Telephone call | | | 1/26/2010 | | DONE |
Tisha Gallop
|
|
|
called Cecyl/EKC and told her still need Mariott Lobby FV, she said is working on it right now. Told her will need w/in 2 wks or EKC on hold. Also told her still looking for FV on other 3 permits and on 2nd third notice there, she said those are Link's and she will give the notices to him when received.
|
Third Notice | | 12/29/2009 | 12/29/2009 | | DONE |
|
|
|
faxed and called
|
Telephone call | | | 12/29/2009 | | DONE |
Tisha Gallop
|
|
|
spoke to Cecyl, she said is shorthanded is why so late and just last week finished final billing on this project so is working on final values and will get it to me as soon as possible.
|
Third Notice | | 12/9/2009 | 12/16/2009 | | DONE |
|
|
|
faxed, mailed and called
|
Telephone call | | | 12/16/2009 | | DONE |
Tisha Gallop
|
|
|
left vm in general mailbox need fv
|
Third Notice | | 11/14/2009 | 11/25/2009 | | DONE |
|
|
|
faxed
|
Second Notice | | 10/26/2009 | 11/4/2009 | | DONE |
|
|
|
|
First Notice | | 10/5/2009 | 10/16/2009 | | DONE |
|
|
|
|
BLD-Final | 9/24/2009 | 9/25/2009 | 9/25/2009 | P | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-#### ok for perm occ
|
Permanent Occupancy | | | 9/25/2009 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 9/24/2009 | 9/24/2009 | 9/24/2009 | P | PASS |
Forrest France
|
|
|
Fire life safety final approved, all corrections completed.
|
FIRE-Final Inspection | 9/23/2009 | 9/23/2009 | 9/24/2009 | P | PART |
Forrest France
|
|
|
Final pending project related fire alarm permit, remainder of C/N items are finished.
|
Zoning Approval | 9/23/2009 | 9/23/2009 | 9/23/2009 | | PASS |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 9/21/2009 | 9/22/2009 | 9/22/2009 | A | FAIL |
Forrest France
|
|
|
Project related fire alarm permit needs requested for inspection and approval prior to building life safety, repair two exit signs at the main entry/exit doors north and south, provide missing fire extinguisher and post as discussed, repair door closure at the north set of fire doors, sprinkler coverage at the reception area is obstructed.
|
FIRE-Final Inspection | 9/14/2009 | 9/14/2009 | 9/14/2009 | A | NR |
Forrest France
|
|
|
Pending project related FIR permit finals.
|
BLD-Framing/Rough-in | 9/9/2009 | 9/10/2009 | 9/11/2009 | P | PASS |
Dave Hannah
|
|
|
rick - ceiling Phone #: ###-####
|
BLD-Other | 8/27/2009 | 8/28/2009 | 8/28/2009 | P | PASS |
Dave Hannah
|
|
|
Rick- ceiling- call 30 mins prior to going for access Phone #: ###-#### ok to cover ceiling
|
BLD-Framing/Rough-in | 7/23/2009 | 7/24/2009 | 7/24/2009 | P | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
BLD-Conference | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-#### looked over plans talked about wall ratings
|
Issue PAID IN FULL permit | | | 5/15/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/24/2009 | | DONE |
|
|
|
|
Telephone call | | | 4/24/2009 | | DONE |
|
|
|
left vm for wade at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 4/24/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/10/2009 | | 4/23/2009 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 4/10/2009 | | 4/23/2009 | | PASS |
Tim L. Woodard
|
|
|
4/23/2009 16:03:19 TLW - activity updated through activity BLDA022 from case BLD09-00468.
|
Routing - FIRE | | | 4/23/2009 | | PASS |
Tim L. Woodard
|
|
|
All fire sprinkler and alarm modifications must be permitted separatly through the fire dept. Field Verify Fire Dept. requirements. TLW
|
1st review completed | | | 4/23/2009 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2009 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/23/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 4/21/2009 | | DONE |
|
|
|
received 1 interior finish index,and 1 interior renovations lobby taken to Tim W.
|
Recd Pcfee & Taken To Pln CK | | | 4/10/2009 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 4/10/2009 | | 4/10/2009 | | PASS |
Beverly Hall
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/10/2009 | | |
|
|
|
I could not find (Gegory Martino or Rodrick Roche) both engineers in the Idhao Bureau of Licenses./// DLD
|
Application received | | 4/9/2009 | | | |
|
|
|
|