Case Summary (BLD) | | | 10/30/2006 | | DONE |
|
|
|
|
Agreement of Future work | 9/17/2002 | | 3/17/2003 | | DONE |
|
|
|
|
BLD-Final | 9/17/2002 | 9/18/2002 | 9/18/2002 | A | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 9/18/2002 11:12:38 AM
|
FIRE-Final Inspection | 9/18/2002 | 9/18/2002 | 9/18/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled. New fire alarm panel to be installed with in 6 months per agreement with the boise fire dept. 9/19/2002 11:16:30 AM
|
DOC - Permit Finaled | 9/18/2002 | 9/18/2002 | 9/18/2002 | A | PASS |
Jim Sly
|
|
|
Finaled by inspector at 9/18/2002 11:12:45 AM
|
FIRE-Final Inspection | 9/6/2002 | 9/9/2002 | 9/9/2002 | A | FAIL |
Troy Cobbley
|
|
|
repair the fire alarm panel and provide the required smoke detector, pull station and notification with approved drawings 9/9/2002 1:42:32 PM
|
BLD-Final | 9/6/2002 | 9/9/2002 | 9/9/2002 | P | CANC |
Dave Hannah
|
|
|
neil; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | FAIL |
Troy Cobbley
|
|
|
replace painted sprinkler head in restroom 9/6/2002 11:09:48 AM
|
BLD-Framing/Rough-in | 8/21/2002 | 8/21/2002 | 8/21/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 08:31:45. Contact: ###-####.ok to cover after elec and plumb r/i sign off 8/21/2002 7:08:20 PM
|
Telephone call | | | 8/8/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Issue PAID IN FULL permit | | | 8/8/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/7/2002 | | DONE |
|
|
|
|
Plan Review Completed(1st rev) | | | 8/6/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/6/2002 | | 8/6/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2002 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 7/12/2002 | | 8/6/2002 | | PASS |
Carl Westfall
|
|
|
8/6/2002 15:10:14 CJW - activity updated through activity BLDA022 from case BLD02-01671.
|
Routing - FIRE | 8/1/2002 | | 8/6/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/15/2002 | | 8/1/2002 | | PASS |
|
|
|
The UBC plan review was started July 18, 2002 and was finished Aug. 1, 2002. The plan review was delayed pending resubmittal by the architect. After the resubmittal review, the drawings were approved with conditions. See the conditions list.
|
Plan resubmittals received | | | 7/25/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A-1 with comment letter. Routed to Carl Westfall.
|
Telephone call | | | 7/18/2002 | | DONE |
|
|
|
(7-18-02) Called the architect's representative, Kyle Freutel, and told him that the restroom needed to be upgraded to be accessible to the disabled and that an exterior door is required. Told him that the project was on hold until the additional drawings were received. (8-1-02) The new door was NOT required because the child care area is NOT a daycare.
|
Routing - PUBLIC WORKS | 7/12/2002 | | 7/15/2002 | | PASS |
|
|
|
|
First Notice | 7/9/2002 | 7/9/2002 | 7/9/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2002 | | DONE |
|
|
|
|
Application received | | | 7/9/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/9/2002 | | DONE |
|
|
|
|