BLD-Final | 6/20/2012 | 6/20/2012 | 6/20/2012 | P | PASS |
Dave Hannah
|
|
|
Randy Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 6/20/2012 | 6/20/2012 | 6/20/2012 | P | PASS |
Forrest France
|
|
|
Corrections completed with the exception of main door hardware repairs underway- to be finished prior to structural final.
|
Permanent Occupancy | | | 6/20/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 6/8/2012 | 6/11/2012 | 6/11/2012 | P | PEND |
Tony Young
|
|
|
|
FIRE-Final Inspection | 6/8/2012 | 6/11/2012 | 6/11/2012 | A | FAIL |
Forrest France
|
|
|
Post one fire extinguisher at each floor level, provide approved hardware at the main entry/exit door as discussed.
|
Permit Ready to Issue | | | 6/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 6/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/8/2012 | | DONE |
Tisha Gallop
|
|
|
called Randy and left vm permit is ready.
|
Issue PAID IN FULL permit | | | 6/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 5/30/2012 | | 6/7/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/5/2012 | | 6/7/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 6/7/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/7/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 6/5/2012 | 6/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/30/2012 | | DONE |
Tisha Gallop
|
|
|
|