INSP - Final | 2/4/1997 | 2/4/1997 | 2/4/1997 | P | FAIL |
Carl Dependahl
|
|
|
02/04/97 340 - left c/n, need all ok's, eng's ok, etc
|
INSP - Final | 1/30/1997 | 1/31/1997 | 1/31/1997 | A | CANC |
Alan Hauser
|
|
|
01/31/97 350 - to be done by #333
|
INSP - Final | 1/31/1997 | 1/31/1997 | 1/31/1997 | | FAIL |
|
|
|
FINAL FAIL FIRE EXT LANDING AT EXIT DOOR EXIT SIGNS MANUAL FLUSH BOLTS ON 4 EXIT DOUBLE DOORS
|
(F) Reprint permit | | | 1/29/1997 | | |
|
|
|
|
INSP - Foundation | 11/27/1996 | 11/27/1996 | 11/27/1996 | P | PART |
Wes Worcester
|
|
|
structural slab
|
INSP - Foundation | 9/4/1996 | 9/5/1996 | 9/5/1996 | A | PART |
Wes Worcester
|
|
|
submitting engineering change and verification of design/cover
|
INSP - Foundation | 8/30/1996 | 9/3/1996 | 9/3/1996 | A | NR |
Wes Worcester
|
|
|
NORTHWEST
|
INSP - Foundation | 8/23/1996 | 8/26/1996 | 8/26/1996 | P | NR |
Wes Worcester
|
|
|
|
INSP - Foundation | 8/26/1996 | 8/26/1996 | 8/26/1996 | P | PART |
Wes Worcester
|
|
|
placing dobbies and cleaning out loose soil under rebar no transfer of special inspection process through City
|
INSP - Foundation | 8/26/1996 | 8/26/1996 | 8/26/1996 | P | FAIL |
Wes Worcester
|
|
|
inadequate cover under #7 bar and not to resubmitted print as #5 mat not placed
|
INSP - Footings | 8/23/1996 | 8/23/1996 | 8/23/1996 | P | NR |
Wes Worcester
|
|
|
this permit says it done is it realy?????? NOT REALLY>>>>CHECK DUPLICATE ERRONEOUS ENTRIES AND COMMERICIAL DOES NOT GET A LETTER OF COMPLIANCE !!!!!!
|
CHANGE STATUS TO (D) | | | 8/15/1996 | | |
|
|
|
|
CHANGE STATUS TO (FNL) | | | 8/15/1996 | | FNL |
|
|
|
|
INSP - Site Preparation | 8/5/1996 | 8/5/1996 | 8/5/1996 | A | PART |
Wes Worcester
|
|
|
noted area of change order as requested by plan ck
|
INSP - Conference | 8/5/1996 | 8/5/1996 | 8/5/1996 | A | PART |
Wes Worcester
|
|
|
met w/M Philips and he requested site inspection
|
INSP - Conference | 7/31/1996 | 7/31/1996 | 7/31/1996 | A | PASS |
Wes Worcester
|
|
|
discussed masonry ties for rebar
|
INSP - Masonry | 7/31/1996 | 7/31/1996 | 7/31/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Swimming pool | 7/30/1996 | 7/31/1996 | 7/31/1996 | P | CANC |
Wes Worcester
|
|
|
pool rebar could not find pool
|
INSP - Foundation | 5/29/1996 | 5/30/1996 | 5/24/1996 | P | PART |
Wes Worcester
|
|
|
05/29/96 342 -
|
INSP - Foundation | 5/23/1996 | 5/24/1996 | 5/18/1996 | A | NR |
Wes Worcester
|
|
|
05/23/96 342 - FND.REBAR CONTRACTORS NOWTHWEST IS THE ONE WHO CALLED.
|
INSP - Foundation | 5/18/1996 | 5/18/1996 | 5/18/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - rebar at Americana for a weir
|
INSP - Foundation | 5/15/1996 | 5/16/1996 | 5/11/1996 | P | NR |
Wes Worcester
|
|
|
05/15/96 342 -
|
INSP - Foundation | 5/8/1996 | 5/9/1996 | 5/3/1996 | A | PART |
Wes Worcester
|
|
|
05/08/96 342 - REBAR..CONTRACTOR NORTHWEST
|
INSP - Footings | 5/2/1996 | 5/6/1996 | 4/30/1996 | A | PART |
Wes Worcester
|
|
|
05/06/96 342 - appointment for 8:30 to 9 a.m.
|
INSP - Footings | 4/25/1996 | 4/26/1996 | 4/20/1996 | A | FAIL |
Wes Worcester
|
|
|
04/25/96 342 - SLAB cover, add bar not done, conduit tied to bar
|
INSP - Foundation | 4/24/1996 | 4/25/1996 | 4/20/1996 | P | NR |
Wes Worcester
|
|
|
04/25/96 342 - FLOOR SLAB..FRI PM
|
INSP - Flatwork | 4/20/1996 | 4/20/1996 | 4/20/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Flatwork | 4/20/1996 | 4/20/1996 | 4/20/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - cover inadequate, rebar tied to conduit, added bar not corre
|
INSP - Flatwork | 4/19/1996 | 4/19/1996 | 4/19/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - late pm thurs min cover lacking at forms and around conduit. still adding added bar. N
|
INSP - Foundation | 4/11/1996 | 4/11/1996 | 4/11/1996 | P | PASS |
|
|
|
FND. REBAR main pump room at east side
|
INSP - Foundation | 4/10/1996 | 4/11/1996 | 4/11/1996 | A | PASS |
|
|
|
REBAR
|
INSP - Foundation | 4/8/1996 | 4/9/1996 | 4/9/1996 | A | PASS |
Wes Worcester
|
|
|
REBAR
|
INSP - Foundation | 4/2/1996 | 4/3/1996 | 3/30/1996 | A | CANC |
Wes Worcester
|
|
|
04/02/96 342 - REBAR
|
INSP - Foundation | 4/3/1996 | 4/3/1996 | 3/30/1996 | P | NR |
Wes Worcester
|
|
|
04/03/96 342 - FND.REBAR.
|
INSP - Foundation | 3/30/1996 | 3/30/1996 | 3/30/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - slab pour ok, Eric to check clearance of side boards not yet
|
INSP - Foundation | 3/28/1996 | 3/28/1996 | 3/24/1996 | P | FAIL |
Wes Worcester
|
|
|
03/28/96 342 - SLAB REBAR change of design and deletion of a beam from approved plan. resubmit cha in duplicate with engineering. do not cover rebar
|
INSP - Foundation | 3/19/1996 | 3/19/1996 | 3/19/1996 | P | PART |
Wes Worcester
|
|
|
WALLS - REBAR special inspector on site
|
INSP - Foundation | 3/18/1996 | 3/18/1996 | 3/14/1996 | P | NR |
Wes Worcester
|
|
|
03/18/96 342 - spec insp on site, not ready earlier
|
INSP - Foundation | 3/13/1996 | 3/13/1996 | 3/13/1996 | P | PART |
Wes Worcester
|
|
|
fnd.rebar looked ok what was done, special insp on site
|
INSP - Flatwork | 3/7/1996 | 3/7/1996 | 3/7/1996 | P | PASS |
Wes Worcester
|
|
|
SLAB REBAR INSP. ok and special inspector on site
|
INSP - Foundation | 3/5/1996 | 3/5/1996 | 3/5/1996 | P | NR |
Wes Worcester
|
|
|
REBAR not done ck back 03/06/96 in am
|
INSP - Foundation | 3/1/1996 | 2/29/1996 | 3/1/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Foundation | 2/28/1996 | 2/29/1996 | 2/29/1996 | A | NR |
Wes Worcester
|
|
|
REBAR not ready will be back at 10 am 03/01/96
|
INSP - Foundation | 2/16/1996 | 2/16/1996 | 2/16/1996 | P | PART |
Wes Worcester
|
|
|
SPECIAL INSP. ON SITE.
|
INSP - Foundation | 2/15/1996 | 2/15/1996 | 2/15/1996 | A | NR |
Wes Worcester
|
|
|
inadequate cover, special inspector on site
|
INSP - Foundation | 2/14/1996 | 2/14/1996 | 2/14/1996 | P | NR |
Wes Worcester
|
|
|
fnd.rebar spec insp on site
|
INSP - Conference | 2/13/1996 | 2/13/1996 | 2/13/1996 | | FAIL |
|
|
|
called Joel asking for engineer's report on masonry wall
|
INSP - Conference | 2/12/1996 | 2/12/1996 | 2/12/1996 | | FAIL |
|
|
|
could not find Joel RE: Engineer's report on masonry const
|
INSP - Conference | 2/8/1996 | 2/9/1996 | 2/9/1996 | | PART |
|
|
|
poured 2nd section of clarifier w/spec insp on site
|
INSP - Foundation | 2/5/1996 | 2/6/1996 | 2/6/1996 | A | PASS |
|
|
|
02/05/96 338 -
|
INSP - Foundation | 1/31/1996 | 2/1/1996 | 2/1/1996 | A | PART |
Wes Worcester
|
|
|
REBAR pouring and notified spec insp of difficulty w/tremmie
|
INSP - Foundation | 1/16/1996 | 1/17/1996 | 1/17/1996 | A | NR |
Wes Worcester
|
|
|
01/16/96 342 - FND.REBAR still have clearance problems
|
INSP - Masonry | 1/17/1996 | 1/17/1996 | 1/17/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - spec insp on site but was only going to look at 3000 psi con
|
INSP - Foundation | 1/11/1996 | 1/11/1996 | 1/11/1996 | P | FAIL |
Wes Worcester
|
|
|
01/11/96 342 - ftg, stem wall & slab poured or being poured w/o approval Report pending as well as engineers design and acceptance..2 story CMU blding next to raceway. Notified Joel and Jim Cox. No ftg or brng earth
|
INSP - Foundation | 1/11/1996 | 1/11/1996 | 1/11/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - special insp on site for walls west of clarifier. log and re
|
INSP - Foundation | 1/11/1996 | 1/11/1996 | 1/11/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - wall west of clarifier
|
INSP - Footings | 1/11/1996 | 1/11/1996 | 1/11/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - poured last 1/4 of clarifier w/special insp on site. log and
|
INSP - Foundation | 1/9/1996 | 1/10/1996 | 1/10/1996 | A | NR |
Wes Worcester
|
|
|
01/10/96 342 - REBAR
|
INSP - Conference | 1/10/1996 | 1/10/1996 | 1/10/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - Discussed special insp process, min cover and min code compl will have min code compliance and if deficient const is found again I wi stop const until deficiency is corrected. We will have final acceptance, irregardless what the sp
|
INSP - Foundation | 1/10/1996 | 1/10/1996 | 1/10/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - 2nd story poured w/special insp on site
|
INSP - Footings | 1/10/1996 | 1/10/1996 | 1/10/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - for 2 story addn over slurry and conduit. no epoxy in drille
|
INSP - Footings | 1/10/1996 | 1/10/1996 | 1/10/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - For 2nd story poured w/o insp., require letter from engineer is ok.. Notified Joel, Jim, and Eric.
|
INSP - Foundation | 1/8/1996 | 1/8/1996 | 1/8/1996 | P | PART |
Wes Worcester
|
|
|
waiting on engineering for masonry wall not on a ftg or brng earth
|
INSP - Footings | 1/5/1996 | 1/5/1996 | 1/5/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - footings for 2nd story addn not ready and is over electrical super of concerns and will ck bk later
|
INSP - Footings | 1/4/1996 | 1/5/1996 | 1/5/1996 | A | FAIL |
Wes Worcester
|
|
|
01/05/96 342 - not ready... no epoxy on rebar in 3" hole into old cement
|
INSP - Conference | 1/4/1996 | 1/4/1996 | 1/4/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - With Bob from CNI home office (owner) about special inspecti Maintained plan check criteria and we will get minimum code compliance
|
INSP - Foundation | 1/3/1996 | 1/4/1996 | 1/4/1996 | A | NR |
Wes Worcester
|
|
|
01/03/96 342 - rebar foundation
|
INSP - Foundation | 1/4/1996 | 1/4/1996 | 1/4/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - c/n removed as spec insp submitting report
|
INSP - Foundation | 12/28/1995 | 12/28/1995 | 1/4/1996 | P | FAIL |
Wes Worcester
|
|
|
12/28/95 342 - c/n issued re: spec insp not on site, 2" of cover needed and no concern demostrated by individuals on site. Notified super
|
INSP - Footings | 12/21/1995 | 12/21/1995 | 12/21/1995 | P | PART |
Wes Worcester
|
|
|
12/21/95 342 - THIS WAS CALLED IN FOR THE 20TH. POURED W/ SPECIAL INSP ON SITE
|
INSP - Footings | 12/21/1995 | 12/21/1995 | 12/21/1995 | P | PART |
Jim Sly
|
|
|
THIS WAS CALLED IN FOR YESTERDAY. spec insp to be on site
|
INSP - Foundation | 12/18/1995 | 12/18/1995 | 12/19/1995 | P | PART |
Wes Worcester
|
|
|
12/18/95 342 - rebar without adequate cover, Joel will have pad regraded
|
INSP - Footings | 12/8/1995 | 12/8/1995 | 12/8/1995 | P | PART |
Wes Worcester
|
|
|
12/08/95 342 - SPECIAL INSPECTORS ON JOB..... poured
|
INSP - Foundation | 11/27/1995 | 11/28/1995 | 11/28/1995 | A | FAIL |
|
|
|
FND.REBAR cover inadequate
|
INSP - Carpentry | 11/20/1995 | 11/20/1995 | 11/20/1995 | P | PART |
Wes Worcester
|
|
|
/ / 342 - rebar insp.
|
INSP - Conference | 11/17/1995 | 11/16/1995 | 11/16/1995 | | PART |
Jim Sly
|
|
|
|
INSP - Conference | 11/16/1995 | 11/16/1995 | 11/16/1995 | P | NR |
Wes Worcester
|
|
|
11/16/95 342 - MEETING AT 3PM.
|
INSP - Footings | 11/15/1995 | 11/15/1995 | 11/15/1995 | P | PART |
Jim Sly
|
|
|
REBAR spec insp to be on site
|
INSP - Foundation | 10/31/1995 | 11/2/1995 | 11/2/1995 | A | FAIL |
Jim Sly
|
|
|
cover inadequate
|
INSP - Footings | 11/1/1995 | 11/1/1995 | 11/1/1995 | | FAIL |
|
|
|
|
INSP - Foundation | 10/31/1995 | 11/1/1995 | 11/1/1995 | A | FAIL |
Jim Sly
|
|
|
REBAR
|
(F) Issue permit | | | 8/9/1995 | | |
|
|
|
|
Plan Reviewer's Copy of Permit | | | 8/7/1995 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/1995 | | |
|
|
|
|
Plan Reviewer's Copy of Permit | | | 8/7/1995 | | DONE |
|
|
|
|
Routing - FIRE | 7/26/1995 | | 7/27/1995 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/26/1995 | | DONE |
|
|
|
ALL ACTIONS AND COMMENTS FOR BLD PERMITS NUMBERED BELOW ARE LISTED ON THIS PERMIT #95-0583 * #95-0595 *95-0595
|
Routing - PLUMBING | 6/22/1995 | | 6/22/1995 | | DONE |
|
|
|
|
Routing - ELECTRICAL | 6/19/1995 | | 6/19/1995 | | DONE |
|
|
|
|
Routing - PLANNING | 6/13/1995 | | 6/13/1995 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 6/12/1995 | | 6/12/1995 | | DONE |
|
|
|
|
Application received | | | 6/7/1995 | | DONE |
|
|
|
waiting for contractor information
|
INSP - Foundation | 1/25/1996 | 1/26/1996 | 1/26/1995 | A | PART |
Wes Worcester
|
|
|
poured FND.REBAR inspected w/special inspector on site.
|
ISSUE ACTIONS | | | | | |
|
|
|
|
PRINT ACTIONS | | | | | |
|
|
|
|
Application received | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|