BLD-Framing/Rough-in | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PASS |
Mike Jordan
|
|
|
call ahead - screened // Gary Phone #: ###-####. Interior steel stud framed demissing wall only.
|
Plan assigned to (JG) | 5/12/2020 | 5/12/2020 | 6/3/2020 | | PASS |
Javier Guzman
|
|
|
06/02 2nd rev Plan Mod Vanilla - 8105 W. Fairview Ave ePlan
|
Routing - PLAN CHECK | 5/27/2020 | | 6/3/2020 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 6/3/2020 | | DONE |
|
|
|
PLAN MOD
|
CHANGE STATUS TO (ISS) | | | 6/3/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/18/2020 | | 5/22/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 5/18/2020 | | 5/18/2020 | | PASS |
Troy James
|
|
|
please sign off in Tidemark BLD20-01013 also
|
Plan Reviewer's activity | | | 5/13/2020 | | DONE |
Javier Guzman
|
|
|
Plan Mod Prescreen failed for the following Revised plan sheets E000, E101, E110, E201 and E202 requires engineers stamp
|
Plan Modification Accepted | | | 5/12/2020 | | DONE |
|
|
|
plan mod
|
Issue PAID IN FULL permit | | | 4/29/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/29/2020 | | DONE |
|
|
|
|
Telephone call | | | 4/29/2020 | | DONE |
|
|
|
email permitsBLD20-01013 & 00824 and inspection card- to kaitlyn@yg-construction.com and cory@yg-construction.com
Release Eplan
|
Plan assigned to (JG) | 3/25/2020 | 3/25/2020 | 4/21/2020 | | PASS |
Javier Guzman
|
|
|
04/20 2nd rev L2 Shopko Division ePlan, pend eng
|
Routing Off Site - STRUCTURAL | 4/15/2020 | | 4/21/2020 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/21/2020 | | DONE |
|
|
|
ALL MET (please email both kaitlyn@yg-construction.com and cory@yg-construction.com the permit to sign)
Need (DO NOT ISSUE WITHOUT BLD20-01013)
Revised Cert of Value
GC Form
|
Routing - PLAN CHECK | 4/15/2020 | | 4/15/2020 | | PASS |
Javier Guzman
|
|
|
|
Route to Impact Fee Review | 4/8/2020 | 4/11/2020 | 4/8/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/8/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 3/25/2020 | | 4/8/2020 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers
|
Routing - PLAN CHECK | 3/25/2020 | | 4/7/2020 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 3/25/2020 | | 4/6/2020 | | PASS |
Doug Chausow
|
|
|
signed off in ePlan By Doug Chausow
|
Routing - FIRE | 3/25/2020 | 3/25/2020 | 4/3/2020 | | PASS |
Greg Ruxton
|
|
|
Comments attached to case.
|
Routing PW Solid Waste | 3/26/2020 | | 3/27/2020 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PUBLIC WORKS | 3/25/2020 | | 3/26/2020 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
Routing - MECHANICAL | 3/25/2020 | | 3/26/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 3/25/2020 | | 3/26/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Routing - Design Review | 3/25/2020 | | 3/26/2020 | | PASS |
Michaella Owens
|
|
|
|
Intake Approval | | | 3/25/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 3/11/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Provide a second completed 518 application for the division of the whole tenant and created new second tenant space (the uploaded application can be for either for the left side and this new application can be for the right side)
• Provide engineering calculations for the new RTU location stamped and signed by an Idaho licensed engineer
• Provide engineering calculations for the new exterior wall opening stamped and signed by an Idaho licensed engineer
• Provide a completed form 310 that is also stamped, signed and dated by an Idaho licensed engineer (per plan sheet S000). Form 310 can be found at https://www.cityofboise.org/media/3760/final310_special_inspections.pdf
• Provide DR letters of approval for new exterior opening
• Provide plumbing plan P101 stamped and signed by an Idaho licensed plumbing engineer
|
Application received | | | 3/8/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 8 2020 8:52PM
|