BLD-Final | 9/30/2013 | 10/2/2013 | 10/2/2013 | A | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 10/2/2013 | 10/2/2013 | 10/2/2013 | P | PASS |
Jim Sly
|
|
|
Contr. did not return call or call for final insp.
|
BLD-Aging Inspection | 9/26/2013 | 9/30/2013 | 9/30/2013 | A | PEND |
Jim Sly
|
|
|
Called contr....... left V/M Need to call for structural final.
|
BLD-Energy code compliance | 8/16/2011 | 8/16/2011 | 8/17/2011 | P | PART |
Jim Sly
|
|
|
ED Phone #: ###-#### OK to cover North room.
|
BLD-Framing/Rough-in | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | PART |
Jim Sly
|
|
|
and energy code inspection please-Ed Phone #: ###-#### Garage only Frame and Energy OK.
|
BLD-Footing | 7/11/2011 | 7/11/2011 | 7/11/2011 | P | PASS |
Jim Sly
|
|
|
ed Phone #: ###-####
|
BLD-Foundation | 5/12/2011 | 5/12/2011 | 5/13/2011 | P | PASS |
Jim Sly
|
|
|
foundation wall insp//Mark Phone #: ###-####
|
BLD-Footing | 5/9/2011 | 5/10/2011 | 5/10/2011 | A | PART |
Jim Sly
|
|
|
ed - late morning please Phone #: ###-#### 2 #4's and #4 verts at 24" oc in footing...setbacks appear ok.....Contr to call for wall insp.
|
Routing Walk-In (PW Hillside) | 5/2/2011 | 5/2/2011 | 5/2/2011 | A | PASS |
Terry Records
|
|
|
No hillside grading plan or geotechnical report required by Public Works
|
Routing Walk-In (Zoning) | 5/2/2011 | 5/2/2011 | 5/2/2011 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/2/2011 | 5/2/2011 | 5/2/2011 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (DLD) Darla | 5/2/2011 | 5/2/2011 | 5/2/2011 | | PASS |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 5/2/2011 | 5/2/2011 | 5/2/2011 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 5/2/2011 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/2/2011 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/2/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/2/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2011 | | |
|
|
|
|
Application received | | 5/2/2011 | | | |
|
|
|
|