Case Summary (BLD) | | | 7/2/2013 | | DONE |
|
|
|
|
Third Notice BLD | 6/14/2006 | 6/14/2006 | 2/21/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 5/25/2006 | 5/25/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 4/24/2006 | 4/24/2006 | 5/25/2006 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/24/2006 | 4/24/2006 | 4/24/2006 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 10/19/2005 | 10/20/2005 | 10/20/2005 | A | FAIL |
Forrest France
|
|
|
Provide one 2A10BC fire ext. with current inspection tag, provide approved door hardware at exit door as discussed.
|
FIRE-Final Inspection | 10/19/2005 | 10/19/2005 | 10/19/2005 | P | CANC |
Forrest France
|
|
|
No time for inspection, will reschedule for tomorrow.
|
FIRE-Final Inspection | 10/19/2005 | 10/19/2005 | 10/19/2005 | P | CANC |
Forrest France
|
|
|
|
Code Occupancy Approval | 10/17/2005 | 10/17/2005 | 10/17/2005 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met.
|
Case Summary (BLD) | | | 12/6/2004 | | |
|
|
|
|
BLD-Aging Inspection | 10/19/2004 | 10/19/2004 | 10/19/2004 | | PASS |
Dave Hannah
|
|
|
exp on01/05/05 10/25/2004 9:14:00 AM
|
Plan Reviewer's activity | | | 7/28/2004 | | PASS |
|
|
|
I have reviewed and approved the structural calculations and drawing for the attendent booth. These items were required as a deferred submittal as a part of an agreement for an early release of the building permit. The calculations where done using the 1997 UBC; however, I approved it because the building and loads are very small and the wind loads used are equivalent to those in the 2000 IBC. JCM
|
Plan resubmittals received | | | 7/27/2004 | | |
|
|
|
Received a copy of the required structural calculations for the attendant booth that were allowed to be submitted as a deferred submittal. JCM
|
Issue PAID IN FULL permit | | | 7/9/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/18/2004 | | 7/7/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/7/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/7/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/7/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/7/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plan assigned to (JCM) | 6/1/2004 | | 7/7/2004 | | PASS |
John Menard
|
|
|
7/7/2004 10:57:32 JCM - activity updated through activity BLDA022 from case BLD04-01076.
|
Routing - FIRE | 6/15/2004 | | 6/18/2004 | | PASS |
|
|
|
approved subject to plan annotations (door hardware and PFE) and satisfactory field inspection. No written review comments.
|
Plan Review Completed(1st rev) | | | 6/18/2004 | | FAIL |
|
|
|
failed plan check.
|
Routing - PLAN CHECK | 6/8/2004 | | 6/15/2004 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 6/15/2004 | | DONE |
|
|
|
Mailed the architect a letter requesting additional infomation need to review the proposed new structure. JCM
|
Routing - Erosion and Sediment | 6/7/2004 | | 6/8/2004 | | PASS |
|
|
|
ESC waiver approved with conditons attached to plans.
|
Routing - PLANNING | 6/1/2004 | | 6/3/2004 | | PASS |
|
|
|
CVA04-00002 Susan Riggs Pending DR
DRH04-00081 Sarah Schafer
Approved per DRH04-81.
|
Routing - PUBLIC WORKS | 5/20/2004 | | 5/27/2004 | | PASS |
|
|
|
|
Application received | | | 5/19/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/19/2004 | | PASS |
|
|
|
|