BLD-Final | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | PASS |
Tony Young
|
|
|
greg Phone #: ###-####,, status ck,, final ok now
|
DOC - Permit Finaled | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | PASS |
Tony Young
|
|
|
c of o issued
|
DOC - Permit Finaled | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Conference | 12/14/2011 | 12/15/2011 | 12/15/2011 | A | PASS |
Tony Young
|
|
|
greg Phone #: ###-####,, status ck,,, calcs given to plan review,, scaned into documents,,, ok per plan review
|
BLD-Final | 12/9/2011 | 12/12/2011 | 12/14/2011 | A | NR |
Tony Young
|
|
|
greg Phone #: ###-####,, need glass guardrail engineering
|
BLD-Conference | 12/13/2011 | 12/14/2011 | 12/14/2011 | A | PEND |
Tony Young
|
|
|
greg Phone #: ###-####,, status ck,,, still working on calcs,,, should have by thursday the 15th,, per Greg
|
BLD-Final | 12/8/2011 | 12/9/2011 | 12/12/2011 | P | FAIL |
Tony Young
|
|
|
greg Phone #: ###-####,, need engineering
|
BLD-Final | 12/8/2011 | 12/8/2011 | 12/9/2011 | P | PART |
Tony Young
|
|
|
greg Phone #: ###-####,, all ok except need the engineer approval on the glass guardrail
|
BLD-Final | 12/6/2011 | 12/6/2011 | 12/7/2011 | P | FAIL |
Tony Young
|
|
|
greg Phone #: ###-####,, correction posted,, need glass guardrail approval from plan review,, address visible from road,, tempered glass etc,,
|
BLD-Grading Inspection | 11/29/2011 | 11/29/2011 | 11/29/2011 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
Routing - MECHANICAL | 10/7/2011 | | 10/7/2011 | | PASS |
Troy James
|
|
|
|
Telephone call | | | 10/7/2011 | | DONE |
|
|
|
emailed A1 heating resubmitted plans at permit counter
|
Plan resubmittals received | | | 9/28/2011 | | DONE |
|
|
|
resubmitted new manual J
|
Routing - MECHANICAL | 9/28/2011 | | 9/28/2011 | | FAIL |
Troy James
|
|
|
new resubmittal manual j, emailed A1 heating with correction
|
BLD-Energy code compliance | 6/8/2011 | 6/9/2011 | 6/9/2011 | A | PASS |
Tony Young
|
|
|
Greg Phone #: ###-####
|
BLD-Framing/Rough-in | 6/2/2011 | 6/2/2011 | 6/2/2011 | P | PASS |
Jim Storey
|
|
|
Greg Phone #: ###-####
|
Plan resubmittals received | | | 6/1/2011 | | PASS |
|
|
|
manual j resubmittal by A1 heating
|
Telephone call | | | 6/1/2011 | | PASS |
|
|
|
called greg coman to pick up manual j calcs
|
Routing Walk-In (BLD) | 5/18/2011 | 5/18/2011 | 5/18/2011 | P | PASS |
Perry Paine
|
|
|
received fire treat documents
|
BLD-Framing/Rough-in | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | PART |
Tony Young
|
|
|
greg Phone #: ###-####,, ext. shear ok
|
BLD-Foundation | 3/8/2011 | 3/9/2011 | 3/10/2011 | A | PART |
Tony Young
|
|
|
cal Phone #: ###-####
|
BLD-Foundation | 3/8/2011 | 3/8/2011 | 3/10/2011 | P | PART |
Tony Young
|
|
|
cal Phone #: ###-####
|
BLD-Foundation | 3/4/2011 | 3/7/2011 | 3/9/2011 | P | PART |
Tony Young
|
|
|
Cal Phone #: ###-####
|
BLD-Foundation | 3/3/2011 | 3/4/2011 | 3/4/2011 | A | NR |
Tony Young
|
|
|
CAL Phone #: ###-####
|
BLD-Footing | 3/2/2011 | 3/3/2011 | 3/3/2011 | A | PASS |
Tony Young
|
|
|
CAL Phone #: ###-####
|
PubWorks Subgrade Approval | 3/3/2011 | 3/3/2011 | 3/3/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer with qualifications. Two soft spots were found. One was remediated and pproved by MTI, one was in an area that the contractor indicated was in the crawl space and would not have any structural elements bearing on it. See the attached approval letter.
|
Issue PAID IN FULL permit | | | 2/25/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | 1/25/2011 | 1/25/2011 | 2/24/2011 | | DONE |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/24/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 2/24/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/24/2011 | | DONE |
Tisha Gallop
|
|
|
called Greg Coman and told him permit is ready and fees.
|
Routing - PLANNING | 2/23/2011 | | 2/23/2011 | | PASS |
Sue Cummings
|
|
|
|
Routing - FIRE | 2/23/2011 | | 2/23/2011 | | PASS |
Tim Frost
|
|
|
Approval is contingent upon providing roadway per Briggs Engineering, Inc. letter address to Trey Hoff Architecture with received date of 02-22-11. Roadway 20' wide capable of supporting 74000 fire truck per IFC.
|
Routing - PLAN CHECK | 2/23/2011 | | 2/23/2011 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 2/23/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/22/2011 | | |
Barbara Stitt
|
|
|
1 response letter from Dean Briggs, 1 8 1/2 x 11 site plan, 3 copies of res check, 2 copies of sheet A-1.1, 2 copies of sheet A-3.1, A-3.2, E-1.1, E-2.1, 2 copies of sheets S-1.1, S-2.1, S-2.2, S-3.1, S-4.1, S-4.2 And taken to Carl Madsen
|
Routing - MECHANICAL | 2/7/2011 | | 2/18/2011 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (BLD) | 2/17/2011 | 2/17/2011 | 2/17/2011 | A | CANC |
Perry Paine
|
|
|
2-17-2011 Mr. Coman with questions about the problem with the mechanical contractor and mechanical plan review. Stated that his mechanical "Western Heating" contractor has backed out of the project as they cannot get the proper results on the manual J and D. He stated that he will go to A-1 heating hoping to get better results. 2-17-2011 pep
|
1st review completed | | | 2/17/2011 | | FAIL |
|
|
|
Additional information is required from the Architect. Called Trey Hoff and requested resubmittals CDM 2-17-10
|
Routing - PLAN CHECK | | | 2/17/2011 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 2/8/2011 | | 2/10/2011 | | FAIL |
Tim Frost
|
|
|
Failed – Please, see the following code excerpt
------------
IFC: 503.1.1 Buildings and facilities.
Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility.
------------
The proposed project does not comply with IFC:503.1.1. There are two alternatives. Provide a fire department vehicle access road that complies with IFC: Appendix D or provide an automatic sprinkler system that complies with NFPA 13D. For further information, contact the Boise City Fire Marshal Mr. Ron Amandus @ ###-####
|
Routing - Erosion and Sediment | 1/7/2011 | | 2/8/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC11-00038
|
Route to Impact Fee Review | 1/25/2011 | 1/28/2011 | 2/2/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 2/1/2011 | | 2/1/2011 | | PASS |
Sue Cummings
|
|
|
Property located in the Foothills WUI zone. Must comply with defencible landscape requirements.
|
Routing - PUBLIC WORKS | | | 2/1/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 1/31/2011 | | PASS |
Terry Records
|
|
|
|
Routing - Addressing | 1/25/2011 | | 1/31/2011 | | PASS |
Terry Records
|
|
|
|
Application received | | 1/24/2011 | 1/25/2011 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 1/25/2011 | | PASS |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/25/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/25/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 2/1/2011 | | | | FAIL |
Troy James
|
|
|
|
Routing - PLAN CHECK | 2/18/2011 | | | | |
|
|
|
|