BLD-Final | 1/13/2010 | 1/14/2010 | 1/14/2010 | A | PASS |
Tom Arcoraci
|
|
|
Jesse ###-####//please call 20 min prior
|
Permanent Occupancy | | | 1/14/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/28/2009 | 12/29/2009 | 12/29/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 12/28/2009 | 12/29/2009 | 12/28/2009 | A | CANC |
Troy Cobbley
|
|
|
jesse Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
FIRE-Final Inspection | 12/17/2009 | 12/18/2009 | 12/18/2009 | A | CANC |
Troy Cobbley
|
|
|
Still waiting for Dixie to ok the engineering report and the two deads bolts to be removed from the inactive leaf of the main exit door. I spoke to Jessie via phone and she stated that they should be done by next thursday.
|
FIRE-Final Inspection | 12/16/2009 | 12/17/2009 | 12/17/2009 | P | FAIL |
Troy Cobbley
|
|
|
all itmes have been corrected except an engineering report is needed for the grease duct per Dixie. This may effect the hood suppresion system.
|
FIRE-Final Inspection | 12/16/2009 | 12/16/2009 | 12/16/2009 | P | FAIL |
Troy Cobbley
|
|
|
Provide modified occupant load sign, repair exit light and remove dead bolts from the main exit door.
|
FIRE-Final Inspection | 12/16/2009 | 12/16/2009 | 12/16/2009 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
FIRE-Alarm Testing | 12/11/2009 | 12/11/2009 | 12/11/2009 | P | DONE |
Troy Cobbley
|
|
|
Inspection was for the hood suppression system. The hood suppression system contractor is installing the non-combustible separation between the fryer and the two burner appliance as well as the full height non-combustible separation at the right hand side/west end of the hood. The manual pull station was blocked by a movable table which the owner agreed to move. These items will be verified at the life safety final.
|
Issue PAID IN FULL permit | | | 12/4/2009 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 12/4/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 11/30/2009 | 11/30/2009 | 12/3/2009 | | PASS |
Carl D Madsen
|
|
|
12/3/2009 14:27:56 CDM - activity updated through activity BLDA022 from case BLD09-02120.
|
Routing - PLAN CHECK | 11/30/2009 | | 12/3/2009 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 12/3/2009 | | DONE |
Carl D Madsen
|
|
|
|
1st review completed | | | 12/3/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2009 | | |
|
|
|
|
Print Occupancy Form | | | 12/3/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/3/2009 | | |
|
|
|
|
Telephone call | | | 12/3/2009 | | DONE |
|
|
|
called Yesenia permit ready ///dld 12-3-09
|
Routing - PUBLIC WORKS | 11/30/2009 | | 11/30/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/30/2009 | | 11/30/2009 | | PASS |
April Wing
|
|
|
|
Routing PW Sewer Design | 11/30/2009 | | 11/30/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 11/30/2009 | | 11/30/2009 | | PASS |
Walt Baumgartner
|
|
|
Contact Bench Sewer District Pretreatment office for info on required grease abatement - ###-#### Rick Christenson
|
Plans ACCEPTED BY PLAN TECH | | | 11/27/2009 | | DONE |
|
|
|
|
Application received | | 11/27/2009 | | | |
|
|
|
|