Permanent Occupancy | | | 6/27/2011 | | DONE |
|
|
|
|
BLD-Final | 6/17/2011 | 6/23/2011 | 6/23/2011 | P | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
FIRE-Final Inspection | 6/22/2011 | 6/23/2011 | 6/23/2011 | A | PASS |
Forrest France
|
|
|
Noted correction item verified for compliance. Life safety passed.
|
FIRE-Final Inspection | 6/17/2011 | 6/22/2011 | 6/22/2011 | A | FAIL |
Forrest France
|
|
|
Need to remove manual thumbturn at the main entry/exit door and provide keyed lock as discussed.
|
Issue PAID IN FULL permit | | | 6/17/2011 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/9/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 6/9/2011 | | 6/9/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/9/2011 | | 6/9/2011 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 6/9/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/9/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 6/9/2011 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 6/9/2011 | | DONE |
Christina Prado
|
|
|
Called Cindy to let know permit is ready and we need signature on application
|
Permit Ready to Issue | | | 6/9/2011 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 7/7/2011 | | | |
|
|
|
|
Application received | | 6/1/2011 | | | |
|
|
|
|