Permit Information
Permit NumberBLD02-01217
StatusExpired
Name BOISE RESCUE MISSION
Site Address 1415 W JEFFERSON ST
Project NameBoise Rescur Mission Offices
Customer Number 
ePlanReviewNo
Description
To remodel, change occupancy group from an tri-plex to offices and bring building to meet current codes. To remodel the structure and change occupancy group to offices. NOTE: The basement is being used for mechanical equipment and building services, the storage areas can not exceed 300 square feet. All construction per the approved plans and attached comment list. MJP DRH02-00028 PC#322-02
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection2/27/20042/27/20042/27/2004 DONE
DetailsDave Hannah
DOC - Permit Expired2/27/20042/27/20042/27/2004APASS
DetailsDave Hannah
Expired by inspector at 2/27/2004 9:12:53 AM
BLD-Final11/13/200311/14/200311/14/2003PPASS
DetailsDave Hannah
don--re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm occ 11/14/2003 3:56:39 PM
BLD-Final10/10/200310/13/200310/13/2003AFAIL
DetailsDave Hannah
c/n on site 10/13/2003 10:02:13 AM
BLD-Final10/8/200310/10/200310/10/2003ACANC
DetailsDave Hannah
don; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIRE-Final Inspection10/6/200310/7/200310/7/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/6/2003 at 11:38:10 AM. Contact: ###-####.
FIRE-Final Inspection10/2/200310/2/200310/2/2003PFAIL
DetailsRick Jackson
don ; Phone #: ###-#### Internet Inspection Request from: Annette Moore need fire extinguisher per instructions on correction notice 10/2/2003 3:25:59 PM
BLD-Final9/11/20039/12/20039/12/2003AFAIL
DetailsDave Hannah
don; Phone #: ###-#### Internet Inspection Request from: Marc Lileks needs fire life safty and zoning finals 9/12/2003 10:35:41 AM
BLD-Energy code compliance7/1/20037/2/20037/2/2003APART
DetailsCarl Dependahl
reinsp, Don...still need rated ext windows per plan 7/2/2003 4:11:36 PM
BLD-Energy code compliance7/1/20037/1/20037/1/2003PNR
DetailsCarl Dependahl
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in6/27/20036/30/20036/30/2003APASS
DetailsTony Young
reinspection before covering w/ insulation, early a.m.
BLD-Framing/Rough-in6/27/20036/27/20036/27/2003PPART
DetailsTony Young
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok to insulate, more misc. fire blocking to do,, shims, point loads, bearing point blocking, direct bearing at single plates, strapping, etc. 6/27/2003 2:07:58 PM
BLD-Framing/Rough-in6/25/20036/26/20036/26/2003APART
DetailsDave Hannah
don; Phone #: ###-#### Internet Inspection Request from: Darla Downs crew has got engineering on beams and haeders for back section and installed are in process of changing post they still have alot of fire blocking to do crew will finish fire blocking install seal package and recall told crew to check all point loads and make sure they go all the way to foundation 6/26/2003 10:03:11 AM
BLD-Conference6/18/20036/18/20036/18/2003PNH
DetailsDave Hannah
Don Stine
BLD-Framing/Rough-in6/16/20036/16/20036/16/2003PFAIL
DetailsCarl Dependahl
don; Phone #: ###-#### Internet Inspection Request from: Annette Moore...c/n, beams, hdrs, upper floor walls brg??







6/16/2003 3:57:13 PM
BLD-Aging Inspection1/30/20031/30/20031/30/2003 PASS
DetailsCarl Dependahl
spoke w/ director, work not ready for insp...will advise. 1/30/2003 8:51:34 AM
Issue PAID IN FULL permit  10/30/2002 DONE
Telephone call  10/29/2002 DONE
CALLED 10-29-02///DLD
Telephone call  10/16/2002 DONE
do intend on doing this project
Routing - PLAN CHECK8/1/2002 8/5/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/5/2002 DONE
Print Pending Permit.LaserJet4  8/5/2002 DONE
Case Summary (BLD)  8/5/2002 DONE
Inspection Record Card- Bld  8/5/2002 DONE
Print Occupancy Form  8/5/2002 DONE
Telephone call  8/5/2002 DONE
permit ready and fees due
Plan assigned to (M_P)5/17/2002 8/5/2002 PASS
DetailsMike Phillips
8/5/2002 13:17:39 M_P - activity updated through activity BLDA022 from case BLD02-01217.
Plan resubmittals received  8/2/2002 DONE
received three sets of resubmittal sheets "1OF2", "2OF2", "S". Routed to Mike Phillips.
Routing - PUBLIC WORKS7/25/2002 8/1/2002 PASS
Case Summary (BLD)  7/25/2002  
Routing - PLAN CHECK7/22/2002 7/25/2002 FAIL
Sent second correction report to architect requiring additional informaiton since occupancy's have been changed.
Routing - PLANNING7/18/2002 7/19/2002 PASS
Approved.
Routing - PLAN CHECK7/16/2002 7/18/2002  
Routing to Planning.
Plan resubmittals received  7/18/2002 DONE
Received three copies of revised sheet S. Routed to Mike P. kmm
Routing - PLANNING7/9/2002 7/15/2002 FAIL
Parking off of alley does not meet setback requirements. Applicant needs to verify that there is surplus parking at the existing facility across Jefferson in order to share with subject office building.
Routing - PLAN CHECK6/10/2002 7/9/2002  
Routing to Planning for additional review since the residential unit has been removed.
Plan resubmittals received  7/1/2002 DONE
Received three sets of resubmittal sheets "1 of 2", "2 of 2", "M-1", Comment Letter with responsed and Warranty information on Furnace. routed to Mike Phillips.
Routing - FIRE6/6/2002 6/11/2002 PASS
approved without written comment
Plan Review Completed(1st rev)  6/10/2002 PASS
Routing - PLAN CHECK5/23/2002 6/6/2002 FAIL
Plan review completed and sent correction report to architect. Additional information requiired for further review prior to issuing permit.
Print Pending Permit.LaserJet4  6/6/2002  
Case Summary (BLD)  6/6/2002  
Routing - PLANNING5/20/2002 5/23/2002 PASS
Approved per DRH02-28.
Routing - PUBLIC WORKS5/17/2002 5/20/2002 PASS
Plans ACCEPTED BY PLAN TECH  5/17/2002 DONE
Plan routing begun/TENANTS  5/17/2002 DONE
Application received  5/17/2002  
Recd Pcfee & Taken To Pln CK  5/17/2002 DONE
Fee Review-notes5/17/20025/17/2002