Permit Information
Permit NumberBLD07-03243
StatusFinaled
Name RAFIKI
Site Address 6202 W STATE ST
Project NameRAFIKI
Customer Number 
ePlanReviewNo
Description
(RAFIKI - CHILDREN'S PLAY AREA) To remodel an existing 6,325 sq.ft. space to become an assembly area for childrens' party and play areas with associated office, kitchen, public restrooms, staff restroom & reception support areas per approved plans and CUP08-00006. POST SIGN ADJACENT TO MAIN ENTRY / EXIT DOOR STATING "MAXIMUM OCCUPANT LOAD ALLOWED '186' ". This building is fully sprinklered. The open ceiling area above the party rooms and storage are for display use only. Plans were not presented or reviewed for any classified occupancy use or group of the upper area. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  4/12/2013 DONE
DetailsChristina Prado
CHANGE STATUS TO (COL)  12/7/2010 DONE
DetailsRita DeYoung
Routing - PLAN CHECK6/24/2008 9/16/2008 PASS
DetailsCathy Brown
Second Notice BLD8/11/20088/11/20089/3/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 6/26/20088/11/2008 DONE
Permanent Occupancy  6/26/2008 DONE
DetailsTisha Gallop
BLD-Final6/24/20086/25/20086/25/2008PPASS
DetailsTony Young
robere Phone #: ###-####
BLD-Final6/25/20086/25/20086/25/2008PCANC
DetailsForrest France
FIRE-Final Inspection6/25/20086/25/20086/25/2008PPASS
DetailsForrest France
Fire life safety complete. KR
Print Pending Permit.LaserJet4  6/24/2008  
Case Summary (BLD)  6/24/2008  
Routing - FIRE  6/24/2008 PASS
DetailsScott Arellano
Attached modified IFC comments to plans. Occupancy for the "A" area reduced to 186.
Print Occupancy Form  6/24/2008 DONE
DetailsTisha Gallop
Plan Reviewer's activity  6/24/2008 DONE
Architect Duane Marler & owner of RAFIKI - Childrens indoor play area, Robere Kazadi, made a written request, accompanied by furniture and fixture layout within the large children's play area, to reduce the occupant load within the play area by applying an occupant load factor of 35 rather than the 15 originally used. The original occupant load of 352 (15 factor) would overcrowd the space such that children could play. Use of the 35 factor changed the A3 assembly occupant load portion to 186. This factor, 35, is used for daycare play areas. This space is similar to a Pojo's or Chucky Cheese but without all the game machines. The building permit, building permit plan review and the fire code plan review have been modified to reflect the change in occupant load. A copy of modified reports & permits have been attached to the office set of plans and Mr. Kazadi is bringing his approved plan set and attachment to a meeting at 10 a.m. today so the same notes and documentation will be attached to his filed set of plans to match the office set.
CHANGE STATUS TO (ISS)  6/24/2008  
already issued
BLD-Final6/19/20086/20/20086/20/2008PNR
DetailsTony Young
Robere ###-####
on site conf only,, need trades 1st
FIRE-Final Inspection6/19/20086/20/20086/20/2008AFAIL
DetailsTroy Cobbley
Previous deficiencies have been corrected except for the fire alarm issues. Owner is conversing with Dan Stuart about occupant load issues.
Telephone call  6/20/2008 DONE
I returned a phone message from Rober on Friday, 6/20 (###-####) and spoke with him regarding the fire alarm system requirement. He indicated George Slane had agreed to approve a TOC, subject to Fire approval, while Rober tries to obtain a reduction in O/L from the Buidling dept, and that George had suggested he call me to discuss further.
He asked for a TOC until he could get the O/L reduced below 300, because he was sure he would not have that large of groups there. I explained he could not get the number reduced on that basis but that Dan Stuart had sent his architect a written explanation of the procedure required to get the number reduced.
I suggested that leaving it at the current number over 300 would give him greater long-term flexibility to use the space for similar but larger functions. He then agreed and said he wasn't trying to avoid installing a fire alarm system but wanted the TOC because this requirement was just brought up at the last step in his permit inspection process. I pointed his application showed $3000 to install a new system and the requirement to obtain a fire alarm permit was included in our Fire plan review report.
He then said he would readily accept responsibility for any oversights on his part but still wanted a TOC to give him time to get the system installed. I told him the Fire Marshal had indicated he would accept a fire watch by a licensed security firm, as an acceptable alternative for a TOC during the interim until an alarm system could be installed. He replied that he definitely would not use that option, as it was simply a bureaucratic technicality and it wouldn't be financially justifiable; and that he would just postpone his planned opening date.
I also explained that the alarm system requirement was for the A3 occupancy fire area, which in this case included the adjacent, non-fire separated Zamzow space. He immediately began to berate that requirement, but I explained that the fire marshal would be willing to consider a written request to "defer" installation of the visual alarm devices in Zamzow's, until a stipulated implementation date. If approved, this deferral could enable him to get occupancy sooner and at less initial expense. I explained the proposal would also need to be signed by Zamzow's. He indicated he understood but seemed to brush it off without further discussion.
FIRE-Final Inspection6/17/20086/17/20086/17/2008PFAIL
DetailsTroy Cobbley
Provide exit discharge lighting as per the notes on the approved plans. Provide annual inspection tag for the fire extinguishers. Provide canopies for the sprinkler pendants.
Telephone call  6/17/2008 DONE
telcon from "Robear" (spelling?) "General Contractor" questioning the need for fire alarm permit for installing an existing duct smoke detector into a newly created return air plenum created to serve three newly installed air handling units. I confirmed the need to obtain a Fire alarm permit to approve the modification. I indicated this could be handled with a Quick permit which has a 2-day review time, assuming all information is properly submitted. I suggested he engage a fire alarm contractor to ensure all information was properly included with the application and that the installation was done properly, as well as to be present to conduct the testing at the final insepction.
BLD-Framing/Rough-in5/1/20085/2/20085/2/2008PPASS
DetailsTony Young
Robere; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Case Summary (BLD)  4/10/2008  
Issue PAID IN FULL permit  4/10/2008 DONE
Routing - PLAN CHECK4/8/2008 4/9/2008 PASS
DetailsDan Stuart
Two copies of each of mechancial sheets with the architects stamp, signature and date have been provided. Routing to permit desk to issue.
Plan resubmittals received  4/9/2008  
Received two copies of HVAC plan and Mechanical Compliance on full size plan sheet; taken to Dan Stuart
PLANS/APPL TAKEN TO FRONT DESK  4/9/2008 PASS
Print Occupancy Form  4/9/2008 DONE
Telephone call  4/9/2008 DONE
called Robere and left voice messgae permit is ready, fee, need GC, RCE, ACHD
Permit Ready to Issue  4/9/2008 DONE
Routing - PLUMBING  4/8/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - FIRE4/3/2008 4/8/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLANNING4/8/2008 4/8/2008 PASS
DetailsDavid Moser
Plan resubmittals received  4/7/2008  
Received two copies of mechanical compliance on full size plan sheets; taken to Dan Stuart
Routing - PLAN CHECK3/28/2008 4/3/2008 FAIL
DetailsDan Stuart
Resubmittals required were incomplete. Inserted new plan sheets and reviewed for corrections. E-mail to Duane Marler & Roere Kazadi of remaining items needing to be submitted.Routing back to fire code analyst for re-review.
Plan resubmittals received  4/2/2008  
Received transmittal, response letter, application for Project Start Up for Special Inspections, ES Report, and two copies of sheeets A1, A2, A3, A4, A5, A6, S1, S2, S3; taken to Dan Stuart
Routing - FIRE3/21/2008 3/28/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  3/28/2008 FAIL
Failed Plan Check, Fire
Plan resubmittals requested  3/21/2008 DONE
Copy of plan review to architect and tenant.
Routing - PLAN CHECK3/13/2008 3/21/2008 FAIL
DetailsDan Stuart
Plan resubmittals required. Copy of report e-mailed to architect and tenant. Routing plans to fire code analyst.
Routing - PLANNING3/12/2008 3/12/2008 FAIL
DetailsDavid Moser
Dave Moser failed the plan because the 10 day appeal period has not ended yet. The 10 day appeal period for CUP08-00006 ends on 3/20/08.
Routing PW Environmental3/11/2008 3/12/2008 PASS
DetailsWalt Baumgartner
Soup/Sandwhich shop type menu. No grease abatement at this time unless there is change of menu or kitchen equipment.
Routing - PUBLIC WORKS3/11/2008 3/12/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating3/11/2008 3/11/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS3/5/2008 3/11/2008 DONE
DetailsMarlene Southard
3/11/2008 14:33:12 MYS - activity updated through activity BLDA168 from case BLD07-03243.
Application received  3/5/2008 DONE
per e-mail from Marlene it is ok to re-open this permit
Plans ACCEPTED BY PLAN TECH  3/4/2008  
VOIDED CHANGE STATUS  1/11/2008 DONE
Per Marlene void permit. Customer must obtain conditional use permit prior to application of building permit. Informed Robere that need to request a refund in writing within 180 days of date of payment or if resubmits withing that 180 days can have credit towards his new permit. Must resubmitt under code years effective 1/1/08.
Application received  12/21/2007  
need elec, plm, and mech sheets prior to begin routing