Information based on query as of Saturday, September 28, 2024.
Permit Information
Permit NumberBLD05-00672
StatusFinaled
Name WESTERN TRAILERS
Site Address 6710 SUPPLY WAY
Project NameWESTERN TRAILER SHOP
Customer Number 
ePlanReviewNo
Description
Western Trailers - To construct a new 22,300 square foot, one story, pre-engineered Butler steel shop building and related site improvements. Main level 21,300 square feet, mezzanine 1000 square feet. The main level includes a 16,000 square foot shop, a 4,015 square foot machine shop and 1000 square foot office area. The mezzanine will have office space and mechanical room. All construction per the approved plans and attached comment list. JCM 9/13/05 The scope of work under this permit was modified to include the construction of approximately 58 lineal feet of nonbearing interior partitions and the installation of three interior doors to create three private offices and an open office area at the mezzanine level of this building. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  1/30/2006  
Second Notice BLD12/22/200512/22/200512/27/2005 DONE
First Notice has not been responded to.
First Notice 12/6/200512/22/2005 DONE
Permanent occupancy  12/6/2005 DONE
Perm. Occ. Cert. # 10828 issued 12-6-05 to Western Trailers.
FIRE-Final Inspection12/2/200512/5/200512/5/2005APASS
DetailsForrest France
c/n items have been completed, fire life safety passed inspection.
Code Occupancy Approval11/15/200511/15/200511/15/2005ADONE
DetailsDena Gambrel
Occupancy Inspection signed off.
FIRE-Final Inspection11/14/200511/15/200511/15/2005AFAIL
DetailsForrest France
See correction notice dated 11/14 for a listing of defficient items.
FIRE-Final Inspection11/14/200511/14/200511/14/2005PFAIL
DetailsForrest France
Provide three 4A-10BC fire ext. not provided at this time, repair two emergency egress lights, door hardware is incorrect at office to shop area, provide key to knox box, provide fire dept. access signage at entry to supply way, need final on fire sprinklers prior to life safety signature.
FIRE-Final Inspection11/9/200511/10/200511/10/2005ACANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 11/9/2005 at 4:07:12 PM. Contact: ###-####.
FIRE-Final Inspection11/2/200511/3/200511/3/2005ANR
DetailsForrest France
Fire sprinkler permit must be finaled prior to life safety sign-off.
BLD-Final11/2/200511/3/200511/3/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/2/2005 at 3:46:50 PM. Contact: ###-####.final ok pending all other sign offs.
PubWorks Occupancy Approval11/3/200511/3/200511/3/2005 DONE
Drainage project complete, signed permanent occupancy 11/03/05. R.Rokovitz
Permanent Occupancy 11/3/200511/3/2005 DONE
Details
BLD-Other10/26/200510/26/200510/26/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/26/2005 at 9:48:44 AM. Contact: ###-####.ceilling ok
BLD-Framing/Rough-in9/16/20059/19/20059/19/2005APASS
DetailsJim Storey
BLD-Framing/Rough-in9/16/20059/16/20059/16/2005PDEFR
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/16/2005 at 11:03:39 AM. Contact: ###-####.out of time rollrd to monday.
CHANGE STATUS TO (ISS)  9/14/2005 DONE
Plan assigned to (JCM)9/13/2005 9/13/2005 PASS
9/13/2005 14:05:37 JCM - activity updated through activity BLDA022 from case BLD05-00672.
Plan Reviewer's activity  9/13/2005 PASS
Reviewed and approved mezzanine level plan modification with red lined notes. JCM
PLANS/APPL TAKEN TO FRONT DESK  9/13/2005 DONE
Override - Parcel Holds  9/13/2005  
Inspection Record Card- Bld  9/13/2005 DONE
Print Occupancy Form  9/13/2005 DONE
Telephone call  9/13/2005 DONE
called ###-#### and left voicemessage for Melody that permit is ready and fees
Override - Parcel Holds  9/13/2005  
Permit Ready to Issue  9/13/2005  
Plan Modification Accepted  9/12/2005  
Plan modification accepted for BLD05-00672 for the redesign of mezzanine space. Original plan was approved with an open mezzanine with (1) small mechanical room in the corner of space. Appicant wishes to construct non-load bearing walls to create (3) offices in the mezzanine and the remainder of the sapce is to remain open. Received (3) copies of sheet A1.2. Routed to John M.
BLD-Aging Inspection8/12/20058/12/20058/12/2005 PASS
DetailsJim Storey
wip
Plan Reviewer's activity  7/20/2005 DONE
Talked to Gary Eichelberg at Design Resources and indicated that the proposed plan modification looked okay and requested that he submit a plan modification application and two sets of all plan sheets associated with the proposed modification. This conversation was based on a cover letter, dated July 11, 2005, and (2) 8 1/2"x11" plan sheet showing the proposed modification
BLD-Foundation6/3/20056/6/20056/6/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/3/2005 at 10:45:37 AM. Contact: ###-####.
BLD-Footing5/31/20055/31/20055/31/2005PPASS
DetailsMike Jordan
herb; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Extend Permit 180 days5/25/20055/26/20055/27/2005ANR
DetailsJim Storey
BLD-Footing5/24/20055/25/20055/25/2005ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/24/2005 at 11:30:56 AM. Contact: ###-####. rolled
(F) Reprint permit  5/2/2005  
Issue PAID IN FULL permit  4/29/2005 DONE
Routing - FIRE4/26/2005 4/27/2005 PASS
DetailsBill Alexander
Routing - PLAN CHECK4/27/2005 4/27/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/27/2005 DONE
Permit Ready to Issue  4/27/2005  
Inspection Record Card- Bld  4/27/2005  
Print Occupancy Form  4/27/2005 DONE
Plan assigned to (JCM)3/15/2005 4/27/2005 PASS
4/27/2005 13:48:49 JCM - activity updated through activity BLDA022 from case BLD05-00672.
Routing - PLANNING4/25/2005 4/26/2005 PASS
Approved per DRH04-00298. Recorded agreement received 4/18/05 from attorney.
Routing - PLAN CHECK4/22/2005 4/25/2005 PASS
Plan resubmittals received  4/22/2005 DONE
Received Transmittal of Declaration of Access & Parking Easement Taken to John M.
Routing - FIRE4/19/2005 4/22/2005 FAIL
Did not respond to review Note 1A. Called architect to discuss, left message. Faxed review to architect.
Plan resubmittals received  4/20/2005 DONE
Resubmittals received and forwarded to John M.: 2 copies of plan sheets A7.2
Plan resubmittals requested  4/19/2005 DONE
Faxed the architect a letter requesting additional revisions. JCM
Routing - PLAN CHECK4/1/2005 4/19/2005 FAIL
Plan resubmittals received  4/18/2005  
Received (2) copies of revised sheets - Cover; Civil C1.0-C1.6; Architectural A0.1,A0.2,A1.1,A1.2,A2.1,A3.1,7.1,A7.2; Plumbing P1.1.
Plan resubmittals requested  4/5/2005 DONE
Faxed the architect a comment list requesting additional revisions for the construction documents. JCM
Plan resubmittals received  4/4/2005 DONE
Resubmittals received and forwarded to John M.: 1 copy of small docs info from MOJ Engineering (marked "Preliminary Drawing"), and 2 copies of plan sheets cover, A1.2, A2.1, A3.1, A7.1, A7.2 and M1.2.
1st review completed  4/1/2005 FAIL
failed planning, plan check and fire.
Routing - FIRE3/28/2005 4/1/2005 FAIL
lacks FD access, req'd FH's, fire flow and sprinkler flow, haz mat and exiting info; proper fire alarm design. Review faxed to architect.
Routing - PLANNING3/25/2005 3/28/2005 FAIL
DRH04-00298 Sara S.

Waiting for a copy of a recorded access/egress easement for the property. I contacted Ryan with Design Resources (Rocky was not available). I will keep the plans routing so that I don't hold up the review process while the document is being created.
Routing - PLAN CHECK3/28/2005 3/28/2005 FAIL
John M.
Plan resubmittals requested  3/28/2005 DONE
Mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLUMBING3/23/2005 3/25/2005 PASS
Lavies required to meet UPC 414.1
Approved per plan and 2003 UPC
Routing - Erosion and Sediment3/22/2005 3/23/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS3/18/2005 3/22/2005 PASS
Routing - PLANNING Land Div3/17/2005 3/18/2005 PASS
Lot 1, Block 1, Supply Way Park Subdivision
Plans ACCEPTED BY PLAN TECH  3/16/2005  
This Project went Green Tag 3-16-05 Called Ryan 3-16-05 need new Civil Sheets ASAP . Waiting for call back..
Plan routing begun/NEW & ADDTN  3/16/2005  
Recd Pcfee & Taken To Pln CK  3/15/2005 DONE
Application received  3/14/2005