Print Statement | | | 10/3/2013 | | DONE |
|
|
|
|
Third Notice | | 9/3/2013 | 9/19/2013 | | DONE |
|
|
|
|
Second Notice | | 8/10/2013 | 8/29/2013 | | DONE |
|
|
|
|
First Notice | | 6/30/2013 | 7/31/2013 | | DONE |
Christina Prado
|
|
|
mailed 8/1
|
Permanent Occupancy | | | 6/20/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 6/19/2013 | 6/19/2013 | 6/19/2013 | P | PASS |
Tony Young
|
|
|
clint Phone #: ###-####
|
BLD-Final | 6/13/2013 | 6/14/2013 | 6/14/2013 | A | FAIL |
Jim Storey
|
|
|
clint Phone #: ###-#### 1 1/2 at handrail west side of stage so door makes clearance/ block ramp in back on south side exit ramp to the north.
|
BLD-Final | 6/12/2013 | 6/13/2013 | 6/13/2013 | A | NR |
Jim Storey
|
|
|
clint Phone #: ###-#### need mec sign off/ no insp.
|
FIRE-Final Inspection | 6/3/2013 | 6/4/2013 | 6/4/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory. Noted correction items finished.
|
FIRE-Conference | 5/28/2013 | 5/28/2013 | 5/28/2013 | A | DONE |
Forrest France
|
|
|
Items noted during walkthrough include; building address location, missing exit discharge lighting, missing two exit signs from the kids chruch, missing EM lighting at room 123, door hardware at four breakout rooms and four meeting rooms is non-compliant, repair three EM lights, missing two exit signs at the lobby/lg. meeting room, overspaced fire extinguishers, mechanical mezzanine not shown on plans, missing small documents including the fire code review notes. Need to remove planter at the main entry/exit, post max. occupant load signage per plan annotations.
|
BLD-Final | 5/24/2013 | 5/24/2013 | 5/24/2013 | P | NR |
Mike Jordan
|
|
|
Clint Phone #: ###-####. Needs fire/life/safety finals.
|
FIRE-Conference | 5/23/2013 | 5/23/2013 | 5/23/2013 | A | DONE |
Forrest France
|
|
|
Discussion with contractor regarding fire life safety conditions for final approval, project schedule and related FIR trade work corrections.
|
FIRE-Conference | 5/14/2013 | 5/14/2013 | 5/14/2013 | P | DONE |
Forrest France
|
|
|
Regarding project related FIR trade permit work.
|
BLD-Energy code compliance | 5/13/2013 | 5/13/2013 | 5/13/2013 | P | DONE |
Tony Young
|
|
|
Clint Phone #: ###-####
|
BLD-Energy code compliance | 4/17/2013 | 4/18/2013 | 4/18/2013 | A | PART |
Tony Young
|
|
|
Clint Phone #: ###-####,, bathroom walls ok,, conf on stage frame/insulation/sprinklers,, pending clarification
|
BLD-Energy code compliance | 4/8/2013 | 4/9/2013 | 4/10/2013 | P | PART |
Tony Young
|
|
|
clint Phone #: ###-####,, ok to cover interior walls (steel studs)
|
BLD-Wall cover | 3/21/2013 | 3/22/2013 | 3/22/2013 | A | PART |
Tony Young
|
|
|
Clint Phone #: ###-####,, some interior walls on north side ok for cover,, pending trades
|
BLD-Framing/Rough-in | 3/14/2013 | 3/15/2013 | 3/15/2013 | A | PART |
Tony Young
|
|
|
Clint Phone #: ###-####,, north interior walls ok to insulate,, pending elec. rough pass,,, talked to architect,, he will get as built or change ok for wall types
|
Permit Ready to Issue | | | 2/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 2/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 2/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CJW) | 1/8/2013 | 1/8/2013 | 2/8/2013 | | PASS |
Carl Westfall
|
|
|
THE PURSUIT CHURCH (20 days - Feb 4) ePlanReview
|
Routing PW Sewer Rating | 2/7/2013 | | 2/8/2013 | | PASS |
Connie Baumgartner
|
|
|
Doesn't appear to have been routed to Connie the 1st time.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/6/2013 | | 2/7/2013 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines" after the 2nd review.
|
Routing - PLUMBING | 2/7/2013 | | 2/7/2013 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Plan resubmittals received | | | 2/6/2013 | | DONE |
|
|
|
|
1st review completed | | | 2/1/2013 | | FAIL |
|
|
|
Failed plumbing and building
|
Routing - PLAN CHECK | 1/8/2013 | | 2/1/2013 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Jan 29 and was finished on Feb 1. Revised drawings were required. See the plan review report.
|
Plan resubmittals received | | | 1/24/2013 | | |
|
|
|
Received 2 copies of sheets P2.3 and given to Bill VanDeGrift
|
Routing - FIRE | 1/8/2013 | | 1/15/2013 | | PASS |
Scott Arellano
|
|
|
Attached plan review comments to plans.
|
Routing - PLUMBING | 1/8/2013 | | 1/11/2013 | | FAIL |
Bill VanDegrift
|
|
|
1)provide information on services to baptistry
2)note: verify existing water service protection
|
Routing PW Solid Waste | 1/8/2013 | | 1/10/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Plan Reviewer's activity | | | 1/8/2013 | | DONE |
Jason Blais
|
|
|
Emailed architect representative to have him contact ACHD for evaluation of any additional impact fees. Written verification is to be provided to our Permit Counter prior to the building permit being issued.
|
Routing - Addressing | 1/8/2013 | | 1/8/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 1/8/2013 | | 1/8/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 1/8/2013 | | 1/8/2013 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - CZC12-00265
|
Intake Approval | | | 1/8/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Pending Assignment by JCB | 1/8/2013 | | 1/8/2013 | | DONE |
Jason Blais
|
|
|
|
Payment Received | | | 12/26/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 12/26/2012 | | FAIL |
Tim L. Woodard
|
|
|
Hello Jeff,
After reviewing the submitted documents for Pursuit Church the follow items are needed before proceeding: upload a copy of the CZC12-00296 into the documents folder, provide structural calculations for the new rooftop units, provide structural calculations for the new floor (platform) construction, and provide structural calculations and details for the new platform lift. I have also marked up the submittal checklist and uploaded it for your review. Please contact me with any questions.
Best regards,
Tim Woodard
City of Boise
twoodard@cityofboise.org
|
Application received | | | 12/24/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 24 2012 10:52AM
|