Case Summary (BLD) | | | 1/9/2013 | | DONE |
|
|
|
|
BLD-Final | 2/5/2007 | 2/6/2007 | 2/6/2007 | A | PASS |
Dave Hannah
|
|
|
gary please call 1/2 hr prior /###-#### rick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 2/6/2007 | 2/6/2007 | 2/6/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 1/23/2007 | 1/24/2007 | 1/24/2007 | P | FAIL |
Dave Hannah
|
|
|
GARY; Phone #: ###-#### Internet Inspection Request from: Victoria Beall need temp glass by back door
|
FIRE-Final Inspection | 1/23/2007 | 1/24/2007 | 1/24/2007 | A | PASS |
Forrest France
|
|
|
Inspection for the fire sprinkler permit work passed.
|
BLD-Final | 1/22/2007 | 1/23/2007 | 1/22/2007 | P | CANC |
Dave Hannah
|
|
|
gary - call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Grading Inspection | 1/5/2007 | 1/5/2007 | 1/5/2007 | | BOND |
|
|
|
The rough grading and drainage have been completed at the above mentioned address. However, fine grading and revegetation of the lot to the East has not been completed. For this the engineer has recommended a bond of $1,000.00. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Energy code compliance | 8/9/2006 | 8/14/2006 | 8/14/2006 | A | PASS |
Dave Hannah
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover
|
BLD-Framing/Rough-in | 8/8/2006 | 8/10/2006 | 8/10/2006 | A | PASS |
Dave Hannah
|
|
|
gary ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to insulate
|
BLD-Framing/Rough-in | 8/4/2006 | 8/7/2006 | 8/8/2006 | P | FAIL |
Dave Hannah
|
|
|
gary - call 1hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs to fire block basement and first and second floors also needs to fix trusses see c/n
|
BLD-Foundation | 3/8/2006 | 3/9/2006 | 3/9/2006 | A | PASS |
Tom Arcoraci
|
|
|
eric ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Foundation | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | PASS |
Dave Hannah
|
|
|
foundation wall insp///eric; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa 2ft stem wall back side ok to pour
|
BLD-Foundation | 2/15/2006 | 2/17/2006 | 2/17/2006 | A | PASS |
Dave Hannah
|
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie//Rescheduled for 2-17-06 AM per Eric 2-15-06 eus
|
BLD-Foundation | 2/14/2006 | 2/15/2006 | 2/15/2006 | A | CANC |
Dave Hannah
|
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 2/1/2006 | 2/2/2006 | 2/2/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/1/2006 at 4:18:06 PM. Contact: ###-####.
|
BLD-Footing | 1/18/2006 | 1/19/2006 | 1/19/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/18/2006 at 11:37:01 AM. Contact: ###-####. basement and back of garage ok to pour
|
PubWorks Subgrade Approval | 10/11/2005 | 10/11/2005 | 10/11/2005 | | PASS |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 8/29/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/12/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/12/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/12/2005 | | |
|
|
|
|
Telephone call | | | 8/12/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (SAM) | 6/2/2005 | 7/11/2005 | 8/11/2005 | | PASS |
|
|
|
8/11/2005 15:28:22 SAM - activity updated through activity BLDA022 from case BLD05-01473.
|
Routing - PLAN CHECK | 6/10/2005 | | 8/11/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 8/11/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/12/2005 | | DONE |
|
|
|
Waiting for the ICC web site to be up so I can look up an ES report for SIP's. Plan reivew is on hold till then.
|
Plan Reviewer's activity | | | 7/12/2005 | | DONE |
|
|
|
15:05 I called and talked to Keith, the engineer, about the calculations and the drawings. He will get back to me with answers and SIP's information. Plans are on hold.
|
Routing - PLANNING | 6/8/2005 | | 6/10/2005 | | PASS |
|
|
|
Okay per redlined drawings at the direction of applicant. Driveway cannot exceed 33' in the front setback, eaves cannot encroach further than 2' into any setback, balacony cannot enroach further than 4' into rear setback, and stairs/landing cannot encroach further than 6'. Maximum building height 35' from adjacent, existing grade!
|
Routing - Erosion and Sediment | 6/10/2005 | | 6/10/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 6/10/2005 | | 6/10/2005 | | PASS |
|
|
|
This house requires an automatic fire sprinkler system installed in accordance with NFPA 13D. (Morningside Heights #2 sub.)
|
Routing - PUBLIC WORKS GRADING | 6/3/2005 | | 6/6/2005 | | PASS |
|
|
|
Approved as Category 1 by CFH 05-00018
|
Routing - PUBLIC WORKS | 6/6/2005 | | 6/6/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 6/6/2005 | | 6/6/2005 | | FAIL |
|
|
|
Driveway cannot exceed 33' wide in the front setback. Spoke w/ applicant at noon today. He will be stopping in tomorrow (6/7/05), to redline site plan.
|
Application received | | | 6/2/2005 | | |
|
|
|
|