Letter of compliance/Occupancy | | | 12/17/2014 | | DONE |
|
|
|
|
Third Notice BLD | 1/29/2009 | 1/29/2009 | 3/13/2009 | | DONE |
Patricia Smith
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/8/2009 | 1/8/2009 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 12/23/2008 | 12/23/2008 | 1/8/2009 | | DONE |
Tony Young
|
|
|
|
BLD-Final | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
Tony Young
|
|
|
JOE Phone #: ###-####
|
DOC - Permit Finaled | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Final | 12/19/2008 | 12/22/2008 | 12/22/2008 | A | NR |
Dave Hannah
|
|
|
joe Phone #: ###-#### no plans or sign off card on site
|
Zoning Approval | 12/17/2008 | 12/17/2008 | 12/17/2008 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 10/2/2008 | 10/3/2008 | 10/3/2008 | A | PASS |
Troy Cobbley
|
|
|
fire safety passed
|
FIRE-Final Inspection | 9/29/2008 | 10/1/2008 | 10/1/2008 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the fire alarm permit is finaled
|
Code Occupancy Approval | | | 9/16/2008 | | FAIL |
|
|
|
The applicant has not updated the building permit plans in regard to the most up to date site plan and landscape plan. ***The applicant has utilized rock mulch on the site as opposed to a bark mulch. Also the parapets that were approved as part of DRH08-00304 and CZC08-00142 have not been constructed.
The applicant has been instructed to remove the rock mulch, update the building plans, and either construct the parapets or bond for them. 9-16-08 ANT
|
FIRE-Final Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | CANC |
Troy Cobbley
|
|
|
Project is not ready fo the fire life safety inspection.
|
BLD-Framing/Rough-in | 8/28/2008 | 8/29/2008 | 8/29/2008 | A | PART |
Jim Sly
|
|
|
Joe Phone #: ###-#### Fire Riser room.....OK... (behind Thursdays).
|
(F) Reprint permit | | | 8/27/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/27/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/27/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/14/2008 | 7/14/2008 | 8/26/2008 | | PASS |
Carl Westfall
|
|
|
8/26/2008 07:39:11 CJW - activity updated through activity BLDA022 from case BLD07-03079.
|
Routing - PLAN CHECK | 8/25/2008 | | 8/26/2008 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/26/2008 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/26/2008 | | DONE |
Tisha Gallop
|
|
|
called Stephanie Clarkson (Erstad Arch.) and left voice mail that plan mod is ready and fees
|
Permit Ready to Issue | | | 8/26/2008 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 8/25/2008 | | 8/25/2008 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 7/28/2008 | | 8/25/2008 | | DONE |
Carl Westfall
|
|
|
On hold until Planning calls for the drawings.
|
Routing - FIRE | 7/25/2008 | | 7/28/2008 | | PASS |
Kenneth R Roule
|
|
|
Attached modified IFC comments to plans.
|
Routing - PLAN CHECK | 7/14/2008 | | 7/25/2008 | | PASS |
Carl Westfall
|
|
|
(7-23-08) waiting for revised drawings. Called Stephanie Clarkson with Erstad Architects and asked for revised drawings. (7-25-08) Completed the modification review. Drawings approved with "red lines".
|
Plan Modification Accepted | | | 7/14/2008 | | |
Carl Westfall
|
|
|
Plan modification accepted for bld07-03079 to modify that the existing equipment for fire riser is currently in open storage room and want to now construct 2 1hr rated walls and a 1hr rated floor-ceiling assembly to enclose equipment, an access door will be added to the exterior of the building. Submitted on sheets A2.11, A2.12 and routed to Carl Westfall
|
BLD-Foundation | 4/15/2008 | 4/16/2008 | 4/16/2008 | P | PASS |
Tony Young
|
|
|
joe - late afternoon please Phone #: ###-#### front pier ftgs for canopy on far east building
|
BLD-Framing/Rough-in | 3/18/2008 | 3/18/2008 | 3/19/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### wip
|
BLD-Framing/Rough-in | 3/17/2008 | 3/18/2008 | 3/18/2008 | A | NR |
Tony Young
|
|
|
joe Phone #: ###-####
|
BLD-Framing/Rough-in | 3/17/2008 | 3/17/2008 | 3/17/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### wip on "thursdays" front
|
BLD-Framing/Rough-in | 3/14/2008 | 3/14/2008 | 3/14/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-####
|
BLD-Framing/Rough-in | 3/12/2008 | 3/12/2008 | 3/12/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### west unit 2nd from end mansord ok
|
BLD-Framing/Rough-in | 3/6/2008 | 3/11/2008 | 3/11/2008 | A | PART |
Tony Young
|
|
|
joe - early morning Phone #: ###-#### upper sectin ok wast side f east building ok,, nted on contractor set of plans
|
BLD-Conference | 3/5/2008 | 3/6/2008 | 3/6/2008 | A | PART |
Tony Young
|
|
|
joe - please call 1 hr prior to inspection Phone #: ###-#### conf about inspection requests,, will be doing demo at night and frame and cover 1st thing in mornings so bussiness can be open in morn.. will have 1st inspection on 11mar08?
|
(F) Reprint permit | | | 3/3/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/3/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/11/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/5/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/5/2008 | | DONE |
|
|
|
t/c w andrew erstad at ###-#### - permit ready and fees given - also need gc name, rce# and ACHD receipt
|
Permit Ready to Issue | | | 2/5/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/23/2008 | | 2/4/2008 | | PASS |
Carl Westfall
|
|
|
Drawings approved, with "red lines" after resubmittal review.
|
Plan assigned to (CJW) | 12/6/2007 | | 2/4/2008 | | PASS |
Carl Westfall
|
|
|
2/4/2008 16:38:24 CJW - activity updated through activity BLDA022 from case BLD07-03079.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/25/2008 | | DONE |
|
|
|
received 1 transmittal sheet,and 2 copies of structural calcs taken to Carl W.
|
Plan resubmittals received | | | 1/24/2008 | | |
|
|
|
received transmittal and two copies of pages a1.21, a2.11, a4.21, a6.11; taken to Carl Westfall
|
Routing - FIRE | 1/18/2008 | | 1/23/2008 | | PASS |
Kenneth R Roule
|
|
|
IFC 2003 1st review
|
1st review completed | | | 1/23/2008 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/13/2007 | | 1/18/2008 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on January 17, 2008 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 12/13/2007 | | 12/13/2007 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning DRH07-00453
|
Routing - Erosion and Sediment | 12/12/2007 | | 12/13/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 12/6/2007 | | 12/12/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 12/6/2007 | | 12/11/2007 | | PASS |
|
|
|
|
Routing PW Street Lights | | | 12/11/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 12/11/2007 | | 12/11/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 12/3/2007 | | 12/6/2007 | | DONE |
|
|
|
12/6/2007 10:12:00 MYS - activity updated through activity BLDA172 from case BLD07-03079.
|
Plans ACCEPTED BY PLAN TECH | | | 12/3/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/3/2007 | | DONE |
|
|
|
|
Application received | | | 12/3/2007 | | |
|
|
|
|