First Notice | | 12/26/2011 | 1/3/2012 | | DONE |
Christina Prado
|
|
|
Done 12-16-11, see attached final certificate
|
BLD-Final | 12/14/2011 | 12/15/2011 | 12/15/2011 | P | PASS |
Dave Hannah
|
|
|
Trent Phone #: ###-####
|
BLD-Final | 11/9/2011 | 11/15/2011 | 12/15/2011 | A | CANC |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 12/14/2011 | 12/15/2011 | 12/15/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 11/1/2011 | 11/1/2011 | 11/9/2011 | P | CANC |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 11/3/2011 | 11/4/2011 | 11/4/2011 | A | CANC |
Troy Cobbley
|
|
|
Per Trent and Brad the fire alarm system modification will not be complete today. Life safety will be rescheduled. No inspection was performed.
|
BLD-Final | 11/3/2011 | 11/4/2011 | 11/4/2011 | A | CANC |
Dave Hannah
|
|
|
Trent Phone #: ###-####
|
FIRE-Final Inspection | 10/31/2011 | 11/1/2011 | 11/1/2011 | A | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm is not ready. No inspection was performed.
|
BLD-Framing/Rough-in | 9/26/2011 | 9/27/2011 | 9/28/2011 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 9/12/2011 | 9/12/2011 | 9/13/2011 | P | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 9/9/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (425) | 8/25/2011 | 8/25/2011 | 8/30/2011 | | PASS |
Dave Hannah
|
|
|
|
Routing - PLAN CHECK | 8/25/2011 | | 8/30/2011 | | PASS |
Dave Hannah
|
|
|
|
Case Summary (BLD) | | | 8/30/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2011 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2011 | | DONE |
|
|
|
t/c w cornel - permit ready and fees given
|
Override - Parcel Holds | | | 8/30/2011 | | |
|
|
|
|
Override - Parcel Holds | | | 8/30/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 8/30/2011 | | DONE |
|
|
|
|
Routing - PLUMBING | 8/29/2011 | | 8/29/2011 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - MECHANICAL | 8/29/2011 | | 8/29/2011 | | PASS |
Troy James
|
|
|
|
Application received | | 8/25/2011 | 8/25/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/25/2011 | | PASS |
Dave Hannah
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/25/2011 | | DONE |
Tisha Gallop
|
|
|
|