Permanent Occupancy | | | 4/8/2009 | | DONE |
|
|
|
|
BLD-Final | 4/3/2009 | 4/7/2009 | 4/7/2009 | A | PASS |
Dave Hannah
|
|
|
###-#### MOONS Derek Phone #: ###-#### ok for perm occ
|
Telephone call | | | 3/31/2009 | | DONE |
|
|
|
Called left message for Bob to call me about temp occ card. 8:50
|
BLD-Final | 12/22/2008 | 12/24/2008 | 12/30/2008 | P | CANC |
Dave Hannah
|
|
|
Bob Please call first to see if CDH has been by Phone #: ###-####
|
BLD-Final | 12/26/2008 | 12/26/2008 | 12/26/2008 | P | PART |
Dave Hannah
|
|
|
ok for temp occ
|
FIRE-Final Inspection | 12/26/2008 | 12/26/2008 | 12/26/2008 | P | PASS |
Forrest France
|
|
|
C/N items verified for compliance, fire life safety inspection passed.
|
Temporary Occupancy UNPAID FEE | | | 12/26/2008 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/22/2008 | 12/24/2008 | 12/24/2008 | P | PASS |
Forrest France
|
|
|
See inspection completed per S. Arellano.
|
FIRE-Conference | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | DONE |
Forrest France
|
|
|
On site conference regarding building fire life safety requirements, need to provide verification of a current annual certification for the existing fire sprinkler system.
|
Print Occupancy Form | | | 12/22/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/22/2008 | | DONE |
Cathy Brown
|
|
|
tlk to bob dempsey ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 12/22/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/22/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/22/2008 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/19/2008 | | |
Darla L Downs
|
|
|
|
Plan assigned to (TLW) | 12/19/2008 | | 12/19/2008 | | PASS |
Tim L. Woodard
|
|
|
12/19/2008 16:43:28 TLW - activity updated through activity BLDA022 from case BLD08-02545.
|
Routing - PLAN CHECK | 12/19/2008 | | 12/19/2008 | | PASS |
Tim L. Woodard
|
|
|
Refer to Case summary for conditions of approval. TLW
|
Routing - PUBLIC WORKS | 12/19/2008 | | 12/19/2008 | | PASS |
Louise Waldorf
|
|
|
|
Case Summary (BLD) | | | 12/19/2008 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 12/19/2008 | | 12/19/2008 | | PASS |
Walt Baumgartner
|
|
|
Moons Kitchen operation subject to Fat/Oil/Grease Best Management Practices requirements. Existing passive 30 lb in floor grease trap shall be cleaned weekly, a written cleaning log maintained available to Pretreatment inspectors upon request. An upgrade to the current grease abatement will be required if planned kitchen opertions exceed capacity of the trap. Call ###-#### for more information.
|
1st review completed | | | 12/19/2008 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2008 | | DONE |
|
|
|
|
Application received | | 12/11/2008 | 12/11/2008 | | DONE |
Darla L Downs
|
|
|
|
First Notice | | 4/8/2009 | | | |
|
|
|
|