Fee Review-notes | 12/13/2002 | 12/13/2002 | 8/10/2004 | | DONE |
|
|
|
|
Fee Review-notes | 8/13/2003 | 8/13/2003 | 8/13/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
First Notice | | 6/24/2003 | 6/24/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/24/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9705 issued 6-24-03 to Ellan German Veterinary Clinic.
|
BLD-Final | 6/23/2003 | 6/23/2003 | 6/23/2003 | P | PASS |
Russ Owen
|
|
|
nick; Phone #: ###-#### Internet Inspection Request from: Annette Moore. ok for perm oc , c/n complete architect dedicated the counter to hc access with sign.6/23/2003 3:27:21 PM 6/23/2003 3:34:48 PM
|
BLD-Final | 6/11/2003 | 6/12/2003 | 6/12/2003 | A | FAIL |
Russ Owen
|
|
|
left over from yesterday. see notes from then.6/11/2003 5:52:12 PM 6/11/2003 5:52:28 PM Still needs fire life safety and prior c/n break room counter plugs need to move out for 24 in reach range. and need let another c/n.6/12/2003 10:40:44 AM 6/12/2003 10:53:52 AM
|
FIRE-Final Inspection | 6/12/2003 | 6/12/2003 | 6/12/2003 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
FIRE-Final Inspection | 6/10/2003 | 6/11/2003 | 6/11/2003 | A | FAIL |
Troy Cobbley
|
|
|
DAN; Phone #: ###-#### Knox box has been installed but there is still no map for the facp and I need nfpa 72 record of completions 6/11/2003 1:06:52 PM
|
BLD-Final | 6/10/2003 | 6/11/2003 | 6/11/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 6/10/2003 at 12:09:07 PM. Contact: ###-####.Unable to do called to office by suppervisor. 6/11/2003 5:52:52 PM
|
BLD-Final | 5/5/2003 | 5/6/2003 | 5/6/2003 | P | PART |
Russ Owen
|
|
|
DAN; Phone #: ###-#### Internet Inspection Request from: Darla Downsc/n posted for ele out lets reach ranges and accessible check out . OK temp if zoning would approve posted c/n. 5/6/2003 2:44:30 PM
|
Code Occupancy Approval | 5/6/2003 | 5/6/2003 | 5/6/2003 | P | PASS |
Scott M.Brown
|
|
|
NO PLANNING REQUIREMENTS FINAL SIGNED OFF. 5/6/2003 1:33:24 PM
|
Temporary occupancy | | | 5/6/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4950 issued 5-6-03 to the Ellan German Veterinary Clinic.
|
BLD-Final | 5/2/2003 | 5/5/2003 | 5/5/2003 | P | FAIL |
Russ Owen
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Not ready but did go over some req with builder. nothing writen. 5/5/2003 5:49:22 PM
|
FIRE-Final Inspection | 5/5/2003 | 5/5/2003 | 5/5/2003 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the fire alarm plans are approved and the system tested with Dave Millers permission.
|
FIRE-Final Inspection | 5/1/2003 | 5/2/2003 | 5/2/2003 | A | FAIL |
Rick Jackson
|
|
|
###-#### talked to Troy about this and they are only to be approved a temp occ if and only if they get fire alarm plans in for review; as of today they haven't turned in any plans 5/2/2003 3:48:37 PM
|
BLD-Final | 5/1/2003 | 5/2/2003 | 5/2/2003 | P | NR |
Russ Owen
|
|
|
###-####Needs mec and fire prior to final . 5/2/2003 3:05:20 PM
|
BLD-Framing/Rough-in | 4/22/2003 | 4/23/2003 | 4/23/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 2:55:00 PM. Contact: ###-####.Ceilng ok except I put a c/n next to approved plans, for round light fixtures to have a support wire. also called contractor. 4/23/2003 11:10:38 AM
|
BLD-Framing/Rough-in | 4/1/2003 | 4/2/2003 | 4/2/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 7:33:40 AM. Contact: ###-####.Walls ok some plumbing needs re-inspection at rear area will be exposed as in other tennant space, call for ceiling grid talked with contractor on site. 4/2/2003 10:51:28 AM
|
BLD-Framing/Rough-in | 3/21/2003 | 3/24/2003 | 3/24/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/21/2003 at 7:17:33 AM. Contact: ###-####.Partial inspection only some walls not framed yet also left a c/n for break room area will not worl as shown. 3/25/2003 12:33:40 PM
|
Issue PAID IN FULL permit | | | 3/4/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/21/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/21/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/21/2003 | | DONE |
|
|
|
permit ready and fees due
|
Routing - PLAN CHECK | 2/7/2003 | | 2/20/2003 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
Plan assigned to (JCB) | 1/17/2003 | | 2/20/2003 | | PASS |
Jason Blais
|
|
|
2/20/2003 14:37:53 JCB - activity updated through activity BLDA022 from case BLD02-02994.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/19/2003 | | DONE |
|
|
|
Received two sets of resubmittal sheets A1.0, A2, E1, P1, M-1, (3) Structural calculations, and (1) completed Architect/Engineer of Record Declaration Form. Routed to Jason Blais.
|
Routing - FIRE | 2/6/2003 | | 2/7/2003 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 2/6/2003 | | |
|
|
|
Plan resubmittals and written response required for further review.
|
Routing - PLAN CHECK | 1/30/2003 | | 2/6/2003 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
|
Routing - PLANNING | 1/24/2003 | | 1/30/2003 | | PASS |
|
|
|
Mark Pecchenino, approved per CUP02-00151.
|
Routing - PLUMBING | 1/30/2003 | | 1/30/2003 | | PASS |
|
|
|
an rp device will be required on the service line to this tenant. provide a drain to recieve full discharge, the treatment faucets will require a pvb on the hose if provided or an approved retractable device. the water heater will require a floor drain or elevate with a pan and drain to the hub drain.
|
Routing - PUBLIC WORKS | 1/17/2003 | | 1/24/2003 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 12/18/2002 | | HOLD |
|
|
|
Plans on hold with Marlene until CUP is applied for and approved.
|
Plans ACCEPTED BY PLAN TECH | | | 12/13/2002 | | DONE |
|
|
|
|
Application received | | | 12/13/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/13/2002 | | DONE |
|
|
|
|