | 3/15/2002 | | 3/18/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/18/2002 | | 3/18/2002 | | PASS |
|
|
|
|
Application received | | | 3/15/2002 | | |
|
|
|
|
Pending Assignment by DJO | 3/15/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 3/18/2002 | | | | |
|
|
|
|