Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberBLD02-02881
StatusFinaled
Name QUALITY CREATIONS
Site Address 5264 N 36TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To remove existing synthetic exterior finish and exterior sheathing because of deterioration and delamination due to moisture problems. The residence will then be provided with new structural sheathing for bracing, installed and nailed in accordance with the attached engineering. New windows and doors will also be provided in the existing openings and a new 3-coat exterior stucco system will be installed per UBC and manufacturer's installation instructions. All product information must be provided to the field inspector prior to installation. All brace panel nailing to be inspected prior to covering. New windows and doors to meet Boise City Energy Code. Letter of Completion to be issued when done. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/5/200311/7/200311/7/2003PPASS
DetailsTony Young
JOSH ###-####
DOC - Permit Finaled11/7/200311/7/200311/7/2003PPASS
DetailsTony Young
Finaled by inspector at 11/7/2003 2:27:14 PM
CHANGE STATUS TO (ISS)  11/5/2003 DONE
I PUT THIS PERMIT BACK TO ISSUE MODE FOR A FINAL AS HE RECEIVED A POST CARD///DLD
PostCard Mailed  10/1/2003 SENT
PostCard has been mailed requesting inspection.
BLD-Framing/Rough-in1/6/20031/7/20031/7/2003PPASS
DetailsTony Young
###-####
BLD-Framing/Rough-in12/19/200212/20/200212/20/2002APART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
shear ok near laundry 12/20/2002 11:32:13 AM
BLD-Framing/Rough-in11/29/200212/2/200212/2/2002APART
DetailsSteven Webb
JOSH SHEAR NAIL; Phone #: ###-#### Internet Inspection Request from: Darla Downs Garage area and rear of house--ok to side--Eng. (AHJ--Keith Jones) approving covered areas provided. Additional shear inspection will be needed at later date. 12/2/2002 10:01:50 AM
BLD-Conference11/25/200211/26/200211/26/2002ADONE
DetailsDave Hannah
JOSH; Phone #: ###-#### Internet Inspection Request from: Darla Downs they have a premit and an engineer coming out to the site to look at what they have allready done to sign off shear 11/26/2002 11:07:53 AM
Application received  11/25/2002  
Inspection Record Card- Bld  11/25/2002  
Plan assigned to (JCB)11/25/2002 11/25/2002 PASS
DetailsJason Blais
11/25/2002 14:20:37 JCB - activity updated through activity BLDA022 from case BLD02-02881.
Routing - PLAN CHECK11/25/2002 11/25/2002 PASS
Permit approved.
PLANS/APPL TAKEN TO FRONT DESK  11/25/2002 PASS
Inspection Record Card- Bld  11/25/2002 DONE
Issue PAID IN FULL permit  11/25/2002 DONE