Second Notice BLD | 9/22/2008 | 9/22/2008 | 10/30/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/22/2008 | 9/22/2008 | | DONE |
|
|
|
|
BLD-Final | 8/21/2008 | 8/22/2008 | 8/22/2008 | A | PASS |
Dave Hannah
|
|
|
Shawn Phone #: ###-#### ok for perm occ
|
Permanent Occupancy | | | 8/22/2008 | | |
|
|
|
|
BLD-Final | 8/18/2008 | 8/19/2008 | 8/19/2008 | P | NR |
Mike Jordan
|
|
|
shawn Note: please call 1/2 hr prior to inspection Phone #: ###-####
|
FIRE-Final Inspection | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Forrest France
|
|
|
Repairs have been completed, fire life safety passed.
|
Code Occupancy Approval | 8/14/2008 | 8/14/2008 | 8/14/2008 | P | PASS |
Joe R Venneman
|
|
|
|
Code Occupancy Approval | | | 8/14/2008 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/12/2008 | 8/13/2008 | 8/13/2008 | A | FAIL |
Forrest France
|
|
|
Repair exit signs and emergency lighting at four locations, remainder of life safety items acceptable.
|
BLD-Framing/Rough-in | 6/24/2008 | 6/25/2008 | 6/25/2008 | P | PASS |
Jim Sly
|
|
|
Shawn- call 30 min prior to going Phone #: ###-#### Block...tie downs and skirt OK
|
BLD-Aging Inspection | 6/19/2008 | 6/19/2008 | 6/25/2008 | | PART |
Dave Hannah
|
|
|
wip
|
Routing - PLAN CHECK | 3/20/2008 | | 3/20/2008 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 3/20/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/20/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/20/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 1/30/2008 | | 3/20/2008 | | PASS |
Tim L. Woodard
|
|
|
3/20/2008 14:32:44 TLW - activity updated through activity BLDA022 from case BLD08-00177.
|
Routing - PUBLIC WORKS | 3/5/2008 | | 3/12/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Design | 3/7/2008 | | 3/11/2008 | | PASS |
Jim Pardy
|
|
|
|
Plan resubmittals received | | | 3/7/2008 | | |
|
|
|
Received transmittal and five coipes of sheet A1.1; inserted by LEG and taken back to Brian Murphy
|
Routing PW Drainage | 3/5/2008 | | 3/7/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 2/25/2008 | | 3/5/2008 | | PEND |
Tim L. Woodard
|
|
|
Routed to public works Brian Murphy.
|
Plan resubmittals received | | | 3/5/2008 | | |
|
|
|
received transmittal and two copies of Infiltration Testing & General Groundwater document; inserted into plans by LEG and taken to Tim Woodard
|
Routing - Erosion and Sediment | 2/7/2008 | | 3/5/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. Under ESC08-00057.
|
Routing - FIRE | 2/22/2008 | | 2/25/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 2/25/2008 | | FAIL |
|
|
|
Failed P.W., Drainage
|
Routing - PLAN CHECK | | | 2/22/2008 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
Routing - PLANNING | 2/13/2008 | | 2/22/2008 | | PASS |
Joshua Johnson
|
|
|
CUP07-00182 Josh Johnson
|
Routing - PLUMBING | | | 2/13/2008 | | PASS |
Bill VanDegrift
|
|
|
verify existing premise protection prior to final.
|
Routing - PUBLIC WORKS | 2/1/2008 | | 2/7/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Drainage | 2/1/2008 | | 2/7/2008 | | FAIL |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 2/1/2008 | | 2/1/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLANNING Land Div | 1/31/2008 | | 2/1/2008 | | PASS |
Dave Abo
|
|
|
Parcel is over 5 acres in size.
|
Application received | | | 1/30/2008 | | |
|
|
|
|
Pending Assignment by MYS | 1/30/2008 | | 1/30/2008 | | DONE |
John Menard
|
|
|
1/30/2008 15:12:27 JCM - activity updated through activity BLDA185 from case BLD08-00177.
|