BLD-Footing | 3/12/2018 | 3/13/2018 | 3/13/2018 | A | PASS |
Jim Sly
|
|
|
Footing inspection can be done later in the AM tomorrow. Marcus will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Routing Walk-In (BLD) | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/12/2018 | | 3/12/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/12/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/12/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/12/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 3/12/2018 | | DONE |
|
|
|
plans were not supposed to be voided-Rich was just waiting for roof mouint engeering so changed status back to rev and sent Rich to res building plan reviewer
|
Routing Walk-In (Zoning) | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | FAIL |
Brian McGowan
|
|
|
Engineering must be updated to current code cycle.
|
1st review completed | | | 2/27/2018 | | FAIL |
Brian McGowan
|
|
|
Engineering must be updated to current code cycle.
|
Routing - PLAN CHECK | 2/27/2018 | | 2/27/2018 | | FAIL |
Brian McGowan
|
|
|
Engineering must be updated to current code cycle.
|
VOIDED CHANGE STATUS | | | 2/27/2018 | | DONE |
|
|
|
as per Brian McGowan-Rich asked that we void this permit-not doing job right now-needs new engineering
|
Application received | | | 2/16/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 16 2018 11:10AM
|
Intake Approval | | | 2/16/2018 | | FAIL |
|
|
|
all drawings and docs need to be facing the correct way
|
Intake Approval | | | 2/16/2018 | | FAIL |
|
|
|
Did not make corrections
|