Fee Review-notes | 12/12/2002 | 12/12/2002 | 8/10/2004 | | DONE |
|
|
|
|
First Notice | | 8/25/2003 | 8/25/2003 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 8/25/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9774 issued 8-25-03 to Brighton Corportion.
|
Permanent Occupancy | | 8/22/2003 | 8/22/2003 | | DONE |
|
|
|
|
BLD-Final | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 2:42:12 PM. Contact: ###-####.
|
BLD-Final | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/22/2003 at 8:59:01 AM. Contact: ###-####. OK for Perm Occ. 8/22/2003 3:44:26 PM
|
FIRE-Final Inspection | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety, fire alarm and fire sprinklers finaled
|
FIRE-Final Inspection | 8/20/2003 | 8/21/2003 | 8/21/2003 | A | CANC |
Troy Cobbley
|
|
|
technical problems with the induct detector circuit so the fire alarm system could not be finaled. Life safety is ready to final 8/21/2003 3:41:43 PM
|
BLD-Final | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 8:40:09 AM. Contact: ###-####.
|
BLD-Final | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 8:40:09 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 9:11:03 AM. Contact: ###-####. Remainder of ceiling grid OK. 8/7/2003 11:25:14 AM
|
FIRE-Sprinkler Rough-in | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | PASS |
Troy Cobbley
|
|
|
Don, ###-#### sprinkler piping is ok to cover 7/22/2003 2:55:46 PM
|
BLD-Other | 7/17/2003 | 7/17/2003 | 7/17/2003 | P | PART |
Steven Webb
|
|
|
Suspended ceiling -- Ok except kitchen ceiling--(requires completion) Ok to drop tiles pending required trades. 7/17/2003 3:28:23 PM
|
BLD-Framing/Rough-in | 6/11/2003 | 6/12/2003 | 6/12/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 12:44:48 PM. Contact: ###-####. Soffits 6/12/2003 12:42:00 PM
|
FIRE-Conference | 5/30/2003 | 6/2/2003 | 6/2/2003 | A | DONE |
Troy Cobbley
|
|
|
I spoke with the general contractor about the placement of exit signs 6/2/2003 10:25:04 AM
|
BLD-Framing/Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/13/2003 at 4:49:43 PM. Contact: ###-####.
|
Print Occupancy Form | | | 3/24/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/19/2003 | | DONE |
|
|
|
|
Telephone call | | | 3/17/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 1/14/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/30/2002 | | 1/14/2003 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan assigned to (CJW) | 12/16/2002 | | 1/14/2003 | | PASS |
Carl Westfall
|
|
|
1/14/2003 12:44:25 CJW - activity updated through activity BLDA022 from case BLD02-02988.
|
Plan resubmittals received | | | 1/10/2003 | | DONE |
|
|
|
Received two copies of revised sheets A2.1, A3.1 and one copy of cover letter. Routed to Carl W. kmm
|
Routing - PLUMBING | 12/27/2002 | | 12/30/2002 | | PASS |
|
|
|
need pan with drain under water heater. Pipe to approved location, along with prv. Check Ice machine for air gap.
|
Plan Review Completed(1st rev) | | | 12/27/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/17/2002 | | 12/27/2002 | | |
|
|
|
UBC plan review started December 26, 2002 and finished the next day. A response from the architect was required. See the conditions list.
|
Routing - FIRE | 12/27/2002 | | 12/27/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/16/2002 | | 12/17/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/13/2002 | | DONE |
|
|
|
1. Review under 2000 IBC.
|
Application received | | | 12/12/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/12/2002 | | DONE |
|
|
|
|