Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/10/2004 | 4/26/2005 | | DONE |
|
|
|
|
Voucher Form | | | 9/2/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/14/2004 | | |
|
|
|
|
(F) Reprint permit | | | 7/13/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/10/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10127 issued 5-10-04 to Hot Yoga.
|
BLD-Final | 5/3/2004 | 5/3/2004 | 5/3/2004 | P | PASS |
Dave Hannah
|
|
|
Barney; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok for perm occ 5/3/2004 2:52:18 PM
|
Permanent Occupancy | | 5/3/2004 | 5/3/2004 | | DONE |
|
|
|
|
BLD-Final | 2/24/2004 | 2/25/2004 | 2/25/2004 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/24/2004 at 11:31:14 AM. needs plumbing final 2/25/2004 3:10:12 PM
|
BLD-Final | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | NR |
Dave Hannah
|
|
|
Barney; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Final | 12/1/2003 | 12/2/2003 | 12/2/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/1/2003 at 10:54:20 AM. Contact: ###-####. ok for temp occ needs to finish rest rooms 12/2/2003 10:17:02 AM
|
FIRE-Final Inspection | 12/1/2003 | 12/1/2003 | 12/1/2003 | P | PASS |
Rick Jackson
|
|
|
barney; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie will have rear deadbolt removed for strcutural inspector 12/1/2003 1:07:48 PM
|
BLD-Framing/Rough-in | 10/28/2003 | 10/30/2003 | 10/30/2003 | A | DONE |
Dave Hannah
|
|
|
brandt; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 10/28/2003 | 10/29/2003 | 10/29/2003 | P | PASS |
Dave Hannah
|
|
|
Brandt; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to cover after elec r/i 10/29/2003 4:43:22 AM
|
Plan resubmittals received | | | 10/24/2003 | | DONE |
|
|
|
Received one copy of revised calculations and one copy of letter from Pinnacle concerning the footings. Routed to David Hannah. kmm
|
FIRE-Final Inspection | 10/20/2003 | 10/20/2003 | 10/20/2003 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was for a conference. I went over the life safety review notes with the contractor and the owner. 10/20/2003 3:43:11 PM
|
Inspection Record Card- Bld | | | 10/8/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/8/2003 | | |
|
|
|
|
Telephone call | | | 10/8/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Issue PAID IN FULL permit | | | 10/8/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/15/2003 | | 10/7/2003 | | PASS |
|
|
|
(9-26-03) Completed resubmittal review. Called the architect and the engineer and told them what additional information was required. See the plan review report. (10-7-03) Drawings approved with clarifications.
|
Plan assigned to (CJW) | 8/7/2003 | | 10/7/2003 | | PASS |
Carl Westfall
|
|
|
10/7/2003 16:03:49 CJW - activity updated through activity BLDA022 from case BLD03-01855.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/2/2003 | | DONE |
|
|
|
Recieved two copies of revised sheets A1.0, A2.0, one copy of revised letter from Truss Joist and one revised calculations from Pinnacle. Routed to Carl W. kmm
|
Telephone call | | | 10/1/2003 | | DONE |
|
|
|
Called Cory with Cole Associates. Need correlation between architect's and engineers dimensions. Need more information about the wall required by the truss engineer.
|
Plan resubmittals received | | | 9/30/2003 | | DONE |
|
|
|
Received two copies of revised sheets A3.0, A1.0. One copy of letter from Truss Joist and one copy of letter from Pinnacle. Routed to Carl W. kmm
|
Telephone call | | | 9/26/2003 | | DONE |
|
|
|
Called Cory Nelson with "Cole & Associates Architects" and ask for a resubmittal on the showers. See the plan review report for what was needed. Called Steven Cornwell with "Pinnacle Engineers" and asked for more engineering. See the plan review report for what was needed.
|
Plan resubmittals received | | | 9/25/2003 | | DONE |
|
|
|
Received two copies of revised sheets A0.0, A1.0, A2.0, A3.0, A4.0, cover letter letter from Pinnacle. Routed to Carl W. kmm
|
Routing - FIRE | 9/5/2003 | | 9/12/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/12/2003 | | 9/5/2003 | | |
|
|
|
Failed first IBC plan review. IBC plan review started September 3, 2003 and was finished September 5, 2003. A response from the architect was required. See the plan review report. A copy was E-mailed to the architect.
|
Routing - PLANNING | 8/11/2003 | | 8/12/2003 | | PASS |
|
|
|
Approved per Building Permit plans.
|
Routing - PUBLIC WORKS | 8/7/2003 | | 8/11/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/5/2003 | | DONE |
|
|
|
|
Application received | | | 8/1/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2003 | | DONE |
|
|
|
|
Fee Review-notes | 8/1/2003 | 8/1/2003 | | | |
|
|
|
|