Second Notice BLD | 12/27/2006 | 12/27/2006 | 12/28/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 9/19/2006 | 9/19/2006 | 12/27/2006 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/19/2006 at 7:46:52 AM. Contact: ###-####.
|
DOC - Permit Finaled | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | PART |
Dave Hannah
|
|
|
ted; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ after elec gos perm
|
FIRE-Final Inspection | 9/14/2006 | 9/14/2006 | 9/14/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory, inspection passed.
|
BLD-Other | 9/6/2006 | 9/7/2006 | 9/7/2006 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/6/2006 at 12:39:19 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/3/2006 | 4/3/2006 | 4/3/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/3/2006 at 6:59:54 AM. Contact: ###-####.
|
BLD-Other | 3/1/2006 | 3/1/2006 | 3/2/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/1/2006 at 11:17:26 AM. Contact: ###-####. ok to insulate ext walls and int walls
|
BLD-Conference | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/28/2006 at 10:53:01 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/27/2006 | 1/27/2006 | 1/30/2006 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/27/2006 at 9:38:14 AM. Contact: ###-####.needs to fire caulk walls and floor redo wires for sep ceiling grid
|
BLD-Aging Inspection | 10/14/2005 | 10/14/2005 | 10/14/2005 | | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 7/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/25/2005 | | DONE |
|
|
|
left mess that permit is ready dwaine carver at ###-####
|
Permit Ready to Issue | | | 4/19/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/19/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/19/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2005 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 2/24/2005 | | 4/18/2005 | | PASS |
|
|
|
4/18/2005 10:19:42 CJW - activity updated through activity BLDA022 from case BLD05-00364.
|
Routing - FIRE | 4/8/2005 | | 4/14/2005 | | PASS |
|
|
|
Resubmittal acceptable. revised comments faxed to Synergy, who made the resubmittal.
|
Routing - PLAN CHECK | 3/22/2005 | | 4/8/2005 | | PASS |
|
|
|
Approved after resubmittal review.
|
Plan resubmittals received | | | 4/5/2005 | | DONE |
|
|
|
Received Transmittal, 1 Letter for Sam R. & 1 Letter for Carl W. , 1 Copy of sheet E0.0 , 2 Copys of sheets COVER, A2.1,A2.3,A4.1,A5.1,A5.2,A5.4,M2.0,M4.0,M5.0 Taken to Carl W.
|
Routing - FIRE | 3/15/2005 | | 3/22/2005 | | FAIL |
|
|
|
failed. resubmittal necessary for required fire alarm system and smoke alarm design modifications. Review faxed to archtiect.
|
1st review completed | | | 3/22/2005 | | FAIL |
|
|
|
failed plan check and fire.
|
Routing - PLAN CHECK | 2/25/2005 | | 3/15/2005 | | FAIL |
|
|
|
The IBC plan review was started March 14 and was finished the next day. Resubmitted drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 2/24/2005 | | 2/25/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/18/2005 | | DONE |
|
|
|
Lighting comp?
|
Application received | | | 2/16/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/16/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/14/2005 | | | | |
|
|
|
|