Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberBLD03-02337
StatusFinaled
Name ROTH HOMES
Site Address 4669 N ARROW CREST WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2753 sq. ft. two story single family dwelling with a 666 sq. ft. attached three car garage, a 288 sq. ft. concrete entry courtyard and 286 sq. ft. of covered concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space shall be maintained. (1st floor 1990 sq. ft.)(2nd floor 763 sq. ft.) PC #612 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/12/20044/13/20044/13/2004PPASS
DetailsTony Young
garage code is 1234; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
DOC - Permit Finaled4/13/20044/13/20044/13/2004PPASS
DetailsTony Young
Finaled by inspector at 4/13/2004 2:50:11 PM
BLD-Final4/9/20044/12/20044/12/2004PFAIL
DetailsTroy James
garage code is 1234; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
c/n posted in kitchen 4/12/2004 2:44:30 PM
BLD-Grading Inspection4/12/20044/12/20044/12/2004 PASS
DetailsRita DeYoung
Final grading and drainage approved
BLD-Framing/Rough-in1/19/20041/20/20041/20/2004PPASS
DetailsTony Young
shear inspection interior sheetrocked walls; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
BLD-Wall cover1/12/20041/13/20041/13/2004APART
DetailsTony Young
first thing if possible would appreciate it; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
will need int. shear later 1/13/2004 10:36:34 AM
BLD-Framing/Rough-in1/12/20041/12/20041/12/2004PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
ok to insulate,,, fire block stair area 1/12/2004 3:15:26 PM
BLD-Framing/Rough-in1/9/20041/9/20041/9/2004PPART
DetailsTony Young
am if possible; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
c/n posted, ok to insulate 1/9/2004 2:49:28 PM
BLD-Framing/Rough-in1/5/20041/6/20041/6/2004PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 1/5/2004 at 9:16:30 AM. Contact: ###-####.
BLD-Other12/10/200312/10/200312/10/2003PPART
DetailsTony Young
EXT. SCHERE INS.; Phone #: ###-#### Internet Inspection Request from: josh strasser
ext. shear ok 12/10/2003 3:52:45 PM
BLD-Foundation10/17/200310/20/200310/20/2003APART
DetailsTony Young
chris; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip, need more bar 10/20/2003 10:54:28 AM
BLD-Foundation10/20/200310/20/200310/20/2003PPART
DetailsTony Young
re-inspection
ok, wip 10/20/2003 1:47:33 PM
BLD-Footing10/16/200310/16/200310/16/2003PPART
DetailsTony Young
chris; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Other10/16/200310/16/200310/16/2003PCANC
DetailsTony Young
Electrical temp pole inspection; Phone #: ###-#### Internet Inspection Request from: josh strasser
BLD-Grading Inspection10/15/200310/15/200310/15/2003 PASS
DetailsRita DeYoung
footing subgrade approved by the geotechnical engineer
Issue PAID IN FULL permit  10/15/2003 DONE
Plan assigned to (DJO)10/14/200310/14/200310/14/2003 PASS
DetailsDan Overy
10/14/2003 15:28:38 DJO - activity updated through activity BLDA022 from case BLD03-02337.
Plan Reviewer's activity  10/14/2003 PEND
have called Roth Homes. Mike Smith to contact me when ever. plans are not consistant between framing sheets, foundation is not to scale, sections are incorrect, generic notes do not apply to hillside plans, schedules do not match engineering and beams not specified.
Case Summary (BLD)  10/14/2003  
Plan Review Report  10/14/2003  
Plan Reviewer's activity  10/14/2003 DONE
Mike Smith contacted me by phone just after lunch. Went thru problem areas and will red-line in order to issue.
PLANS/APPL TAKEN TO FRONT DESK  10/14/2003 DONE
Inspection Record Card- Bld  10/14/2003 DONE
Permit Ready to Issue  10/14/2003  
Telephone call  10/14/2003 DONE
left mess that permit is ready
Plans ACCEPTED BY PLAN CHECK  10/14/2003  
Routing - FIRE10/3/2003 10/8/2003 DONE
No fire sprinklers required (Arrowhead Ridge).
Routing - Erosion and Sediment10/2/2003 10/3/2003 DONE
ESC approved with conditions attached to plans.
Routing - PLANNING10/1/2003 10/2/2003 PASS
Routing - PUBLIC WORKS9/29/2003 9/30/2003 PASS
Routing - PUBLIC WORKS GRADING9/25/2003 9/29/2003 PASS
DetailsRita DeYoung
Approved as category 3 with conditions of approval in letter from Boise Public Works attached to the plans.
Application received  9/25/2003  
Pending Assignment by DJO9/25/2003    
DetailsDan Overy
Routing - PLAN CHECK10/9/2003