Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberBLD06-03240
StatusFinaled
Name ATM CONSTRUCTION LLC
Site Address 1222 LEADVILLE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
"CONTRACTOR CHRIS SABALA REGISTRATION NUMBER RCE-3390" To construct a 1496sq.ft. Two story Townhouse on a zero lot line (765sq.ft. Main floor / 731sq.ft. Upper floor) with a 108 sq.ft. Covered front porch, a 32sq.ft. Covered rear patio, and a 480 sq.ft. detached garage per approved plans, all red-lining, and Plan review report. THE CONSTRUCTION OF THE DWELLING UNIT SEPARATION WALL IS DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. R-2 Zoning district, building setbacks, and DRH06-00301 per Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/25/20079/26/20079/26/2007APASS
DetailsJim Storey
arron Phone #: ###-####
DOC - Permit Finaled9/26/20079/26/20079/26/2007PPASS
DetailsJim Storey
Code Occupancy Approval9/25/20079/25/20079/25/2007PPASS
DetailsJoe R Venneman
Code Occupancy Approval  9/25/2007 DONE
Code Occupancy Approval  9/4/2007 DONE
BLD-Energy code compliance7/19/20077/20/20077/20/2007APASS
DetailsJim Storey
aaron; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Framing/Rough-in7/19/20077/20/20077/20/2007APASS
DetailsJim Storey
aaron; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Framing/Rough-in7/18/20077/18/20077/19/2007PDEFR
DetailsJim Storey
aaron Phone #: ###-#### out of time
BLD-Framing/Rough-in7/18/20077/19/20077/19/2007APART
DetailsJim Storey
aaron Phone #: ###-#### c/n
BLD-Foundation5/29/20075/30/20075/30/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/29/2007 at 8:26:53 PM. Contact: ###-####.
BLD-Footing5/29/20075/29/20075/29/2007PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/29/2007 at 8:39:30 AM. Contact: ###-####.
BLD-Foundation5/9/20075/10/20075/11/2007PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/9/2007 at 9:37:43 AM. Contact: ###-####.
BLD-Footing5/9/20075/9/20075/9/2007PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/9/2007 at 9:35:42 AM. Contact: ###-####.
Issue PAID IN FULL permit  5/3/2007 DONE
Inspection Record Card- Bld  4/19/2007 DONE
Ready Permit EXTENDED  4/13/2007 DONE
Plan assigned to (SRZ)11/13/2006 2/8/2007 DONE
Plans need Wall bracing as per Boise city plan submittal requirements, Garage fire seperation wall detail, Garage roof plan, Smoke detectors downstairs and upstairs. (SRZ)
2/2/07 Plans need to be corrected as per red-lines and resubmitted. (SRZ)
Routing - PLAN CHECK2/2/2007 2/8/2007 PASS
Case Summary (BLD)  2/8/2007  
PLANS/APPL TAKEN TO FRONT DESK  2/8/2007 DONE
Inspection Record Card- Bld  2/8/2007 DONE
Telephone call  2/8/2007 DONE
Called Chris permit reasdy and fee given ///DLD
CHANGE STATUS TO (RDY)  2/8/2007 DONE
Telephone call  2/8/2007 DONE
lft vm with chris ###-#### that permit and fees are ready to be picked up
Plan resubmittals requested  2/2/2007  
Routing - PLAN CHECK12/29/2006 2/2/2007 FAIL
Plans need to be corrected as per red-lines and resubmitted. (SRZ)
Plan resubmittals received  1/29/2007  
Received 1 copy of sheets A-1.0, A-2.1, A-3.1, A-4.1, A-5.1, A-6.1, ME-1 and taken to Sam Zahorka
Plan resubmittals requested  12/29/2006  
Routing - PLAN CHECK12/12/2006 12/29/2006 FAIL
Plans need Wall bracing as per Boise city plan submittal requirements, Garage fire seperation wall detail, Garage roof plan, Smoke detectors downstairs and upstairs. (SRZ)
Routing - PUBLIC WORKS12/12/2006 12/12/2006 PASS
Routing - PLANNING12/12/2006 12/12/2006 PASS
Landscape plan received 12/11/06
Routing - PLANNING11/14/2006 11/22/2006 FAIL
Need landscape plan
Josh Wilson DRH06-00301
Routing - Addressing11/13/2006 11/14/2006 PASS
Application received  11/13/2006  
Pending Assignment by SRZ11/13/2006 11/13/2006 DONE