Permit Information
Permit NumberBLD02-02687
StatusFinaled
Name RIVERWALK PARTNERS II LLC
Site Address 1673 W SHORELINE DR
Project NameRiverwalk Center
Customer Number 
ePlanReviewNo
Description
(Riverwalk Center - Shell & Core) To construct a new 20,570 square foot, two story shell and core building and related site improvements. This building is constructed of steel structural frame, some precast concrete and concrete masonry walls, steel joists. The core work includes restrooms, corridors, stairways, elevator and mechanical rooms.This is a shell permit only and no occupancy is approved under this permit. Separate tenant improvement permits are required to finish this building for occupancy. This building is fully fire sprinklered. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/3/2013 DONE
Fee Review-notes11/4/200211/4/20028/10/2004 DONE
Letter of compliance  11/6/2003 DONE
Letter of Compliance # 24323 issued 11-6-03.
BLD-Final11/4/200311/5/200311/5/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/4/2003 at 3:25:30 PM. Contact: ###-####. ok for c.c
11/5/2003 9:41:18 AM
BLD-Final11/3/200311/3/200311/3/2003PNR
DetailsDave Hannah
pat; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Other9/11/20039/12/20039/12/2003ACANC
DetailsDave Hannah
char storm drain inspect; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Final8/15/20038/15/20038/15/2003PNR
DetailsCarl Dependahl
still on bond 8/15/2003 4:16:19 PM
FIRE-Final Inspection7/31/20038/1/20038/1/2003APASS
DetailsRick Jackson
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final7/31/20038/1/20038/1/2003PPART
DetailsCarl Dependahl
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...ok for t/o, need P&Z final, signage, complete ext wall insulation/vapor barrier; rec'd eng's affidavit ok 8/1/2003 5:47:22 PM
BLD-Framing/Rough-in7/31/20037/31/20037/31/2003PPART
DetailsCarl Dependahl
###-####...riser room framing( for 1hr ) 7/31/2003 6:24:16 PM
FIRE-Final Inspection7/28/20037/30/20037/30/2003AFAIL
DetailsRick Jackson
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need alarm map at panel; complete sprinkler (see sprinkler permit); exit signs on second floor; need one hour sprinkler room; knox box needed; 7/30/2003 11:48:16 AM
BLD-Final7/29/20037/30/20037/30/2003PNR
DetailsCarl Dependahl
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in7/15/20037/16/20037/16/2003APART
DetailsCarl Dependahl
###-#### tim ceiling grid...ok to tile corridor. 7/16/2003 10:03:50 AM
BLD-Framing/Rough-in7/15/20037/15/20037/15/2003PNR
DetailsCarl Dependahl
ceiling grid- tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in6/23/20036/23/20036/23/2003PPART
DetailsCarl Dependahl
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...suspended corridor lid ok, lights tented at lobby. 6/23/2003 5:01:40 PM
BLD-Conference6/17/20036/18/20036/18/2003APASS
DetailsCarl Dependahl
still need all appropriate spec insp reports...ok to continue. 6/18/2003 9:09:40 AM
BLD-Framing/Rough-in6/16/20036/17/20036/17/2003APART
DetailsCarl Dependahl
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore...susp lid at corridor ok...seal firestop at bulkheads at lobby for 1hr wall const....s/f damper to be installed at 1 hvac duct at lobby. 6/17/2003 2:01:37 PM
BLD-Framing/Rough-in6/16/20036/16/20036/16/2003PNR
DetailsCarl Dependahl
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in6/3/20036/4/20036/4/2003ANR
DetailsCarl Dependahl
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in6/4/20036/4/20036/4/2003PPART
DetailsCarl Dependahl
add full ht gyp at corridors, chk. at ceiling insp...ok to continue 6/4/2003 3:50:17 PM
BLD-Framing/Rough-in5/28/20035/29/20035/29/2003APART
DetailsTom Arcoraci
###-#### ok to cover walls 5/29/2003 9:52:53 AM
BLD-Framing/Rough-in5/27/20035/28/20035/28/2003AFAIL
DetailsCarl Dependahl
###-####, c/n firestops, add backing studs at corridor...seal "tops" of chases, provide arch's detail for susp. lids & shaft wall 5/28/2003 12:17:35 PM
BLD-Conference5/14/20035/15/20035/15/2003APASS
DetailsCarl Dependahl
kim-- ###-#### ...w/ arch onsite, submit details for approved 1 or 2 hr suspended clg & shaft wall assy along corridor at 2nd fl...1 layer lid ok per GA or ICBO T-&-C, item 6-4.1. 5/15/2003 11:50:31 AM
BLD-Framing/Rough-in5/12/20035/13/20035/13/2003ANR
DetailsCarl Dependahl
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore, need Mti's reports for welding, steel connections, etc. Need arch's detail for tunnel corridors near duct chases...unable to meet details as drawn 5/13/2003 1:38:16 PM
BLD-Framing/Rough-in4/7/20034/8/20034/8/2003PPART
DetailsSteven Webb
kim; Phone #: ###-#### Internet Inspection Request from: Annette Moore Floor deck--ok pending approval from special inspector on all welds, bar, wire mesh, etc. 4/8/2003 3:00:30 PM
BLD-Foundation3/21/20033/21/20033/21/2003PPART
DetailsRuss Owen
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Ok pending special inspection. 3/21/2003 3:55:39 PM
BLD-Framing/Rough-in3/17/20033/18/20033/18/2003APART
DetailsCarl Dependahl
TIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs; NOT FRAME INSP; Met MTI insp. Eric ,Proj. Mgr. Lee Harrison & Tim Sparks onsite,, wip, pending reports for fabbed steel components and assembly, masonry, and concrete 3/18/2003 10:37:27 AM
BLD-Foundation3/14/20033/14/20033/14/2003PPART
DetailsCarl Dependahl
TIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs...pend insp report 3/17/2003 5:32:27 PM
BLD-Framing/Rough-in3/12/20033/13/20033/13/2003APART
DetailsDave Hannah
kim; Phone #: ###-#### Internet Inspection Request from: Annette Moore . CMU walls MTI on site to do spec inspection walked project with inspector 3/13/2003 11:22:52 AM
BLD-Footing2/25/20032/25/20032/25/2003PPART
DetailsJim Sly
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Grade Beams OK pending MTI insp and approval. 2/25/2003 2:21:18 PM
BLD-Footing2/24/20032/24/20032/24/2003PPART
DetailsCarl Dependahl
ft insp tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Pending MTI's report, ok 2/24/2003 5:02:02 PM
BLD-Footing2/20/20032/21/20032/21/2003APASS
DetailsTom Arcoraci
###-#### tim pen 2/21/2003 10:17:14 AM pending mti report 2/21/2003 10:17:51 AM
BLD-Conference2/14/20032/14/20032/14/2003PPASS
DetailsCarl Dependahl
fdn wip...awaiting MTI's report. 2/14/2003 2:47:25 PM
BLD-Footing2/12/20032/13/20032/13/2003APART
DetailsDave Hannah
TIM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie` 2/12/2003 1:20:14 PM crew is is going to pour ftgs on the north and south sides will uae M.T.I. for spec insp pbl works schedu;led for this after noon to go over run off water 2/13/2003 9:21:36 AM
BLD-Other2/4/20032/6/20032/6/2003PNR
DetailsCarl Dependahl
TIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs NEEDS DRAIN INSPECTION... site drainage req's Pub. Wks. 2/6/2003 2:37:30 PM
(F) Reprint permit  12/13/2002  
Routing - PLAN CHECK12/12/2002 12/12/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/12/2002 PASS
Inspection Record Card- Bld  12/12/2002 DONE
Print Occupancy Form  12/12/2002 DONE
Telephone call  12/12/2002 DONE
PERMIT READY AND FEES DUE
Issue PAID IN FULL permit  12/12/2002  
Plan assigned to (JCM)11/4/2002 12/12/2002 PASS
DetailsJohn Menard
12/12/2002 08:20:53 JCM - activity updated through activity BLDA022 from case BLD02-02687.
Routing - PLAN CHECK12/10/2002 12/11/2002 PASS
Plan Reviewer's activity  12/11/2002 PASS
Resubmittals reviewed and approved as submitted. JCM
Routing - FIRE12/11/2002 12/11/2002 PASS
DetailsBill Alexander
Routing - FIRE12/5/2002 12/10/2002 FAIL
Plan resubmittals received  12/9/2002 DONE
Received three sets of resubmittal sheets C1.2, C1.3, and ESC prepared plan narrative. Routed to John Menard.
Plan resubmittals received  12/9/2002 DONE
1. Received three sets of resubmittal sheets. C1.1, C1.4, C1.5.
2. Received three sets of resubmittal sheets C1.0, A2.1, A2.2, A5.1, A7.1, A7.2, with comment letter. Routed to John Menard.
Routing - PLAN CHECK12/3/2002 12/5/2002 FAIL
Plan resubmittals requested  12/5/2002 FAIL
Faxed and mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Routing - PLANNING11/27/2002 12/3/2002 PASS
Approved per DRH02-141.
Routing Off Site - STRUCTURAL11/22/2002 12/3/2002 PASS
called pdq to take resubmittals to outside engineering. dkl Received a fax from the consulting structural engineer approving the structural modification for the foundation design. JCM
Plan resubmittals received  11/27/2002 DONE
Received three sets of resubmittal sheets C1.0, C1.4, L1, with cover letter. Routed to John Menard.
Routed extra drawings for DRH02-00141 to Sarah Schafer.
Routing - PLAN CHECK11/25/2002 11/27/2002  
Routing - PLUMBING11/19/2002 11/25/2002 PASS
Plan resubmittals received  11/21/2002 DONE
Received three sets of resubmittal sheets S0.1, S1.1, S2.1, S4.1, S4.2, and Revised Structural Calculations with cover letter. Routed to John Menard.
Routing - PLANNING11/18/2002 11/19/2002 FAIL
This set of plans talks about the demolition of the entire parking site and what is to be going back in its place but does not show the current renditions. I have called Wes Steele and he has said that when Tom South finishes the landscape plan he will get me some new documents for the Building Permit set.
Routing - Erosion and Sediment11/14/2002 11/18/2002 PASS
ESC previously approved under ESC02-00604 and BLD02-02553
Routing Off Site - STRUCTURAL11/4/2002 11/18/2002 PASS
Contacted PDQ to take to outside eng. kmm Received a fax from the consulting engineer approving the plans as submitted. JCM
Routing - PUBLIC WORKS11/7/2002 11/14/2002 PASS
Routing - PLANNING Land Div11/4/2002 11/7/2002 PASS
Lot 3 of Block 1 of Quinn Subdivision.
Application received  11/4/2002  
Recd Pcfee & Taken To Pln CK  11/4/2002  
Plans ACCEPTED BY PLAN TECH  11/4/2002 DONE
Plan routing begun/NEW & ADDTN  11/4/2002 DONE