Permanent Occupancy | | | 9/15/2014 | | DONE |
Christina Prado
|
|
|
|
Third Notice | | 10/12/2009 | 10/23/2009 | | DONE |
|
|
|
called
|
Telephone call | | | 10/23/2009 | | DONE |
Tisha Gallop
|
|
|
called Kouba Homes and he said he has final values and will have tenent fax them to me today. I told him if not recieved w/in 2 weeks will be put on hold.
|
Third Notice | | 9/4/2009 | 10/2/2009 | | DONE |
|
|
|
called Kouba Homes and mailed
|
Telephone call | | | 10/2/2009 | | DONE |
Tisha Gallop
|
|
|
called Vince/Kouba homes and told him need values. He said will work on them on Monday.
|
Third Notice | | 8/5/2009 | 9/4/2009 | | DONE |
Tisha Gallop
|
|
|
mailed to Kouba Homes and Access Vans
|
Telephone call | | | 9/4/2009 | | |
Tisha Gallop
|
|
|
Fax # and primary # for Kouba homes disconnected. Called Vince (Kouba Homes) cell and left voice message need current number. Mailed third notice to address for Kouba Homes and to Chris Thomas w/Access Vans at project address since no ph# for Chris Thomas (tenant).
|
Second Notice BLD | 3/4/2009 | 3/4/2009 | 8/5/2009 | | DONE |
Tisha Gallop
|
|
|
mailed
|
First Notice | 1/26/2009 | 1/26/2009 | 3/4/2009 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 1/26/2009 | 1/26/2009 | 1/26/2009 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 1/26/2009 | 1/26/2009 | 1/26/2009 | P | PASS |
Jim Storey
|
|
|
|
Case Summary (BLD) | | | 12/30/2008 | | DONE |
|
|
|
|
BLD-Aging Inspection | 8/29/2008 | 8/29/2008 | 8/29/2008 | | PASS |
Jim Storey
|
|
|
card on site signed pending plm. sign off is done for plm.
|
BLD-Final | 6/24/2008 | 6/25/2008 | 6/25/2008 | A | PART |
Jim Storey
|
|
|
Vince; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt pending plm final.
|
BLD-Final | 6/11/2008 | 6/11/2008 | 6/11/2008 | P | PART |
Jim Storey
|
|
|
Vince Phone #: ###-#### exit threshold height/ plm final.
|
FIRE-Final Inspection | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Forrest France
|
|
|
Correction notice items per previous fire life safety inspection are finished, racking has been removed, one exit sign at the office repaired while on site, inspection passed. NOTE: Contractor has misplaced the request for occupancy signature card-not available on site for sign off.
|
BLD-Final | 6/9/2008 | 6/10/2008 | 6/9/2008 | P | CANC |
Jim Storey
|
|
|
vince Phone #: ###-####
|
FIRE-Final Inspection | 6/6/2008 | 6/9/2008 | 6/9/2008 | A | FAIL |
Troy Cobbley
|
|
|
Mount the fire extinguishers. Install the doors and door hardware. Repair exit sign/emergency lights. Provide racking permit for the storage racks. Provide non hardened lock for the gate as per the approved plans.
|
FIRE-Final Inspection | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | DEFR |
Forrest France
|
|
|
vince - fire life safety Phone #: ###-####
|
BLD-Final | 6/5/2008 | 6/6/2008 | 6/6/2008 | A | CANC |
Jim Storey
|
|
|
vince Phone #: ###-#### reschudel pm 6/10/2008
|
BLD-Conference | 6/5/2008 | 6/6/2008 | 6/5/2008 | P | CANC |
Jim Storey
|
|
|
vince Phone #: ###-#### Inspection cancelled from web by: Alexandra Rahn
|
BLD-Energy code compliance | 5/12/2008 | 5/13/2008 | 5/13/2008 | P | PASS |
Jim Storey
|
|
|
vince Phone #: ###-####
|
BLD-Framing/Rough-in | 5/9/2008 | 5/12/2008 | 5/12/2008 | A | PASS |
Jim Storey
|
|
|
vince Phone #: ###-#### need backing for verital grab bars in restrooms. ok to insulate.
|
(F) Reprint permit | | | 3/20/2008 | | |
|
|
|
|
Telephone call | | | 3/17/2008 | | DONE |
|
|
|
t/c w peter rockwell at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/17/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/17/2008 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 1/25/2008 | 1/25/2008 | 3/14/2008 | | PASS |
Sam Zahorka
|
|
|
3/14/2008 11:13:13 SRZ - activity updated through activity BLDA022 from case BLD08-00011.
|
Routing - PLAN CHECK | 2/19/2008 | | 3/14/2008 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 3/14/2008 | | |
|
|
|
Received response letter and two copies of revised structural calcs, structural design calculations for steel building, and sheets S-1.1, C1, ES-1, F1, F2, E1, E2, E3, E4, E5, E6, DET1, DET2, DET3; inserted by LEG and taken back to Sam Z.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/14/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/14/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/26/2008 | | |
|
|
|
Received 1 response letter from Glancy/Rockwell, 1 copy of plan reveiw comments, 2 copies of page A1.1, A4.1, A5.1, MP-1.2 and inserted into plans by Achritects office and taken back to Sam Zahorka's desk///2-26-08 @ 3:27pm BAS
|
1st review completed | | | 2/19/2008 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - FIRE | 2/14/2008 | | 2/19/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing Off Site - STRUCTURAL | 1/31/2008 | | 2/14/2008 | | PASS |
Sam Zahorka
|
|
|
Written responses to the structural plan check review comments are required. Verification that the structure can handle the min. roof snow load of 25 lbs. psf. Also provide the calculations ensuring the existing foundation can support the revised reactions. (SRZ) ###-####
Recieved re-submittals from the Metal building manuf. and the structural engineer correcting the snow load and the new foundation calculations. (SRZ)
|
Routing - PLAN CHECK | 1/30/2008 | | 2/14/2008 | | FAIL |
Sam Zahorka
|
|
|
Plan corrections sent to the Architect. Re-submittals requested. (Sam Zahorka ###-####)
|
Case Summary (BLD) | | | 2/14/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 2/13/2008 | | DONE |
|
|
|
|
Telephone call | | | 1/31/2008 | | |
|
|
|
called Action Couriers for pick up
|
Routing - PLANNING | 1/29/2008 | | 1/30/2008 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PLUMBING | 1/28/2008 | | 1/29/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing PW Sewer Rating | 1/28/2008 | | 1/28/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PUBLIC WORKS | 1/28/2008 | | 1/28/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 1/28/2008 | | 1/28/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 1/25/2008 | | 1/25/2008 | | PASS |
Joan Johnson
|
|
|
Boise Industrial Foundation
|
Plan routing begun/NEW & ADDTN | | | 1/25/2008 | | |
|
|
|
|
Pending Assignment by MYS | 1/3/2008 | | 1/25/2008 | | DONE |
Tisha Gallop
|
|
|
1/25/2008 13:52:31 LEG - activity updated through activity BLDA160 from case BLD08-00011.
|
Plans ACCEPTED BY PLAN TECH | | | 1/25/2008 | | DONE |
|
|
|
Ok to start routing without structural calcs for steel building per John Menard. The applicant will submit them when they get them from the manufacturer.
|
Recd Pcfee & Taken To Pln CK | | | 1/3/2008 | | DONE |
|
|
|
|
Application received | | | 1/3/2008 | | |
|
|
|
need structural calcs for steel building
|