Permit Information
Permit NumberBLD02-02459
StatusFinaled
Name WASHINGTON GROUP INTERNATIONAL
Site Address 701 E MORRISON KNUDSEN DR
Project NameMK PLAZA II-2ND & 3RD FLRS
Customer Number 
ePlanReviewNo
Description
(WASHINGTON GROUP INTERNATIONAL)(MK PLAZA II-2ND & 3RD FLOORS) To remodel a 2,265 sq.ft. portion of the 25,600 sq. ft. 2nd floor office area and throughout 10,800 sq. ft. office space on the 3rd floor, all currently occupied for the same purpose by this tenant, per approved plans on file. This permit scope will also be used to establishe a certificate of occupancy for this tenant on both floors. Work includes selective demolision and construction of new interior non-bearing, non-combustible, 1-hour fire-resistive walls to define new private offices; modification of existing suspended ceiling grid, electrical and mechanical systems to meet tenant needs in compliance with current adopted codes and ordinances. The existing 2-hour floor/ceiling, roof/ceiling, mechanical, elevator & stair enclusure shafts shall be maintained and the existing 1-hour exit corridor / elevator lobby system that surrounds the central core and provides access to both stair enclosures shall be maintained. NOTE: This building is NOT sprinklered. Type II-FR construction must be maintained for the existing building area. A C.O. is required as a condition of this permit for the existing tenant in an existing tenant space. PC#02-656/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes10/7/200210/7/20028/10/2004 DONE
Fee Review-notes8/13/20038/13/20038/13/2003 DONE
BLD-Final7/21/20037/22/20037/22/2003ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/21/2003 at 8:34:21 AM. Contact: ###-####.
First Notice 7/22/20037/22/2003 DONE
Permanent occupancy  7/22/2003 DONE
Perm. Occ. Cert. #9735 issued 7-22-03 to Washington Group International for work on 2nd & 3rd floors.
BLD-Final7/18/20037/21/20037/21/2003APASS
DetailsDave Hannah
###-#### ok for perm occ 7/21/2003 11:49:28 AM
Permanent Occupancy 7/21/20037/21/2003 DONE
Details
BLD-Final7/17/20037/18/20037/18/2003ANH
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/17/2003 at 1:22:52 PM. Contact: ###-####....unable to contact 7/21/2003 1:26:05 PM
FIRE-Final Inspection7/14/20037/15/20037/15/2003PPASS
DetailsRick Jackson
some firestopping needed on second floor electrical room (comm cables) and will be completed for strcutural inspector 7/15/2003 1:32:17 PM
FIRE-Final Inspection7/14/20037/14/20037/14/2003PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 7/14/2003 at 8:57:04 AM. Contact: ###-####. rescheduled for 7/15 7/14/2003 3:24:42 PM
FIRE-Final Inspection7/10/20037/11/20037/11/2003AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 7/10/2003 at 8:27:34 AM. Contact: ###-####. need approved plans with notes to verify scope of work in corridors 7/11/2003 9:34:41 AM
BLD-Final7/8/20037/9/20037/9/2003PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/8/2003 at 3:49:52 PM. Contact: ###-####...need fire 1st 7/9/2003 3:06:22 PM
BLD-Aging Inspection5/20/20035/20/20035/20/2003 DONE
DetailsDave Hannah
work in progress 5/20/2003 3:48:35 PM
BLD-Framing/Rough-in3/18/20033/19/20033/19/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/18/2003 at 2:29:24 PM. Contact: ###-####. ok to cover 2nd and 3rd floors 3/19/2003 2:27:23 PM
BLD-Conference3/14/20033/14/20033/14/2003PDONE
DetailsDave Hannah
meeting at 2 pm, to meet in lobby of plaza 1, 400 park, corner of park and broadway
BLD-Aging Inspection3/10/20033/10/20033/10/2003 PASS
DetailsDave Hannah
work in progress 3/13/2003 11:34:33 AM
Issue PAID IN FULL permit  12/9/2002 DONE
Plan assigned to (DRS)10/11/2002 11/27/2002 PASS
DetailsDan Stuart
11/27/2002 14:33:55 DRS - activity updated through activity BLDA022 from case BLD02-02459.
Routing - FIRE11/26/2002 11/27/2002 PASS
Plan Review Completed(1st rev)  11/27/2002 PASS
Routing - PLAN CHECK11/27/2002 11/27/2002 PASS
Approved as noted and attached plan review comments.
PLANS/APPL TAKEN TO FRONT DESK  11/27/2002 PASS
To permit desk for issue.
Inspection Record Card- Bld  11/27/2002 DONE
Print Occupancy Form  11/27/2002 DONE
Telephone call  11/27/2002 DONE
permit ready and fees due
Routing - PLAN CHECK10/16/2002 11/26/2002 PEND
Approved as noted and attached. The tenant has been in this facility for several years. A record of a C.O. for the tenant is not on file. A certificate of occupancy for this tenant is a condition of this permit. The building was constructed for use as an office facility under the 1973 UBC & remodeled for same under the 1979 UBC. Forwarding plans to fire code analsyst for review. Copy of general coments plan review forwarded to architect, Richard D. Robertson, for his records and reference.
Routing - PUBLIC WORKS10/11/2002 10/16/2002 PASS
Plans ACCEPTED BY PLAN TECH  10/8/2002  
Application received  10/7/2002  
Recd Pcfee & Taken To Pln CK  10/7/2002 DONE