DOC - Permit Finaled | | | 11/21/2011 | | DONE |
Tisha Gallop
|
|
|
passed all inspections
|
Letter of compliance/Occupancy | | | 11/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 11/9/2011 | 11/15/2011 | 11/15/2011 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/4/2011 | 11/4/2011 | 11/9/2011 | P | PART |
Dave Hannah
|
|
|
everything ok but needs plumbing final
|
FIRE-Final Inspection | 11/4/2011 | 11/4/2011 | 11/4/2011 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Second floor work is complete.
|
FIRE-Final Inspection | 11/3/2011 | 11/3/2011 | 11/3/2011 | P | FAIL |
Troy Cobbley
|
|
|
Contractor did not have the city approved plans. No inspection performed
|
BLD-Framing/Rough-in | 9/1/2011 | 9/1/2011 | 9/2/2011 | P | PART |
Dave Hannah
|
|
|
rooms ok need more detail on hard lid in common area.
|
BLD-Conference | 8/22/2011 | 8/22/2011 | 8/22/2011 | P | PART |
Dave Hannah
|
|
|
bldg 5 level 2 e club ph 1 walls and soffits ok
|
BLD-Conference | 6/3/2011 | 6/3/2011 | 6/3/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/4/2011 | 3/4/2011 | 3/7/2011 | A | PART |
Dave Hannah
|
|
|
ok to occ rooms on first floor and east end of second floor
|
FIRE-Final Inspection | 3/4/2011 | 3/4/2011 | 3/4/2011 | A | PART |
Forrest France
|
|
|
Fire life safety inspection completed acceptable for the first floor east B5 and west B5 lower focus rooms- also to include the east BU 2nd floor upper focus rooms. Note: upper center link focus rooms and break room not yet completed.
|
BLD-Conference | 3/3/2011 | 3/3/2011 | 3/4/2011 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 2/15/2011 | 2/15/2011 | 2/15/2011 | P | PART |
Jim Sly
|
|
|
gene - ceiling grid for cover Phone #: ###-#### Grid....Upper East.....Bldg 5 4 focus rooms and 1 hallway
|
BLD-Framing/Rough-in | 1/20/2011 | 1/21/2011 | 1/21/2011 | A | PASS |
Jim Sly
|
|
|
gene - ceiling grid and framing Phone #: ###-#### Bldg #5 Frame OK....Ceilings in (2) focus rooms...OK.
|
BLD-Framing/Rough-in | 12/6/2010 | 12/7/2010 | 12/7/2010 | P | PART |
Jim Sly
|
|
|
Gene Phone #: ###-#### Rooms 501 thru 507......OK
|
Issue PAID IN FULL permit | | | 10/21/2010 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 10/19/2010 | | |
|
|
|
|
Telephone call | | | 10/19/2010 | | DONE |
|
|
|
10-19-10 called left message permit ready and fee given ///dld
|
Intake Approval | | | 10/19/2010 | | PASS |
|
|
|
|
Plan assigned to (CDM) | 10/11/2010 | 10/11/2010 | 10/18/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/11/2010 | | 10/18/2010 | | PASS |
Carl D Madsen
|
|
|
Carl Madsen
|
Routing - FIRE | | | 10/18/2010 | | PASS |
|
|
|
Verify in field CDM
|
1st review completed | | | 10/18/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2010 | | |
|
|
|
|
Case Summary (BLD) | | | 10/18/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2010 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 10/11/2010 | 10/11/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/11/2010 | | DONE |
Barbara Stitt
|
|
|
|