Information based on query as of Thursday, September 26, 2024.
Permit Information
Permit NumberBLD11-00136
StatusFinaled
Name COMAN HOMES OF IDAHO INC
Site Address 548 E CLUBVIEW DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3,745 sq. ft., two story (first story 2,457 sq. ft., second story 1,288 sq. ft.) single family dwelling with 4 bedrooms, 3 1/2 bathrooms, approximately 730 sq. ft. of covered patio/porch and a 1,152 sq. ft. attached garage per the approved plans, plan review report and any notations. This structure is located in WUI zone A requiring noncombustible siding, class A roofing material and one hour soffits. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. The galss gaurd and handrail system has not been approved as part of this permit and a deferred submittal is being allowed with the designer to provide the required engineering to the building department for review prior to installation. A-1 zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/15/201112/15/201112/15/2011PPASS
DetailsTony Young
greg Phone #: ###-####,, status ck,, final ok now
DOC - Permit Finaled12/15/201112/15/201112/15/2011PPASS
DetailsTony Young
c of o issued
DOC - Permit Finaled12/15/201112/15/201112/15/2011PPASS
DetailsTony Young
c of o issued
BLD-Conference12/14/201112/15/201112/15/2011APASS
DetailsTony Young
greg Phone #: ###-####,, status ck,,, calcs given to plan review,, scaned into documents,,, ok per plan review
BLD-Final12/9/201112/12/201112/14/2011ANR
DetailsTony Young
greg Phone #: ###-####,, need glass guardrail engineering
BLD-Conference12/13/201112/14/201112/14/2011APEND
DetailsTony Young
greg Phone #: ###-####,, status ck,,, still working on calcs,,, should have by thursday the 15th,, per Greg
BLD-Final12/8/201112/9/201112/12/2011PFAIL
DetailsTony Young
greg Phone #: ###-####,, need engineering
BLD-Final12/8/201112/8/201112/9/2011PPART
DetailsTony Young
greg Phone #: ###-####,, all ok except need the engineer approval on the glass guardrail
BLD-Final12/6/201112/6/201112/7/2011PFAIL
DetailsTony Young
greg Phone #: ###-####,, correction posted,, need glass guardrail approval from plan review,, address visible from road,, tempered glass etc,,
BLD-Grading Inspection11/29/201111/29/201111/29/2011ADONE
DetailsTerry Records
Final grading and drainage approved
Routing - MECHANICAL10/7/2011 10/7/2011 PASS
DetailsTroy James
Telephone call  10/7/2011 DONE
emailed A1 heating resubmitted plans at permit counter
Plan resubmittals received  9/28/2011 DONE
resubmitted new manual J
Routing - MECHANICAL9/28/2011 9/28/2011 FAIL
DetailsTroy James
new resubmittal manual j, emailed A1 heating with correction
BLD-Energy code compliance6/8/20116/9/20116/9/2011APASS
DetailsTony Young
Greg Phone #: ###-####
BLD-Framing/Rough-in6/2/20116/2/20116/2/2011PPASS
DetailsJim Storey
Greg Phone #: ###-####
Plan resubmittals received  6/1/2011 PASS
manual j resubmittal by A1 heating
Telephone call  6/1/2011 PASS
called greg coman to pick up manual j calcs
Routing Walk-In (BLD)5/18/20115/18/20115/18/2011PPASS
DetailsPerry Paine
received fire treat documents
BLD-Framing/Rough-in4/11/20114/12/20114/12/2011APART
DetailsTony Young
greg Phone #: ###-####,, ext. shear ok
BLD-Foundation3/8/20113/9/20113/10/2011APART
DetailsTony Young
cal Phone #: ###-####
BLD-Foundation3/8/20113/8/20113/10/2011PPART
DetailsTony Young
cal Phone #: ###-####
BLD-Foundation3/4/20113/7/20113/9/2011PPART
DetailsTony Young
Cal Phone #: ###-####
BLD-Foundation3/3/20113/4/20113/4/2011ANR
DetailsTony Young
CAL Phone #: ###-####
BLD-Footing3/2/20113/3/20113/3/2011APASS
DetailsTony Young
CAL Phone #: ###-####
PubWorks Subgrade Approval3/3/20113/3/20113/3/2011 DONE
DetailsTerry Records
Footing subgrade approved by the geotechnical engineer with qualifications. Two soft spots were found. One was remediated and pproved by MTI, one was in an area that the contractor indicated was in the crawl space and would not have any structural elements bearing on it. See the attached approval letter.
Issue PAID IN FULL permit  2/25/2011 DONE
DetailsChristina Prado
Plan assigned to (CDM)1/25/20111/25/20112/24/2011 DONE
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  2/24/2011  
Inspection Record Card- Bld  2/24/2011 DONE
DetailsTisha Gallop
Permit Ready to Issue  2/24/2011 DONE
DetailsTisha Gallop
Telephone call  2/24/2011 DONE
DetailsTisha Gallop
called Greg Coman and told him permit is ready and fees.
Routing - PLANNING2/23/2011 2/23/2011 PASS
DetailsSue Cummings
Routing - FIRE2/23/2011 2/23/2011 PASS
DetailsTim Frost
Approval is contingent upon providing roadway per Briggs Engineering, Inc. letter address to Trey Hoff Architecture with received date of 02-22-11. Roadway 20' wide capable of supporting 74000 fire truck per IFC.
Routing - PLAN CHECK2/23/2011 2/23/2011 PASS
DetailsCarl D Madsen
Case Summary (BLD)  2/23/2011 DONE
Plan resubmittals received  2/22/2011  
DetailsBarbara Stitt
1 response letter from Dean Briggs, 1 8 1/2 x 11 site plan, 3 copies of res check, 2 copies of sheet A-1.1, 2 copies of sheet A-3.1, A-3.2, E-1.1, E-2.1, 2 copies of sheets S-1.1, S-2.1, S-2.2, S-3.1, S-4.1, S-4.2 And taken to Carl Madsen
Routing - MECHANICAL2/7/2011 2/18/2011 PASS
DetailsTroy James
Routing Walk-In (BLD)2/17/20112/17/20112/17/2011ACANC
DetailsPerry Paine
2-17-2011 Mr. Coman with questions about the problem with the mechanical contractor and mechanical plan review. Stated that his mechanical "Western Heating" contractor has backed out of the project as they cannot get the proper results on the manual J and D. He stated that he will go to A-1 heating hoping to get better results. 2-17-2011 pep
1st review completed  2/17/2011 FAIL
Additional information is required from the Architect. Called Trey Hoff and requested resubmittals CDM 2-17-10
Routing - PLAN CHECK  2/17/2011 FAIL
DetailsCarl D Madsen
Routing - FIRE2/8/2011 2/10/2011 FAIL
DetailsTim Frost
Failed – Please, see the following code excerpt
------------
IFC: 503.1.1 Buildings and facilities.
Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility.
------------
The proposed project does not comply with IFC:503.1.1. There are two alternatives. Provide a fire department vehicle access road that complies with IFC: Appendix D or provide an automatic sprinkler system that complies with NFPA 13D. For further information, contact the Boise City Fire Marshal Mr. Ron Amandus @ ###-####
Routing - Erosion and Sediment1/7/2011 2/8/2011 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC11-00038
Route to Impact Fee Review1/25/20111/28/20112/2/2011 PASS
DetailsCindy M. Gould
Routing - PLANNING2/1/2011 2/1/2011 PASS
DetailsSue Cummings
Property located in the Foothills WUI zone. Must comply with defencible landscape requirements.
Routing - PUBLIC WORKS  2/1/2011 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside  1/31/2011 PASS
DetailsTerry Records
Routing - Addressing1/25/2011 1/31/2011 PASS
DetailsTerry Records
Application received 1/24/20111/25/2011 DONE
DetailsTisha Gallop
Intake Approval  1/25/2011 PASS
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  1/25/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  1/25/2011 DONE
DetailsTisha Gallop
Routing - MECHANICAL2/1/2011   FAIL
DetailsTroy James
Routing - PLAN CHECK2/18/2011