DOC - Permit Expired | 10/11/2010 | 10/11/2010 | 10/11/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/6/2010 | 10/6/2010 | 10/11/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/6/2010 | 7/6/2010 | 7/6/2010 | | PASS |
Dave Hannah
|
|
|
exps on 08/11/10
|
Routing Walk-In (Zoning) | 2/12/2010 | 2/12/2010 | 2/12/2010 | P | PASS |
Jennifer Tomlinson
|
|
|
2/12/2010 14:42:07 J_T - activity updated through activity BLDI252 from case BLD10-00289.
For patio on western side of property,measure 5 foot setback to property line-no building or structure is allowed in the sideyard setback. Post can be located 5 feet from property line, eave can encroach in setback 2 feet.
|
Routing Walk-In (BLD) | 2/12/2010 | 2/12/2010 | 2/12/2010 | P | DONE |
Carl D Madsen
|
|
|
2/12/2010 16:09:15 CDM - activity updated through activity BLDA022 from case BLD10-00289.
|
Plan assigned to (CDM) | 2/12/2010 | 2/12/2010 | 2/12/2010 | | DONE |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 2/12/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/12/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2010 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 2/12/2010 | | | |
|
|
|
|