Permit Information
Permit NumberBLD03-03048
StatusExpired
Name COMMUNITY CONTRACTING
Site Address 817 W FRANKLIN ST
Project NameDERR BUILDING
Customer Number 
ePlanReviewNo
Description
(DERR BUILDING) (10-11-04) Modified drawings were submitted showing the two mezzanine areas (250 square feet and 150 square feet) connected by a 170 square foot walkway. Instead of each separate mezzanine area being served by its own stairway, the new walkway connects the two areas to a single stairway. Only one stairway will be provided to serve both mezzanine areas. The new mezzanine area will be 570 square feet (increased by 170 square feet). This increases the fire area on the 1st floor to 2,940 square feet. Both mezzanine rooms will be offices. Neither room is approved as a conference room. Neither room is required to be open to the 1st floor because the occupant load is less than 10. The total 1st floor occupant load, including the mezzanine, will be 27. (4-16-04) MODIFIED DRAWINGS WERE SUBMITTED APRIL 15, 2004 CHANGING THE TRANSFER OF STRUCTURAL LOADS. THE MODIFIED DRAWINGS WERE APPROVED APRIL 16, 2006. (2-20-04) This building is NOT fire sprinklered. To construct two mezzanines (a 250 square foot conference area and a 150 square foot office area) on the 1st story of an existing building. This building has a 2,370 square foot 1st floor and a 2,237 square foot basement. The mezzanines will increase the fire area of the 1st floor to 2,770 square feet. Work is to include footings, columns, beams, floor joists, floor sheathing, gypsum board shear walls, and stairways all per the approved drawings and the plan review report on file. A restroom on the 1st floor is being altered to be accessible to the disabled. Also, an exterior concrete ramp is being provided to serve the 1st floor. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD1/13/20061/13/20061/13/2006 DONE
didn't send out any notice as Tony acidentally doc finaled instead of expired///1/13/06 BAS
First Notice12/29/200512/29/20051/13/2006 DONE
DetailsTony Young
DOC - Permit Expired  1/13/2006 DONE
Per Tony this permit should have been expired not finaled
BLD-Aging Inspection12/28/200512/28/200512/29/2005 FAIL
DetailsTony Young
expired
DOC - Permit Finaled12/29/200512/29/200512/29/2005PPASS
DetailsTony Young
expired
BLD-Conference1/28/20051/31/20051/31/2005APART
DetailsTony Young
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice
w/ 425,, owner,,, contractor,,, architect,,, on issues holding up occupancy 1/31/2005 11:58:59 AM
BLD-Conference1/31/20051/31/20051/31/2005ADONE
DetailsDave Hannah
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice,,, w/ 415,, 10am???
FIRE-Final Inspection1/31/20051/31/20051/31/2005PPASS
DetailsRick Jackson
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final1/27/20051/28/20051/28/2005AFAIL
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
c/n posted,,,,DO NOT OCCUPY 1/28/2005 12:42:18 PM
FIRE-Final Inspection1/27/20051/27/20051/27/2005PFAIL
DetailsRick Jackson
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles The duct detectors are installed downstream of filters - need to be installed before filters; all other items have been corrected 1/27/2005 2:47:32 PM
FIRE-Final Inspection1/25/20051/26/20051/26/2005AFAIL
DetailsRick Jackson
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice Duct detectors don't shut down unit - 2 minutes to shut the units down 1/26/2005 4:15:07 PM
BLD-Final1/25/20051/26/20051/26/2005ANR
DetailsTony Young
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice
FIRE-Final Inspection1/20/20051/21/20051/21/2005AFAIL
DetailsRick Jackson
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Nothing has been corrected 1/21/2005 9:45:02 AM
BLD-Final1/20/20051/21/20051/21/2005AFAIL
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
no inspection made,,, need trades 1st 1/21/2005 10:41:19 AM
FIRE-Final Inspection1/20/20051/20/20051/20/2005PFAIL
DetailsRick Jackson
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice Extinguishers need annual and at 48 inches; sign above main exit; exit hardware; duct detectors for AHU shutdown 1/20/2005 3:22:58 PM
BLD-Final1/20/20051/20/20051/20/2005PCANC
DetailsTony Young
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice
need trades 1st,,, no insp. ,,, called # and left messege 1/20/2005 2:59:15 PM
BLD-Conference12/13/200412/14/200412/14/2004APART
DetailsDave Hannah
Markl sanders Ext 3 call first; Phone #: ###-#### Internet Inspection Request from: Jan Rice hand rails and gaurd rails 12/14/2004 10:55:02 AM
BLD-Conference12/10/200412/10/200412/10/2004PNR
DetailsDave Hannah
Mark Sanders; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in10/29/200410/29/200410/29/2004PPASS
DetailsDave Hannah
Jim; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner ok to start covering walls 11/1/2004 7:58:19 AM
CHANGE STATUS TO (ISS)  10/29/2004 DONE
Already paid
Receive PAYMENT IN FULL PRINT  10/19/2004 DONE
Inspection Record Card- Bld  10/13/2004 DONE
Print Occupancy Form  10/13/2004 DONE
Permit Ready to Issue  10/13/2004 DONE
Telephone call  10/13/2004 DONE
called mark sanders at ###-#### that permit is ready
BLD-Energy code compliance10/10/200410/11/200410/11/2004APART
DetailsDave Hannah
jim;phone####-#### ceiling ok to cover 10/11/2004 9:35:08 AM
Routing - PLAN CHECK10/4/2004 10/11/2004 PASS
Another plan modification was submitted on September 30, 2004. The modified drawings were approved.
PLANS/APPL TAKEN TO FRONT DESK  10/11/2004 DONE
BLD-Energy code compliance10/5/200410/6/200410/6/2004ACANC
DetailsTony Young
###-#### jim
Plan assigned to (CJW)10/4/200410/4/200410/4/2004 DONE
Plan Mod.
Plan Modification Accepted  10/4/2004 DONE
Plan modification acceped for BLD03-03048 for deleting one stairway to front mezzanine, conferance room mezzanine revise office space, add ext. deck to rear mezzanine. Minor revisions to existing interior walls on sheets A2.0, A2.1,A4.0,A8.0,S1.0, S1.1 takne to Carl W.
BLD-Framing/Rough-in10/1/200410/1/200410/1/2004PPART
DetailsDave Hannah
###-#### - jim ok to start insulating roof/ceiling 10/1/2004 2:36:46 PM
CHANGE STATUS TO (REV)  9/30/2004 DONE
BLD-Aging Inspection8/2/20048/2/20048/2/2004 NR
DetailsTony Young
BLD-Footing5/24/20045/25/20045/25/2004APART
DetailsTroy James
jim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Ok to place concrete in footings. Still need to have the plans resubmitted to city for the revised and relocation of new footings. 5/25/2004 9:34:25 AM
(F) Reprint permit  4/19/2004 DONE
CHANGE STATUS TO (ISS)  4/19/2004 DONE
changed status to issued-resubmittal
Routing - PLAN CHECK4/15/2004 4/16/2004 PASS
(4-15-04) PLAN MODIFICATION received and forwarded to Carl Westfall. (4-16-04) Modified drawings approved.
Plan assigned to (CJW)4/15/2004 4/16/2004 PASS
DetailsCarl Westfall
4/16/2004 13:11:40 CJW - activity updated through activity BLDA022 from case BLD03-03048.
PLANS/APPL TAKEN TO FRONT DESK  4/16/2004 DONE
Plan modification approved.
Print Occupancy Form  4/16/2004 DONE
Permit Ready to Issue  4/16/2004 DONE
Telephone call  4/16/2004 DONE
permit ready and fee due
(F) Reprint permit  4/16/2004 DONE
BLD-Conference4/14/20044/15/20044/15/2004APART
DetailsDave Hannah
needs to resubmit plans 4/15/2004 11:54:51 AM
Plan Modification Accepted  4/15/2004 DONE
PLAN MODIFICATION received and forwarded to Carl Westfall for review. Received 2 copies of sheets A2.0, A2.1, A4.0, A8.0, S1.0 and structural calculations. $500.00 plan modification fee waived by Marlene Southard. Rereview of submittals will be charged at an hourly rate.
BLD-Conference4/14/20044/14/20044/14/2004PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/14/2004 at 10:55:48 AM. Contact: ###-####.
Issue PAID IN FULL permit  3/2/2004 DONE
Inspection Record Card- Bld  3/1/2004 DONE
Print Occupancy Form  3/1/2004 DONE
Permit Ready to Issue  3/1/2004 DONE
Print Occupancy Form  3/1/2004 DONE
Telephone call  3/1/2004 DONE
left mess that permit is ready
Plan assigned to (CJW)12/30/2003 2/27/2004 PASS
DetailsCarl Westfall
2/27/2004 14:29:35 CJW - activity updated through activity BLDA022 from case BLD03-03048.
Routing - PLAN CHECK2/26/2004 2/27/2004 DONE
Sent back to Fire for a resubmittal review.
Routing - FIRE2/27/2004 2/27/2004 PASS
resubmittal acceptable.
Routing - PLAN CHECK2/27/2004 2/27/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/27/2004 DONE
Routing - Erosion and Sediment2/26/2004 2/26/2004 PASS
ESC approved with attached conditions.
Plan resubmittals received  2/26/2004 DONE
Received two copies of revised sheets A2.0 and one copy of response letter. Routed to Carl W. kmm
Routing - FIRE2/20/2004 2/24/2004  
Failed second IFC plan review. resubmittal does not comply with review requirements.
2/26/04-Fire Marshall re-confirmed requirement to provide code required openings. Faxed revised review to architect.
Routing - PLAN CHECK1/22/2004 2/20/2004 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  2/18/2004 DONE
Received two copies of ESC Plan, and narrative. ESC application and ESC requirements. Two copies of revised sheets A0.0, A1.0, A2.0, A2.1, A4.0, A6.0, A8.0, S1.0, E1.0. Four copies of S2.0. Two copies of supplemental Strucutal calcs. One copy of Structural for the mezzanines. One copy of response letter. One copy of response letter to Sam R. One copy of response letter from Treasure Valley Engineers. One copy of brief outline of the calcs. that were performed to establish the allowable skylight area. One copy of testing data on skylight. One copy on Crystalite 5842 Frame and one of C-1 sheet. Routed to Carl W. kmm
Routing - FIRE1/20/2004 1/21/2004  
Failed first IFC plan review. Nonsprinklered basement over 1500 sq ft; review faxed to architect
Routing - PLAN CHECK1/8/2004 1/20/2004  
Failed first IBC plan review. IBC plan review started January 15, 2004 and finished January 20, 2004. A response from the architect was required. See the plan review report. A copy was E-mailed to the architect.
Routing - PLANNING1/2/2004 1/7/2004 PASS
Approved.
Routing - Erosion and Sediment12/31/2003 1/2/2004  
Failed first review. ESC plan waiver denied. Informed PD.
Routing - PUBLIC WORKS12/30/2003 12/30/2003 PASS
Plans ACCEPTED BY PLAN TECH  12/26/2003  
No energy compliance and no ESC permit or plans or at least a plan waiver letter for the side walk and ramp. Contacted Mark Sanders. (2-17-04) Items received.
Application received  12/23/2003  
Recd Pcfee & Taken To Pln CK  12/23/2003  
Fee Review-notes12/23/200312/23/2003