First Notice | | 11/24/2011 | 11/15/2011 | | DONE |
Christina Prado
|
|
|
done
|
Print Occupancy Form | | | 11/14/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/14/2011 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 11/4/2011 | 11/4/2011 | 11/4/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/3/2011 | 11/3/2011 | 11/3/2011 | P | NR |
Jim Sly
|
|
|
Trent Phone #: ###-#### Need Electr final.
|
BLD-Final | 11/3/2011 | 11/3/2011 | 11/3/2011 | P | CANC |
Jim Sly
|
|
|
Trent Phone #: ###-####
|
FIRE-Final Inspection | 11/3/2011 | 11/3/2011 | 11/3/2011 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection.
|
FIRE-Final Inspection | 11/3/2011 | 11/3/2011 | 11/3/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Conference | 8/30/2011 | 8/30/2011 | 8/31/2011 | P | PART |
Dave Hannah
|
|
|
ceiling grid ok after elec oks
|
BLD-Framing/Rough-in | 7/21/2011 | 7/21/2011 | 7/21/2011 | P | PASS |
Tom Arcoraci
|
|
|
Jason Phone #: ###-#### batroom and lobby ok
|
FIRE-Sprinkler Rough-in | 7/19/2011 | 7/19/2011 | 7/19/2011 | P | PART |
Forrest France
|
|
|
Pendent heads at the restroom ceilings okayed prior to cover.
|
BLD-Framing/Rough-in | 7/6/2011 | 7/6/2011 | 7/6/2011 | P | PART |
Jim Sly
|
|
|
jason Phone #: ###-#### OK to cover 4 conference rooms at North end of project. Architect to verify ceiling above 1hr.....and if so how to fix holes ect. left by removal of equipment. Talked to superintendent at site. (no holes in ceiling located above new hard ceiling in conf rooms).
|
Permit Ready to Issue | | | 6/10/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/10/2011 | | DONE |
Tisha Gallop
|
|
|
called Dan Hayes/HC Co. and left vm permit is ready and fees.
|
Issue PAID IN FULL permit | | | 6/10/2011 | | DONE |
|
|
|
|
Plan assigned to (425) | 6/8/2011 | 6/8/2011 | 6/9/2011 | | PASS |
Dave Hannah
|
|
|
|
Routing - PLAN CHECK | 6/9/2011 | | 6/9/2011 | | PASS |
Dave Hannah
|
|
|
|
Case Summary (BLD) | | | 6/9/2011 | | DONE |
|
|
|
|
Routing - PLUMBING | 6/9/2011 | | 6/9/2011 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2011 | | |
|
|
|
|
Print Occupancy Form | | | 6/9/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 6/2/2011 | 6/8/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/8/2011 | | DONE |
Tisha Gallop
|
|
|
ok per Dave Hannah
|
Recd Pcfee & Taken To Pln CK | | | 6/8/2011 | | DONE |
Tisha Gallop
|
|
|
|