Information based on query as of Saturday, September 28, 2024.
Permit Information
Permit NumberBLD05-01665
StatusFinaled
Name DAVID ONEAL
Site Address 9546 W CANTERBURY DR
Project Name 
Customer Number 
ePlanReviewNo
Description
MASTER FILE #05-07-001 "THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a three bedroom, two and half bathroom 1462 sq. ft. two story single family dwelling (721 sq. ft. first floor/741 sq. ft. second floor) with a attached 462 sq. ft. two car garage and a 80 sq. ft. covered front porch. Per approved plans and requirement list. CUP04-00007 per Susan Riggs with Planning and Zoning. (SAM) MASTER FILE #05-07-001
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/1/20062/1/20062/1/2006PPASS
DetailsJim Sly
Brian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
C/C issued
DOC - Permit Finaled2/1/20061/30/20061/30/2006PPASS
DetailsJim Sly
BLD-Energy code compliance11/21/200511/21/200511/21/2005PPASS
DetailsJim Sly
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in11/15/200511/15/200511/15/2005PPASS
DetailsJim Sly
brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Foundation7/28/20057/29/20057/29/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/28/2005 at 12:44:02 PM. Contact: ###-####.
BLD-Footing7/27/20057/28/20057/28/2005PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/27/2005 at 5:14:15 PM. Contact: ###-####.
Issue PAID IN FULL permit  7/27/2005 DONE
Inspection Record Card- Bld  7/22/2005 DONE
Permit Ready to Issue  7/22/2005 DONE
Telephone call  7/22/2005 DONE
called told him permit is ready and fees
Plan assigned to (SAM)6/21/20057/18/20057/21/2005 PASS
7/21/2005 16:14:22 SAM - activity updated through activity BLDA022 from case BLD05-01665.
Routing - PLAN CHECK6/23/2005 7/21/2005 PASS
Case Summary (BLD)  7/21/2005  
PLANS/APPL TAKEN TO FRONT DESK  7/21/2005 DONE
Plan Reviewer's activity  7/18/2005 DONE
13:25 I called and left a message for Dave. I let him know that I need a new sheet 3 showing the floor framing. Plans are on hold.
Routing - PLANNING6/21/2005 6/23/2005 PASS
routed to Susan Riggs per cup04-00007.
Needs higher insullation value in ceiling (R-38). Windows meet higher value as required. Required to meet amenity.
Routing - PUBLIC WORKS6/23/2005 6/23/2005 PASS
Application received  6/21/2005