BLD-Aging Inspection | 6/24/2020 | 6/24/2020 | 6/25/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 6/23/2020 | 6/23/2020 | 6/24/2020 | | PEND |
Tell Riley
|
|
|
no inspection have been requested
|
BLD-Footing | 2/7/2020 | 2/10/2020 | 2/10/2020 | P | PART |
Tell Riley
|
|
|
Bob Phone #: ###-####//WIP//holes will need to be 24 " working on--rebar being tied and installed//discussed cold weather concrete--will need blankets//east side setback is 6 ft plus based on back property pin//
|
Permit Ready to Issue | | | 9/17/2019 | | DONE |
|
|
|
|
Telephone call | | | 9/17/2019 | | DONE |
|
|
|
called Allen to let know permit is ready and how much is owed-left message on his phone
|
Issue PAID IN FULL permit | | | 9/17/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 8/30/2019 | 8/30/2019 | 9/16/2019 | | PASS |
Josh Bogle
|
|
|
09/06 patio cover, paper - 1st done
|
Routing - PLAN CHECK | 9/16/2019 | | 9/16/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/16/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/16/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Plan Reviewer's activity | | | 9/13/2019 | | DONE |
Josh Bogle
|
|
|
called Bryan for clarification on the portal frame - left a message
|
Plan resubmittals received | | | 9/9/2019 | | DONE |
|
|
|
2 large plans- resubmital for wall shear and window in dining
|
Routing - PLAN CHECK | 9/3/2019 | | 9/3/2019 | | FAIL |
Josh Bogle
|
|
|
see e-mail to Bryan
|
1st review completed | | | 9/3/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2 for consulation with Bryan &/or Kaleb
|
Routing Walk-In (Zoning) | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Sue Cummings
|
|
|
|
Application received | | 8/30/2019 | | | |
|
|
|
|