Second Notice BLD | 4/23/2008 | 4/23/2008 | 4/25/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 3/19/2008 | 3/19/2008 | 4/23/2008 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 3/18/2008 | 3/19/2008 | 3/19/2008 | P | PASS |
Tom Arcoraci
|
|
|
John Please call 1/2 hr before going out Phone #: ###-####
|
DOC - Permit Finaled | 3/19/2008 | 3/19/2008 | 3/19/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 3/18/2008 | 3/19/2008 | 3/19/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Other | 3/17/2008 | 3/18/2008 | 3/18/2008 | P | PASS |
Tom Arcoraci
|
|
|
John, inspection on the bleachers, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Aging Inspection | 2/5/2008 | 2/5/2008 | 2/5/2008 | | PASS |
Tom Arcoraci
|
|
|
|
Telephone call | | | 11/6/2007 | | DONE |
|
|
|
t/c w john hart at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/6/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/6/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/29/2007 | | 11/5/2007 | | PASS |
|
|
|
Resubmittals complete. Plans to permit desk to issue.
|
Telephone call | | | 11/5/2007 | | DONE |
|
|
|
I talked with Fred Radfar, Engineer of Record, concerning a cover letter from him with his Idaho stamp, signature and date declarinf he had witnessed the testing and had reviewed Joe Sudkamp's report and approved same before report was forwarded to our department. Cover letter report of 10/1/07 from Mr. Sudkamp to Fred Radfar did not contain any evidence (his stamp, signature and date) that he had seen and approved the test data. Mr. Radfar will send me a copy of the report wth his stamp, signature and date approving the testing results for the 200 pound point loading of the self-storing guardrails.
|
Plan resubmittals requested | | | 11/5/2007 | | DONE |
|
|
|
Received e-mail copy of Fred Radfar cover letter of approval and copies of test results he approved. Assembling data to take plans to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2007 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 5/11/2007 | | 11/5/2007 | | PASS |
|
|
|
11/5/2007 14:31:18 DRS - activity updated through activity BLDA022 from case BLD07-01054.
|
Routing - PLAN CHECK | 8/29/2007 | | 10/29/2007 | | FAIL |
|
|
|
Received e-mail from John Hart with cover letter that was intended to accompany the resubmittals of 10/16/07. The document provided an opinion of Joe Sudkamp, Irwin Telescoping Seating Co., but did not have any evidence of having gone through and being approved as meeting the code requirements by Fred F. Radfar, Design Professional In Responsible Charge. I ask for Fred Radfar written approval of the design report and an updated copy of the Appendix F analysis of Data report showing the self-storing guard rail being tested at the 200 pound requirement and complying with code for load and deflection, the same as other listed components. I e-mailed Fred Radfar and copied John Hart for required information.
|
Plan Reviewer's activity | | | 10/22/2007 | | DONE |
|
|
|
INSERTED RESUBMITTALS OF 10/16/07 INTO PLANS. DESIGN REQUIREMENTS PER NASPEC 2001 STANDARD FOR COLD ROLLED STEEL WAS NOTED ON PLANS AND ESR-1917, HILTI KUIK BOLT TZ WITH 2" EMBED WAS PROVIDED FOR CONCRETE ANCHORAGE. GUARDRAIL DESIGN DATA FOR 200 POUND PONT LOAD WAS NOT ADDRESSED IN SUBMITTAL PACKAGE. E-MAILED TO JOHN HART TO PROVIDE REQUIRED CODE COMPLIANCE DESIGN DATA FROM ENGINEER.
|
Plan resubmittals received | | | 10/16/2007 | | |
|
|
|
Received transmittal, Registered Design Professional in Charge page of application, two copies of revised Calculation Packet and ES Report, three copies of the following pages: cover, plan & elevation (2pgs.), electrical (1pg.), wheelpath (2pgs.), 1 of 8, 2 of 8, 5 of 8, 6 of 8, 7 of 8; taken to Dan Stuart
|
Routing - PLAN CHECK | 6/27/2007 | | 8/29/2007 | | FAIL |
|
|
|
Responsible professional in responsible charge changed from Margie Kennedy (architect) to Fred Radfar (engineer). Resubmittal items of 8/27/07 were not correct and did not answered or provided evidence of compliance with the 2003 IBC. Additional clarification was added to original plan review and a copy of outstanding requirements was e-mailed to Fred Radfar, John Hart (Saxton-Bradley) and Chris Wendrowski (Boise School District). Plans on hold at my desk.
|
Plan resubmittals requested | | | 8/29/2007 | | DONE |
|
|
|
Copy of 3rd plan review items needing to be addressed e-mailed to Engineer, contractor and school district.
|
Plan resubmittals received | | | 8/28/2007 | | |
|
|
|
Received application page Registered Design Professional in Charge, two copies of the following: response letter from installer, letter from engineer with ES Report, cover sheet, page 1 of 3, 2 of 3, 3 of 3, wheelpath (2 pgs), typical deck construction, tracking system, standard RRB, floor attachment, standard P-Rail, and SS end rail; taken to Dan Stuart
|
Routing - PLAN CHECK | 6/4/2007 | | 6/27/2007 | | FAIL |
|
|
|
Plan resubmittals of 6/21/07 provide response to item #1 (engineers statement that existing structure was designed for telescoping bleachers) and #5 (providing occupant load design for both upper levels of gym where bleachers are being installed). Other items were not addressed but a note provided that contractor for bleachers would provide other information. I added code section 106 that requires plans to be stamped, signed and dated by Idaho licensed design professional and that all submittals by others are required to route through the designated design professional in responsible charge. I sent a copy to Margie Kennedy and John Hart.
|
Plan resubmittals received | | | 6/26/2007 | | |
|
|
|
Received 1 cover transmittal, 1 response letter from Margie Kennedy, 1 copy of an e-mail from Margie Kennedy to Dan Stuart, 1 page letter from AHJ Engineers, 2 copies of sheet A0.01 and taken to Dan Stuart
|
Plan Reviewer's activity | | | 6/19/2007 | | DONE |
|
|
|
Copy of original plan review comments e-mailed to John Hart, Saxton bradley Inc., applicant for permit at his request. john-hart@cableone.net
|
Routing - FIRE | 5/31/2007 | | 6/4/2007 | | PASS |
|
|
|
Approved. No seperate review comments attached to plans.
|
1st review completed | | | 6/4/2007 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 5/31/2007 | | DONE |
|
|
|
E-mail to Margie Kennedy concerning design data presented in Calculation Packett concerning design standard referenced and current standard in Ch. 35 IBC for cold steek design; ESR-1328 for masonry connection and we need a concrete connection system; and the 200 pound point load design for the end rails and comments by designer that the measured residuals ... exceed the allowable and what is ment by the note.
|
Plan Reviewer's activity | | | 5/31/2007 | | DONE |
|
|
|
Received two copies of "Calcualtion Packet" to go with plans. Reviewed data and found some additional questions needing to be addressed. E-mailed copy of items to Margie Kennedy, architect.
|
Routing - PLAN CHECK | 5/11/2007 | | 5/31/2007 | | FAIL |
|
|
|
Resubmittals required. E-mails to Margie Kennedy for clarification. Routing plans to fire code analyst for review.
|
Pending Assignment by MYS | 4/30/2007 | | 5/11/2007 | | DONE |
|
|
|
5/11/2007 09:52:25 MYS - activity updated through activity BLDA168 from case BLD07-01054.
|
Plans ACCEPTED BY PLAN CHECK | | | 5/11/2007 | | DONE |
|
|
|
Resubmittals of floor plans received so we can now begin to process.
|
Plan resubmittals received | | | 5/10/2007 | | |
|
|
|
received letter of transmital from hummel arch & "2" sheets each of A2.O2--plans taken to Marlene Southard
|
Plan resubmittals requested | | | 5/9/2007 | | DONE |
|
|
|
Contacted Margie Kennedy at Hummel Architects to get copies of the floor plans showing the locations of the bleachers. We cannot process without this information.
|
Recd Pcfee & Taken To Pln CK | | | 4/30/2007 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/30/2007 | | FAIL |
|
|
|
|
Application received | | | 4/26/2007 | | |
|
|
|
|