Permanent Occupancy | | | 8/29/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/1/2012 | 8/2/2012 | 8/2/2012 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
FIRE-Final Inspection | 7/17/2012 | 7/17/2012 | 7/17/2012 | P | PASS |
Forrest France
|
|
|
Correction items finished. Life safety passed.
|
FIRE-Conference | 7/10/2012 | 7/10/2012 | 7/10/2012 | P | DONE |
Forrest France
|
|
|
Lawrence phone #: ###-#### Conversation with building owner regarding correction notice items.
|
FIRE-Final Inspection | 5/1/2012 | 5/1/2012 | 5/1/2012 | P | NR |
Forrest France
|
|
|
Final pending remainder of previous C/N items.
|
FIRE-Final Inspection | 4/18/2012 | 4/19/2012 | 4/19/2012 | P | FAIL |
Forrest France
|
|
|
Correction items include items # 2, 4 and 8 on the list of general requirements attatched to the permit documents. Mount fire extinguishers no higher than 48" above finish floor, remove the manual thumbturn at one office door, missing ceiling and fire sprinkler coverage at one area in the breakroom.
|
Issue PAID IN FULL permit | | | 4/18/2012 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/17/2012 | | |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 4/17/2012 | | 4/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 4/17/2012 | | 4/17/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 4/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 4/17/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/17/2012 | | |
|
|
|
|
Telephone call | | | 4/17/2012 | | |
|
|
|
4-17-12 called left message permit ready ///dld
|
Intake Approval | | | 4/10/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | 4/9/2012 | | | |
|
|
|
|