BLD-Final | 4/27/2009 | 4/28/2009 | 4/29/2009 | P | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####
|
BLD-Final | 4/28/2009 | 4/29/2009 | 4/29/2009 | A | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####
|
DOC - Permit Finaled | 4/29/2009 | 4/29/2009 | 4/29/2009 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 4/21/2009 | 4/22/2009 | 4/28/2009 | P | NR |
Tony Young
|
|
|
Scott Phone #: ###-#### need trades, etc
|
BLD-Grading Inspection | 4/24/2009 | 4/24/2009 | 4/24/2009 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Wall cover | 2/3/2009 | 2/4/2009 | 2/4/2009 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/3/2009 at 10:37:56 AM. Contact: ###-####. energy ok
|
BLD-Framing/Rough-in | 1/27/2009 | 1/28/2009 | 1/28/2009 | A | PART |
Tony Young
|
|
|
scott Phone #: ###-####ok to insulate,, need to justify how roof is vented or ?,, need shear blocks and nailing on exterior,,
|
BLD-Foundation | 10/20/2008 | 10/21/2008 | 10/21/2008 | A | PART |
Mike Jordan
|
|
|
ed - wall Phone #: ###-####. wip on stemwalls.
|
BLD-Footing | 10/17/2008 | 10/17/2008 | 10/17/2008 | P | PASS |
Tony Young
|
|
|
scott Phone #: ###-#### MAIN LEVEL FTGS OK
|
PubWorks Subgrade Approval | 10/13/2008 | 10/13/2008 | 10/13/2008 | | DONE |
Terry Records
|
|
|
Footing subgrade for upper level footings approved.
|
BLD-Footing | 10/10/2008 | 10/10/2008 | 10/10/2008 | P | PART |
Tony Young
|
|
|
mud scheduled between 1:30 & 2 ###-#### Scott poured,, looks ok,, upper section ftgs
|
BLD-Foundation | 9/22/2008 | 9/23/2008 | 9/23/2008 | A | PART |
Mike Jordan
|
|
|
BILL Phone #: ###-####. Concrete retaining wall. Also reveiwed aprroved engineering for change in vertical reinforcement to #5 at 7 inch oc. Tall portion if wall did remain with #8 vert. steel as per approved plans.
|
BLD-Footing | 9/9/2008 | 9/11/2008 | 9/11/2008 | A | PASS |
Jim Storey
|
|
|
ed Phone #: ###-#### back ft for retaining wall ok
|
BLD-Conference | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | PASS |
Tony Young
|
|
|
ed Phone #: ###-#### str. eng on site,, verbal ok as built from him,, wip
|
PubWorks Subgrade Approval | 9/9/2008 | 9/9/2008 | 9/9/2008 | | PART |
Terry Records
|
|
|
FOOTING SUBGRADE APPROVED BY THE GEOTECHNICAL ENGINEER
|
Issue PAID IN FULL permit | | | 9/4/2008 | | DONE |
|
|
|
|
Telephone call | | | 9/3/2008 | | DONE |
|
|
|
t/c w scott at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/3/2008 | | DONE |
|
|
|
|
Route to Impact Fee Review | 8/4/2008 | 8/7/2008 | 9/2/2008 | | PASS |
Cindy M. Gould
|
|
|
Impact fees offset by demo of prior existing house
|
Routing - PLAN CHECK | 8/8/2008 | | 9/2/2008 | | PASS |
Carl D Madsen
|
|
|
8/20/08 Called Scott Clark about second floor joist support on the left side of the master bedroom. There is no beam or supporting wall. The windows in bedroom #2 do not meet emergengy exit requirements, he had me redlien the two windows on the left side of the bedroom to show 2'6 x 3'0 casements. He will send over new sheets and calculations for second floor joist supports. CDM
|
Case Summary (BLD) | | | 9/2/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/2/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/2/2008 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 8/20/2008 | 8/20/2008 | 8/20/2008 | | DONE |
Carl D Madsen
|
|
|
|
Routing - FIRE | 8/7/2008 | | 8/8/2008 | | PASS |
Scott Arellano
|
|
|
This house will require a 13D fire sprinkler system, due to its location, which is in excess of FD access requirements (more than 150' from a fire access roadway (the public street) and more than 1.5 miles/4min response time from a fire station. (Unplated subdivision).
|
Routing - Erosion and Sediment | 8/6/2008 | | 8/7/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with attached conditions. ESC08-01684
|
Routing - PLANNING | 8/5/2008 | | 8/6/2008 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/4/2008 | | 8/5/2008 | | PASS |
Terry Records
|
|
|
Approved as category 3
|
Routing - PUBLIC WORKS | 8/5/2008 | | 8/5/2008 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/4/2008 | | 8/4/2008 | | PASS |
Chris Pichardo
|
|
|
|
Application received | | 8/4/2008 | | | |
|
|
|
|