Permit Information
Permit NumberBLD08-02445
StatusFinaled
Name VERTICAL CORP
Site Address 3123 S BOWN WY
Project NameEASTSIDE CYCLES 1ST STORY
Customer Number 
ePlanReviewNo
Description
(EASTSIDE CYCLES - 1ST STORY) The fire sprinkler system is used for code trade-offs, story increase, and for fire flow. To prepare a 1,090 square foot space located on the 1st story of a new building for a retail sales tenant. Work is to include a restroom accessible to the disabled, interior nonbearing walls, furred walls, millwork, and finishes. The roof top HVAC unit will be relocated from another area and placed on an existing curb. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  5/6/2010 DONE
t/c w todd at vertical const. regarding past due fees for final values - I faxed the billing statement to Todd at ###-####
Third Notice 7/21/20098/11/2009 DONE
Second Notice BLD3/3/20093/3/20097/21/2009 DONE
DetailsTisha Gallop
First Notice has not been responded to.
First Notice 1/21/20093/3/2009 DONE
BLD-Final1/19/20091/21/20091/21/2009PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/19/2009 at 10:50:27 AM. Contact: ###-####.
Permanent Occupancy  1/21/2009 DONE
DetailsBarbara Stitt
FIRE-Final Inspection1/16/20091/16/20091/16/2009PPASS
DetailsForrest France
Fire life safety inspection passed.
FIRE-Conference12/23/200812/24/200812/24/2008ADONE
DetailsForrest France
On site conference regarding project completion details.
BLD-Framing/Rough-in12/22/200812/23/200812/23/2008APASS
DetailsJim Storey
joe - please call 1/2 hr prior Phone #: ###-####
BLD-Framing/Rough-in12/19/200812/19/200812/19/2008PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2008 at 10:07:23 AM. Contact: ###-####.
Permit Ready to Issue  12/15/2008 DONE
DetailsRita DeYoung
CHANGE STATUS TO (RDY)  12/15/2008 DONE
Telephone call  12/15/2008 DONE
Called Richard permit ready to pick up and fee given Also need GC number
Issue PAID IN FULL permit  12/15/2008 DONE
Routing - PLAN CHECK12/10/2008 12/12/2008 PASS
DetailsCarl Westfall
Completed the resubmittal review. Drawings approved.
Routing - PUBLIC WORKS12/12/2008 12/12/2008 PASS
DetailsLouise Waldorf
Drinking fountains added.
PLANS/APPL TAKEN TO FRONT DESK  12/12/2008 DONE
Print Occupancy Form  12/12/2008 DONE
Plan assigned to (CJW)11/20/2008 12/12/2008 PASS
DetailsCarl Westfall
12/12/2008 13:23:11 CJW - activity updated through activity BLDA022 from case BLD08-02445.
Routing - FIRE12/5/200812/5/200812/10/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan resubmittals received  12/10/2008  
DetailsBarbara Stitt
Received 1 cover transmittal, 1 response letter to Carl Westfall dated 12-8-08 from Taryn Wheeler, 2 copie sof sheets A6.11 & A2.11 and taken to Carl Westfall's desk 12-10-08 @ 10:25am BAS
1st review completed  12/10/2008 FAIL
Failed Plan Check
Route to Impact Fee Review12/5/200812/10/200812/5/2008 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK11/21/2008 12/5/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on December 3, 2008 and was finished on December 5, 2008. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS11/20/2008 11/21/2008  
Pending Assignment by JCB11/19/2008 11/20/2008 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  11/19/2008  
Recd Pcfee & Taken To Pln CK  11/19/2008  
Plan assigned to (JCB)11/19/2008 11/19/2008 DONE
DetailsJason Blais
Plan assigned to Carl Westfall.
Application received 11/18/2008