Case Summary (BLD) | | | 10/22/2009 | | DONE |
|
|
|
|
Letter of compliance | | | 10/21/2009 | | DONE |
|
|
|
|
BLD-Final | 12/12/2008 | 12/12/2008 | 12/12/2008 | P | PASS |
Jim Storey
|
|
|
mike Phone #: ###-####
|
DOC - Permit Finaled | 12/12/2008 | 12/12/2008 | 12/12/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Wall cover | 9/5/2008 | 9/8/2008 | 9/8/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/5/2008 at 4:53:53 PM. Contact: ###-####.
|
BLD-Energy code compliance | 9/3/2008 | 9/4/2008 | 9/4/2008 | P | CANC |
Jim Storey
|
|
|
mike Phone #: ###-####
|
BLD-Framing/Rough-in | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PASS |
Jim Storey
|
|
|
mike Phone #: ###-####
|
BLD-Framing/Rough-in | 9/3/2008 | 9/4/2008 | 9/4/2008 | A | CANC |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2008 | 8/29/2008 | 8/29/2008 | A | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### garage ok house needs hardy board gyp not continous.
|
FIRE-Final Inspection | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | DEFR |
Forrest France
|
|
|
mike - fire life safety Phone #: ###-#### NOTE..........Notified contact that no fire permit related inspection or signatures are required for this project per permit details- request was intended for a structural inspection.
|
BLD-Footing | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/6/2008 at 2:06:23 PM. Contact: ###-####. set backs at 5 on sides plot plan bust on dimitions.
|
(F) Reprint permit | | | 8/5/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/4/2008 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 7/11/2008 | | |
|
|
|
extend to 10-9-08
|
Telephone call | | | 7/9/2008 | | |
|
|
|
left mess for cullen const at ###-#### that permit will expire & can apply for an extension
|
Telephone call | | | 4/29/2008 | | DONE |
|
|
|
tlk to mike cullen ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 4/29/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/28/2008 | | DONE |
|
|
|
|
Plan assigned to (BSP) | 4/23/2008 | 4/23/2008 | 4/25/2008 | | PASS |
Ben S. Pavelka
|
|
|
4/25/2008 11:41:14 BSP - activity updated through activity BLDA022 from case BLD08-00685.
|
Routing - PLAN CHECK | 4/16/2008 | | 4/25/2008 | | PASS |
Ben S. Pavelka
|
|
|
|
Case Summary (BLD) | | | 4/25/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2008 | | DONE |
|
|
|
|
Telephone call | | | 4/24/2008 | | DONE |
|
|
|
Called Mike Cullen at ###-#### to ask for details for a fire rated eave to 1 hour and a detail of a one hour wall assembly for a wall closer than five feet to the property line. BSP
|
Plans ACCEPTED BY PLAN CHECK | | | 4/23/2008 | | |
Ben S. Pavelka
|
|
|
|
Routing - PUBLIC WORKS | 4/16/2008 | | 4/16/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLANNING | 4/9/2008 | | 4/16/2008 | | PASS |
Susan Riggs
|
|
|
Routed to Susan Riggs-CUP05-00142
|
Application received | | | 4/9/2008 | | |
|
|
|
|
Routing - Addressing | 4/9/2008 | | 4/9/2008 | | PASS |
April Wing
|
|
|
|