Third Notice BLD | 9/22/2008 | 9/22/2008 | 12/4/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 6/26/2008 | 6/26/2008 | 8/11/2008 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/25/2008 | 6/25/2008 | 6/26/2008 | | PEND |
Tony Young
|
|
|
|
DOC - Permit Finaled | 6/26/2008 | 6/26/2008 | 6/26/2008 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 3/19/2008 | 3/20/2008 | 3/20/2008 | A | PASS |
Tony Young
|
|
|
robie Phone #: ###-####
|
BLD-Final | 3/17/2008 | 3/18/2008 | 3/19/2008 | P | NR |
Tony Young
|
|
|
robie Phone #: ###-####
|
Code Occupancy Approval | 3/19/2008 | 3/19/2008 | 3/19/2008 | P | PASS |
Michael Garner
|
|
|
site inspection complete - PASS
|
FIRE-Final Inspection | 3/17/2008 | 3/18/2008 | 3/18/2008 | A | PASS |
Forrest France
|
|
|
Vanilla permit life safety inspection passed, reversed door swing at the south entrance is acceptable pending plan resubmittals per D. Stuart.
|
BLD-Conference | 3/10/2008 | 3/10/2008 | 3/10/2008 | P | PART |
Tony Young
|
|
|
PROFE Phone #: ###-#### extensive conf on project,, guardrails, hand rails, ramps,, need as built for new opening and possible engineering
|
BLD-Framing/Rough-in | 2/19/2008 | 2/20/2008 | 2/20/2008 | A | PASS |
Tony Young
|
|
|
robbie Phone #: ###-#### ok to cover walls
|
BLD-Framing/Rough-in | 2/11/2008 | 2/12/2008 | 2/12/2008 | A | PART |
Tony Young
|
|
|
ROBBIE Phone #: ###-#### ok to insulate between trusses only,, need trades 1st for walls
|
BLD - Request for Extension | 2/4/2008 | 2/4/2008 | 2/4/2008 | | PASS |
Tony Young
|
|
|
on site conf.. ok
|
BLD-Conference | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | PASS |
Tony Young
|
|
|
rob Phone #: ###-#### Note: please call 1/2 hr prior to conference general conf on job,, ok to keep working on project,, may move into area himself,, needs T I permit after this permit is complete
|
BLD-Aging Inspection | 11/28/2006 | 11/28/2006 | 12/1/2006 | | PASS |
Tony Young
|
|
|
|
BLD-Foundation | 5/25/2006 | 5/25/2006 | 5/25/2006 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### exterior piers ok
|
BLD-Foundation | 5/24/2006 | 5/25/2006 | 5/25/2006 | A | CANC |
Tony Young
|
|
|
john Note: late morning if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 5/23/2006 | 5/23/2006 | 5/23/2006 | P | PART |
Tony Young
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt 2 pads
|
Issue PAID IN FULL permit | | | 3/6/2006 | | |
|
|
|
|
Telephone call | | | 12/29/2005 | | DONE |
|
|
|
left mess for robert musheno at ###-#### is ready
|
Telephone call | | | 11/21/2005 | | DONE |
|
|
|
left mess for robert musheno at ###-#### that permit is ready
|
Permit Ready to Issue | | | 11/18/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/18/2005 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 9/21/2005 | | 11/18/2005 | | PASS |
|
|
|
11/18/2005 08:23:20 DRS - activity updated through activity BLDA022 from case BLD05-02630.
|
Routing - PLAN CHECK | 10/20/2005 | | 11/18/2005 | | PASS |
|
|
|
Resubmittals inserted into original plans and engineering. Routing to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2005 | | PASS |
|
|
|
|
Telephone call | | | 11/17/2005 | | DONE |
|
|
|
Talked with Brett Labrie concerning required clearance (42" + door width) for landing at top of ramp per section 1010.5.3, IBC or to swing door into corridor if desired to keep landing as shown on plans. I told Brett I would red-line on plans. I also reviewed the latch side clearance requirements for the access door to future tenant space. This door will also be changed to swing into tenant space to provide required clearances for accessibility. I will red-line on plans.
|
Plan resubmittals received | | | 11/16/2005 | | DONE |
|
|
|
Received transmittal document, & 2 copys of sheets A2.0,M1.0,M2.0,E2.0 Taken to Dan S.
|
Telephone call | | | 10/31/2005 | | DONE |
|
|
|
Talked with Brett Labrie concerning need for non-rated corridor to serve as exit system for common restrooms serving all three or more tenant spaces such that no tenant has to exit through another tenant space per code section 1013.2.1, 2003 IBC. New plans are being prepared showing an exit corridor to serve the restrooms and the new upper level tenant areas.
|
1st review completed | | | 10/20/2005 | | FAIL |
|
|
|
failed plan check.
|
Routing - FIRE | 10/4/2005 | | 10/19/2005 | | PASS |
|
|
|
No review comments required.
|
Plan resubmittals received | | | 10/17/2005 | | |
|
|
|
Received (3) copies of sheet A0.1, A1.1, A1.2 and A2.0. Also received (3) sets of calculations, (1) Request for Consideration letter addressed to George Slane and (1) Project start-up form for special inspection. Routed to Dan S.
|
Plan Reviewer's activity | | | 10/17/2005 | | DONE |
|
|
|
Received written request for alternative exiting for the common use areas through one of the existing tenant spaces. I took this request to the building official, George Slane, who denied the request as this was specifically not allowed per section 1013.2.1, 2003 IBC. I faxed a copy of this code section with notification that alternative exit request through the tenant was denied.
|
Routing - PLAN CHECK | 9/28/2005 | | 10/4/2005 | | FAIL |
|
|
|
e-mailed (brett@studiolarchitecture.com) and faxed copy of correction plan review to Brett G. Labrie @ ###-####.
|
Plan resubmittals requested | | | 10/4/2005 | | DONE |
|
|
|
E-mailed and faxed copy of plan review correction report to Brett Labrie.
|
Routing - PLANNING | 9/23/2005 | | 9/28/2005 | | PASS |
|
|
|
Sarah Schafer DRH02-00253 Mod #1
Approved.
|
Routing - PUBLIC WORKS | 9/21/2005 | | 9/23/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 9/23/2005 | | 9/23/2005 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Plans ACCEPTED BY PLAN TECH | | | 9/21/2005 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/21/2005 | | |
|
|
|
|
Application received | | | 9/19/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/19/2005 | | |
|
|
|
|
Fee Review-notes | 9/19/2005 | 9/19/2005 | | | |
|
|
|
|